← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
283 PRESIDENT STREET
💬 Discuss this project
1899Year Built
3Stories
R6Building Class
R6BZoning
4,833 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Condo, residential unit, 1-3 unit building (orig. class 1) · Owner of record: 283 PRESIDENT LLC · 2,025 sf lot · 2.39 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Roof44p · 4 filings · 20 docs
Floor 345p · 5 filings · 20 docs
Floor 245p · 5 filings · 20 docs
Floor 113p · 5 filings · 20 docs
Cellar47p · 5 filings · 20 docs
Sub-Basement42p · 5 filings · 20 docs
Site & exterior27p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
283 PRESIDENT LLC203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.1106/26/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
H Z BUILDING NY203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JRL SKYLINE INCGeneral Contractor803/21/2026
BUILDERS CONSTRUCTION NYCGeneral Contractor407/08/2026
QMB PLUMBING & HEATING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC56131106/26/2023
Building Lifecycle
All (86)Filed (11)Permit Issued (9)Signed Off (4)Violation (9)Inspection (9)Objection (14)Special Inspection (30)
06/10/2025
Violation issued (HPD, closed)
A
04/11/2024
Violation issued (HPD, closed)
A
03/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/28/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/22/2023
Violation issued (HPD, closed)
I
07/17/2023
Signed off — Alteration
Proposed interior renovation for an existing 4 units 3 story brown stone building with basement & cellar. proposed work at open space, cellar, basement, 1st thru 3rd floor and roof. As per plan, no change in use, egress or occupancy.
B00765303-I1
07/16/2023
Special inspection requirement — Air barrier - visual inspection
Fran Huang
07/16/2023
Special inspection requirement — Fenestration air leakage
Fran Huang
07/16/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
07/16/2023
Special inspection requirement — Insulation placement and R values
Fran Huang
07/16/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
07/16/2023
Special inspection requirement — Interior lighting power
Fran Huang
07/16/2023
Special inspection requirement — Fenestration areas
Fran Huang
07/16/2023
Special inspection requirement — Lighting in dwelling units
Fran Huang
07/16/2023
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
07/16/2023
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
07/16/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
07/16/2023
Special inspection requirement — Lighting controls
Fran Huang
07/16/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
07/10/2023
Signed off — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH GENERNAL CONSTRUCTION JOB # B00765303. PROPOSED WORK ON OSP.,CEL.,BAS.,1ST TO 3RD FLOOR, ROOF. AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00765835-I1
07/06/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/06/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/26/2023
Filed — Alteration
Proposed interior renovation for an existing 4 units 3 story brown stone building with basement & cellar. proposed work at open space, cellar, basement, 1st thru 3rd floor and roof. As per plan, no change in use, egress or occupancy.
B00765303-P3
06/26/2023
Inspection — Pass-Final Construction Permit Withdrawal
Pass
View inspection ↗
06/26/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
06/26/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Fran Huang
06/26/2023
Special inspection requirement — Fenestration air leakage
Fran Huang
06/26/2023
Special inspection requirement — Insulation placement and R values
Fran Huang
06/26/2023
Special inspection requirement — Fenestration areas
Fran Huang
06/26/2023
Special inspection requirement — Lighting controls
Fran Huang
06/26/2023
Special inspection requirement — Lighting in dwelling units
Fran Huang
06/26/2023
Special inspection requirement — Fire-Resistance Rated Construction
Fran Huang
06/26/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/26/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Fran Huang
06/26/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/26/2023
Special inspection requirement — Concrete - Cast-In-Place
Fran Huang
06/26/2023
Special inspection requirement — Air barrier - visual inspection
Fran Huang
06/26/2023
Special inspection requirement — Interior lighting power
Fran Huang
06/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Fran Huang
06/13/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
06/13/2023
Special inspection requirement — HVAC-R and service water heating equipment
Fran Huang
06/13/2023
Special inspection requirement — HVAC-R and service water heating system controls
Fran Huang
06/12/2023
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH GENERNAL CONSTRUCTION JOB # B00765303. PROPOSED WORK ON OSP.,CEL.,BAS.,1ST TO 3RD FLOOR, ROOF. AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00765835-P2
06/08/2023
Signed off — Alteration
B00765848-I1
06/07/2023
Filed — Alteration
Proposed interior renovation for an existing 4 units 3 story brown stone building with basement & cellar. proposed work at open space, cellar, basement, 1st thru 3rd floor and roof. As per plan, no change in use, egress or occupancy.
B00765303-P1
06/02/2023
Signed off — Alteration
PROPOSED MECHANICAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION DOB JOB # B00765303. WORK ON CEL.,BAS.,1ST TO 3RD FLOOR, ROOF AS PER PLAN.
B00765839-I1
06/01/2023
Filed — Alteration
PROPOSED MECHANICAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION DOB JOB # B00765303. WORK ON CEL.,BAS.,1ST TO 3RD FLOOR, ROOF AS PER PLAN.
B00765839-P2
05/30/2023
Filed — Alteration
PROPOSED MECHANICAL WORK IN CONJUNCTION WITH GENERAL CONSTRUCTION DOB JOB # B00765303. WORK ON CEL.,BAS.,1ST TO 3RD FLOOR, ROOF AS PER PLAN.
