← Back
BuildNYC
BRONX
2836 3RD AVENUE
BRONX · Mott Haven-Port Morris · BIN 2092096
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
7 Active Violations 3 unresolved · 4 paperwork only 7 old, status unconfirmed ▸
Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRetail store renovation and HVAC installation1 filing · 5 docs
Floor 21 filing
Floor 1Retail store renovation and HVAC installation1 filing · 5 docs
CellarRetail store renovation and HVAC installation1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Madaleo Reality210/10/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Dezhang Fang110/09/2026
JKM Architecture110/02/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JKM Architecture8906110/02/2026
Building Lifecycle
All (42)Filed (2)Violation (31)Special Inspection (9)
10/09/2026
Filed — Alteration
X01471347-I1
10/09/2026
Special inspection requirement — Fire-Resistance Rated Construction
10/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
10/02/2026
Filed — Alteration
RENOVATION OF EXISTING RETAIL STORE, INCLUDING REMOVAL OF EXISTING OPEN STAIR AND FLOOR OPENING TO BE BLOCKED; INSTALLATION OF HVAC UNITS. NO CHANGE IN USE, OCCUPANCY AND MEANS OF EGRESS IS INVOLVED UNDER THIS APPLICATION.
X01462636-I1
10/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
YOUNGSAM YU
10/02/2026
Special inspection requirement — HVAC-R and service water heating system controls
YOUNGSAM YU
10/02/2026
Special inspection requirement — HVAC-R and service water heating equipment
YOUNGSAM YU
10/02/2026
Special inspection requirement — Lighting controls
YOUNGSAM YU
09/19/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
John Min
09/19/2026
Special inspection requirement — Final
John Min
09/19/2026
Special inspection requirement — Mechanical Systems
John Min
07/20/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/30/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/20/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/25/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
11/08/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/09/2018
Violation issued (ECB, closed)
Construction
04/06/2018
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/14/2018
Violation issued (ECB, open)
Construction
02/02/2018
Violation issued (ECB, open)
Construction
11/09/2017
Violation issued (ECB, open)
Construction
11/09/2017
Violation issued (ECB, open)
Construction
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
05/13/2010
Violation issued (ECB, closed)
Signs
01/31/2005
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/13/2004
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/19/2003
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
03/26/2002
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/27/2001
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
02/07/2000
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
05/04/1998
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
08/29/1995
Violation issued (DOB, closed)
V-DOB VIOLATION - ACTIVE
07/14/1989
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDMonarch Mechanical06/22/2005
1 project · most recent 10/02/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/02/2026——Heating and Air Conditioning Systems
Heat / Cool
Trane 4TXCD061BC3HCBA 5 tons · Split System ×1
TTA150E300AA 125 tons · Split System ×1
TWE180E300AA 15 tons · Condensing Unit ×1
YCJD60S41S1C 5 tons · Condensing Unit ×1
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
10/09/2026Fire-Resistance Rated Construction—progress
10/07/2026Fire-Resistant Penetrations and Joints—special
10/02/2026HVAC-R and service water piping design and insulationYOUNGSAM YUenergy_progress
10/02/2026HVAC-R and service water heating system controlsYOUNGSAM YUenergy_progress
10/02/2026HVAC-R and service water heating equipmentYOUNGSAM YUenergy_progress
10/02/2026Lighting controlsYOUNGSAM YUenergy_progress
09/19/2026Fire-Resistant Penetrations and JointsJohn Minspecial
09/19/2026FinalJohn Minprogress
09/19/2026Mechanical SystemsJohn Minspecial
▾Documents — 5 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
10/04/2026X01462636-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature1
10/04/2026X01462636-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
10/04/2026X01462636-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
10/04/2026X01462636-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
10/04/2026X01462636-I1Open ↗