← Back
Walk-up apt, over six families with stores
2829 8 AVENUE
MANHATTAN · BIN 1079807
💬 Discuss this project
1900Year Built
6Stories
C7Building Class
R7-2Zoning
23,058 sfGross Floor Area
47Units
Rent Stabilized90 Open Violations 85 unresolved · 5 paperwork only ▸
Walk-up apt, over six families with stores · Owner of record: HARLEM URBAN DVLP CORP · 9,983 sf lot · 2.31 FAR built · Flood zone X
Locations of Work
MechanicalFire Protection
Roof1p · 1 filing · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GALAXY GEN CONTRACTING807/08/2026
KINGS GROUP NY1207/08/2026
COAST GROUP904/09/2026
AT&T503/22/2026
HARLEM URBAN DR LP CORP103/22/2026
HARLEM URBAN DVLP CORP403/22/2026
HARLEM URBAN DVLP CORP 40103/22/2026
C/O 2825 8TH AVE ASSOCS H303/22/2026
HARLAM URBAN DEVEL CORP103/22/2026
RINGS GROUP NY CORP103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AP PROFESSIONAL ENGINEERING PLLC509/15/2025
TECTONIC ENGINEERING105/21/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SANDEEP KAUR203/21/2026
CONSTRUCTION PERMIT SERVICES103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KINGS GROUP NY CORPGeneral Contractor707/08/2026
COAST GROUP CORPGeneral Contractor404/09/2026
GALAXY GENERAL CONTRACTINGeneral Contractor307/08/2026
OVERLAND CONTRACTING INCGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MSM ENGINEERING SERVICES,8449209/15/2025
TECTONIC ENGINEERING CONS106105/21/2019
Building Lifecycle
All (81)Filed (6)Permit Issued (11)Signed Off (2)Violation (60)Special Inspection (2)
07/07/2026
Signed off — Alteration
M01130705-I1
06/01/2026
Violation issued (ECB, open)
Elevators
03/05/2026
Permit issued — Sidewalk Shed
M01130705-I1-SH
12/08/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
C
11/19/2025
Violation issued (HPD, closed)
C
11/12/2025
Permit issued — Sidewalk Shed
M01130705-I1-SH
09/29/2025
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
09/15/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01115730-P3
09/12/2025
Special inspection requirement — Post-installed Anchors
MOHAMED MAHMOUD
09/11/2025
Permit issued — Supported Scaffold
M01115730-I1-SF
04/09/2025
Filed — Alteration
M01130705-P1
01/08/2025
Violation issued (HPD, open)
C
01/08/2025
Violation issued (HPD, closed)
C
01/08/2025
Violation issued (HPD, open)
C
11/13/2024
Signed off — Alteration
M00126614-I1
11/13/2024
Permit issued — Sidewalk Shed
M01130705-I1-SH
11/08/2024
Permit issued — Supported Scaffold
M01115730-I1-SF
10/25/2024
Filed — Alteration
M01130705-I1
10/03/2024
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY LIGHT DUTY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01115730-I1
08/22/2024
Violation issued (ECB, closed)
Unknown
05/27/2024
Violation issued (ECB, closed)
Construction
05/24/2024
Violation issued (ECB, open)
Construction
01/31/2024
Violation issued (HPD, open)
C
01/31/2024
Violation issued (HPD, closed)
C
01/31/2024
Violation issued (HPD, closed)
C
01/31/2024
Violation issued (HPD, open)
C
01/31/2024
Violation issued (HPD, open)
B
01/31/2024
Violation issued (HPD, open)
C
01/31/2024
Violation issued (HPD, open)
C
01/18/2024
Violation issued (HPD, open)
C
01/18/2024
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, closed)
B
12/27/2023
Violation issued (HPD, open)
C
12/27/2023
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, open)
B
11/08/2023
Permit issued — Sidewalk Shed
M00126614-I1-SH
11/02/2023
Violation issued (ECB, open)
Construction
10/31/2023
Violation issued (ECB, open)
Construction
10/12/2023
Violation issued (HPD, open)
A
04/24/2023
Violation issued (ECB, closed)
Construction
03/15/2023
Violation issued (HPD, closed)
A
02/07/2023
Violation issued (HPD, open)
C
12/05/2022
Permit issued — Sidewalk Shed
M00126614-I1-SH
11/03/2022
Violation issued (HPD, closed)
I
07/19/2022
Violation issued (ECB, closed)
Boilers
04/18/2022
Violation issued (ECB, open)
Boilers
02/15/2022
Violation issued (HPD, closed)
I
02/15/2022
Violation issued (HPD, closed)
A
01/27/2022
Violation issued (HPD, open)
C
01/27/2022
Violation issued (HPD, closed)
C
11/23/2021
Permit issued — Sidewalk Shed
M00126614-I1-SH
10/29/2021
Violation issued (ECB, closed)
Construction
Latest 60 of 81 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offCOAST GROUP CORP03/05/2026
DOB NOWSidewalk ShedSigned-offCOAST GROUP CORP11/12/2025
DOB NOWSupported ScaffoldPermit IssuedGALAXY GENERAL CONTRACTIN09/11/2025
DOB NOWSidewalk ShedSigned-offCOAST GROUP CORP11/13/2024
DOB NOWSupported ScaffoldPermit IssuedGALAXY GENERAL CONTRACTIN11/08/2024
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/08/2023
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP12/05/2022
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP11/23/2021
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP10/13/2020
DOB NOWAntennaPermit IssuedOVERLAND CONTRACTING INC06/18/2019
DOB NOWSidewalk ShedSigned-offKINGS GROUP NY CORP02/08/2019
BISFPISSUEDNY BUSINESS FIRE SYSTEMS INC04/05/2006
BISPLISSUEDCATMAN PLUMBING INC03/17/2006
BISOTISSUEDHONEY CONSTRUCTION & BUILDERS IN03/16/2006
BISEQISSUEDSAFWAY STEEL PRODUCTS07/07/1995
BIS—ISSUEDGENERAL CONTRACTING CORP07/01/1991
1 project · most recent 02/04/2019
FiledStatusContractorScope
02/04/2019Permit IssuedWCK ELECTRIC CORP.—
1 project · most recent 09/15/2025
Scaffold
FiledStatusContractorScope
09/15/2025Permit IssuedGALAXY GENERAL CONTRACTINScaffold
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
09/29/2025Post-installed AnchorsMOHAMED MAHMOUDspecial
09/12/2025Post-installed AnchorsMOHAMED MAHMOUDspecial
▾Documents — 21 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch4
08/24/2026M01130705-I1Request digital key ↗
08/24/2026M01130705-P1Request digital key ↗
08/21/2026M01115730-P3Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00126614-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/05/2026M00158683-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWFlood Zone Design Certification1
08/13/2026M00158683-I1Open ↗
▸DOB NOWFlood Zone Compliance1
08/13/2026M00158683-I1Open ↗
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/24/2026M01130705-P1Open ↗
08/24/2026M01130705-I1Open ↗
08/13/2026M00126614-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M01115730-P3Open ↗
08/27/2026M01115730-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00158683-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
08/13/2026M01115730-P3Open ↗
08/13/2026M01115730-I1Open ↗
▸Other Documents2
▸DOB NOWFlood Hazard Area Substantial Improvement Calculation1
08/13/2026M00158683-I1Open ↗
▸DOB NOWFEMA Elevation Certificate (086-0-33)/Flood Proofing Certificate (086-0-34)1
08/13/2026M00158683-I1Open ↗