B00765839-P1
05/02/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/18/2023
Permit issued — General Construction
B00765303-I1-GC
04/18/2023
Permit issued — General Construction
B00792742-I1-GC
04/18/2023
Permit issued — Structural
B00765848-I1-ST
04/18/2023
Permit issued — Mechanical Systems
B00765839-I1-MS
03/24/2023
Violation issued (HPD, closed)
A
01/18/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2023
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH GENERNAL CONSTRUCTION JOB # B00765303. PROPOSED WORK ON OSP.,CEL.,BAS.,1ST TO 3RD FLOOR, ROOF. AS PER PLAN. NO CHANGE IN USE, EGRESS, AND OCCUPANCY.
B00765835-P1
11/14/2022
Violation issued (HPD, closed)
I
10/29/2022
Permit issued — Plumbing
B00765835-I1-PL
09/13/2022
Permit issued — Structural
B00765848-I1-ST
Latest 60 of 86 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offJRL SKYLINE04/18/2023
DOB NOWGeneral ConstructionPermit IssuedJRL SKYLINE04/18/2023
DOB NOWStructuralSigned-offJRL SKYLINE04/18/2023
DOB NOWMechanical SystemsSigned-offJRL SKYLINE04/18/2023
DOB NOWPlumbingSigned-offQMB PLUMBING & HEATING INC10/29/2022
DOB NOWStructuralSigned-offBUILDERS CONSTRUCTION NYC09/13/2022
DOB NOWGeneral ConstructionSigned-offBUILDERS CONSTRUCTION NYC08/19/2022
DOB NOWGeneral ConstructionPermit IssuedBUILDERS CONSTRUCTION NYC08/18/2022
DOB NOWMechanical SystemsSigned-offBUILDERS CONSTRUCTION NYC08/11/2022
2 projects · most recent 10/14/2022
General Wiring
FiledStatusContractorScope
10/14/2022CompleteJ Y ELECTRIC INCGeneral Wiring
10/14/2022CompleteJ Y ELECTRIC INC4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
03/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/28/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/26/2023Pass-Final Construction Permit WithdrawalPassView ↗
06/26/2023Pass-Final General Construction Non-Directive 14PassView ↗
06/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/02/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/18/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 81
DateRequirementInspectorRole
07/16/2023Interior lighting powerFran Huangenergy_progress
07/16/2023Fenestration and door U-factor and product ratingsFran Huangenergy_progress
07/16/2023Fenestration areasFran Huangenergy_progress
07/16/2023Fenestration air leakageFran Huangenergy_progress
07/16/2023Lighting controlsFran Huangenergy_progress
07/16/2023Insulation placement and R valuesFran Huangenergy_progress
07/16/2023Fire-Resistance Rated ConstructionFran Huangprogress
07/16/2023Lighting in dwelling unitsFran Huangenergy_progress
07/16/2023Energy Code Compliance InspectionsFran Huangprogress
07/16/2023Concrete - Cast-In-PlaceFran Huangspecial
07/16/2023Fire-Resistant Penetrations and JointsFran Huangspecial
07/16/2023Structural Stability – Alterations of existing buildingsFran Huangspecial
07/16/2023Air barrier - visual inspectionFran Huangenergy_progress
06/26/2023Concrete - Cast-In-PlaceFran Huangspecial
06/26/2023Fire-Resistant Penetrations and JointsFran Huangspecial
06/26/2023Structural Stability – Alterations of existing buildingsFran Huangspecial
06/26/2023Energy Code Compliance InspectionsFran Huangprogress
06/26/2023Fire-Resistance Rated ConstructionFran Huangprogress
06/26/2023Lighting in dwelling unitsFran Huangenergy_progress
06/26/2023Lighting controlsFran Huangenergy_progress
06/26/2023Fenestration areasFran Huangenergy_progress
06/26/2023Interior lighting powerFran Huangenergy_progress
06/26/2023Fenestration air leakageFran Huangenergy_progress
06/26/2023Insulation placement and R valuesFran Huangenergy_progress
06/26/2023Fenestration and door U-factor and product ratingsFran Huangenergy_progress
Latest 25 of 81.
▾Documents — 111 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/29/2026B00765303-P3Request digital key ↗
08/29/2026B00765303-P1Request digital key ↗
08/28/2026B00765835-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Applications & Permits3
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION2
07/19/2023322113280Open ↗
07/19/2023322113280Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/14/2023322113280Open ↗
▸Seals & Professional Certifications82
▸DOB NOWProgress Inspector Seal & Signature50
09/27/2026B00765839-P2Open ↗
09/11/2026B00765303-P1Open ↗
09/11/2026B00765303-P1Open ↗
Showing 3 of 50 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature21
09/27/2026B00765839-P2Open ↗
09/27/2026B00765839-P2Open ↗
09/27/2026B00765839-P2Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/29/2026B00765303-I1Open ↗
08/29/2026B00765303-P1Open ↗
08/29/2026B00765303-P3Open ↗
Showing 3 of 11 on file for this type
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/29/2026B00765303-P3Open ↗
08/29/2026B00765303-P1Open ↗
08/28/2026B00765835-I1Open ↗
Showing 3 of 11 on file for this type
▸Energy Compliance3
▸DOB NOWEN2: As Built Energy Analysis3
08/13/2026B00765835-I1Open ↗
08/13/2026B00765303-I1Open ↗
08/13/2026B00765839-I1Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
07/14/2023322113280Open ↗