← Back
BuildNYC
Over six families without stores
2828 STILLWELL AVENUE
BROOKLYN · BIN 3321738
💬 Discuss this project
1930Year Built
2Stories
C1Building Class
R6Zoning
3,962 sfGross Floor Area
8Units
Rent Stabilized71 Active Violations 69 unresolved · 2 paperwork only 4 old, status unconfirmed ▸FDNY Report ↗
Over six families without stores · Owner of record: 2828 Stillwell Ave · 3,198 sf lot · 1.24 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralMechanicalPlumbingLandscapeGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofInterior renovation of 2 apartmentsUnder Construction3p · 1 filing · 16 docs
Floor 2Interior renovation of 2 apartmentsUnder Construction19p · 2 filings · 20 docs
Floor 1Interior renovation of 2 apartmentsUnder Construction17p · 2 filings · 20 docs
BasementInterior renovation of 2 apartmentsUnder Construction3p · 2 filings · 20 docs
Sub-BasementInterior renovation of 2 apartmentsUnder Construction15p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Aans403/21/2026
NYC Department of Housing Preservation and Development103/21/2026
2828 Stillwell Ave103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/02/2020$901K—Private party → 8221 STILLWELL AVE 4 LLC$228/sf building
03/02/2020$958K—8221 STILLWELL AVE 4 LLC → AANS LLC$242/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Versatile Engineering1208/06/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Smart Plumbing & HeatingPlumbing1007/08/2026
Jacobs DevelopmentGeneral Contractor303/21/2026
Dynamic DevelopmentGeneral Contractor104/09/2026
Creative Touch ConstructionGeneral Contractor108/01/2019
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PSI Agency2541008/06/2023
Building Lifecycle
08/24/2026
Signed off — Alteration
PAA IN ORDER TO CHANGE MAXIMUM ALLOWABLE WORKING PRESSURE (MAWP) FROM 150 PSI TO 30 PSI
B00358311-I1
05/06/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
04/03/2026
Closed: Failure to certify correction on immediately hazardous (class 1) ECB violation
DOB violation · closed on the city's record
03/11/2026
Permit renewed — General Construction
Renewed with changes
B00578862-I1-GC
11/14/2025
Failure to file 2024 external low pressure inspection
DOB violation · open
256 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedDynamic Development03/11/2026
DOB NOWPlumbingSigned-offSmart Plumbing & Heating06/10/2023
DOB NOWBoiler EquipmentSigned-offSmart Plumbing & Heating06/05/2023
DOB NOWBoiler EquipmentSigned-offSmart Plumbing & Heating02/02/2023
DOB NOWPlumbingSigned-offSmart Plumbing & Heating11/09/2022
DOB NOWBoiler EquipmentSigned-offSmart Plumbing & Heating08/09/2022
DOB NOWGeneral ConstructionPermit IssuedJacobs Development07/11/2022
BISOTISSUEDCreative Touch Construction08/01/2019
BISFBISSUEDBlue Diamond Fuel Oil12/12/2002
2 projects · most recent 08/06/2023
Gas
FiledStatusContractorScope
08/06/2023Signed-offSmart Plumbing & HeatingGas
03/27/2023Signed-offSmart Plumbing & HeatingGas
2 projects · most recent 06/08/2020
General Wiring
FiledStatusContractorScope
06/08/2020Permit IssuedForest Brook Electrical ContractingGeneral Wiring
04/10/2019CompleteDeltex Electrical Cont. I—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
08/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
07/28/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/25/2023Pass-Final Boiler Equipment InspectionPassView ↗
07/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/10/2023Pass-Final Boiler Equipment InspectionPassView ↗
02/06/2023No Access-Final Boiler Equipment InspectionNo AccessView ↗
11/16/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/16/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
08/08/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
08/08/2023Tenant Protection Plan ComplianceMAURICIO ANDRADEspecial
08/04/2023Tenant Protection Plan Compliance—special
08/04/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
03/24/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/15/2023Heating SystemsMAURICIO ANDRADEspecial
02/15/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/10/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
02/10/2023Heating SystemsMAURICIO ANDRADEspecial
02/06/2023Heating SystemsMAURICIO ANDRADEspecial
02/06/2023Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/22/2022Fire-Resistant Penetrations and JointsMAURICIO ANDRADEspecial
09/22/2022Heating SystemsMAURICIO ANDRADEspecial
10/25/2021Structural Stability – Alterations of existing buildingsMAURICIO ANDRADEspecial
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account