Two stories - detached, small or mid-size
2836 MARION AVENUE
BRONX · BIN 2016556
💬 Discuss this project
1910Year Built
2.5Stories
A1Building Class
R5BZoning
2,880 sfGross Floor Area
1Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Two stories - detached, small or mid-size · 2,148 sf lot · 1.34 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction17p · 1 filing · 20 docs
Floor 2Under Construction21p · 1 filing · 20 docs
Floor 1Under Construction21p · 1 filing · 20 docs
CellarUnder Construction21p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/27/2024$750K—Private party → Private party$260/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FRAME DESIGN CORPS708/14/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTURAL DESIGN SOLUTIONS503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ARC HI TECT ASSOCIATE INCGeneral Contractor107/08/2026
BT'S PLUMBING AND HEATINGPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARC-HI-TECH ASSOCIATES IN6963210/30/2025
Building Lifecycle
All (56)Filed (7)Permit Issued (2)Violation (4)Inspection (13)Special Inspection (30)
08/14/2026
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-P8
08/12/2026
Special inspection requirement — Energy Code Compliance Inspections
SURESH WARREN
08/12/2026
Special inspection requirement — HVAC-R and service water heating system controls
SURESH WARREN
08/12/2026
Special inspection requirement — HVAC-R and service water heating equipment
SURESH WARREN
08/12/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SURESH WARREN
08/12/2026
Special inspection requirement — Maintenance information
SURESH WARREN
07/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
SURESH WARREN
07/09/2026
Special inspection requirement — Energy Code Compliance Inspections
SURESH WARREN
07/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SURESH WARREN
07/09/2026
Special inspection requirement — Maintenance information
SURESH WARREN
07/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
SURESH WARREN
06/23/2026
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-P7
06/22/2026
Special inspection requirement — Maintenance information
SURESH WARREN
06/22/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SURESH WARREN
06/22/2026
Special inspection requirement — Energy Code Compliance Inspections
SURESH WARREN
06/22/2026
Special inspection requirement — HVAC-R and service water heating system controls
SURESH WARREN
06/22/2026
Special inspection requirement — HVAC-R and service water heating equipment
SURESH WARREN
04/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/02/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/21/2026
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-P6
01/20/2026
Special inspection requirement — Maintenance information
IGOR LISOVENKO
01/20/2026
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
01/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
IGOR LISOVENKO
01/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
IGOR LISOVENKO
01/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
IGOR LISOVENKO
12/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/15/2025
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-P2
11/17/2025
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
11/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/31/2025
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
10/30/2025
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-P3
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Fenestration air leakage
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Fenestration areas
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
IGOR LISOVENKO
10/30/2025
Special inspection requirement — Insulation placement and R values
IGOR LISOVENKO
10/29/2025
Special inspection requirement — HVAC-R and service water heating system controls
IGOR LISOVENKO
10/29/2025
Special inspection requirement — Maintenance information
IGOR LISOVENKO
10/29/2025
Special inspection requirement — HVAC-R and service water heating equipment
IGOR LISOVENKO
10/27/2025
Permit issued — Plumbing
X01178139-S1-PL
10/24/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/20/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/10/2025
Permit issued — General Construction
X01178139-I1-GC
09/22/2025
Inspection — No Access-Final PL - Up to 9 Requested Floors
No Access
View inspection ↗
03/24/2025
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-S1
02/20/2025
Filed — Alteration CO
Plumbing work in conjunction with GC job filing install 2nd floor new kitchen,3rd floor laundry area (1 washing m/c & dryer), convert oil to gas boiler also 3 pcs bathroom at cellar as per plan obtain new c of o.
X01178139-I1
10/09/2024
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
06/24/2024
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
07/09/2001
Violation issued (ECB, open)
HPD
03/22/2001
Violation issued (HPD, closed)
B
03/22/2001
Violation issued (HPD, closed)
B
10/31/1997
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedBT'S PLUMBING AND HEATING10/27/2025
DOB NOWGeneral ConstructionPermit IssuedARC HI TECT ASSOCIATE INC10/10/2025
1 project · most recent 08/14/2026
Gas
FiledStatusContractorScope
08/14/2026Permit IssuedBT'S PLUMBING AND HEATINGGas
1 project · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025Permit IssuedEXPERT ELECTRIC.CONT NY IGeneral Wiring
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
07/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
03/02/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/17/2025Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/31/2025Pass-Final PL - UndergroundPassView ↗
10/24/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/20/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/22/2025No Access-Final PL - Up to 9 Requested FloorsNo AccessView ↗
10/09/2024Pass-Final PL - UndergroundPassView ↗
06/24/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
08/12/2026Energy Code Compliance InspectionsSURESH WARRENprogress
08/12/2026HVAC-R and service water heating system controlsSURESH WARRENenergy_progress
08/12/2026HVAC-R and service water heating equipmentSURESH WARRENenergy_progress
08/12/2026HVAC-R and service water piping design and insulationSURESH WARRENenergy_progress
08/12/2026Maintenance informationSURESH WARRENenergy_progress
07/09/2026HVAC-R and service water heating equipmentSURESH WARRENenergy_progress
07/09/2026Energy Code Compliance InspectionsSURESH WARRENprogress
07/09/2026HVAC-R and service water piping design and insulationSURESH WARRENenergy_progress
07/09/2026Maintenance informationSURESH WARRENenergy_progress
07/09/2026HVAC-R and service water heating system controlsSURESH WARRENenergy_progress
06/22/2026Maintenance informationSURESH WARRENenergy_progress
06/22/2026HVAC-R and service water piping design and insulationSURESH WARRENenergy_progress
06/22/2026Energy Code Compliance InspectionsSURESH WARRENprogress
06/22/2026HVAC-R and service water heating system controlsSURESH WARRENenergy_progress
06/22/2026HVAC-R and service water heating equipmentSURESH WARRENenergy_progress
01/20/2026Maintenance informationIGOR LISOVENKOenergy_progress
01/20/2026Energy Code Compliance InspectionsIGOR LISOVENKOprogress
01/20/2026HVAC-R and service water piping design and insulationIGOR LISOVENKOenergy_progress
01/20/2026HVAC-R and service water heating system controlsIGOR LISOVENKOenergy_progress
01/20/2026HVAC-R and service water heating equipmentIGOR LISOVENKOenergy_progress
10/30/2025Fire-Resistant Penetrations and JointsIGOR LISOVENKOspecial
10/30/2025Structural Stability – Alterations of existing buildingsIGOR LISOVENKOspecial
10/30/2025Energy Code Compliance InspectionsIGOR LISOVENKOprogress
10/30/2025Fenestration air leakageIGOR LISOVENKOenergy_progress
10/30/2025Fenestration areasIGOR LISOVENKOenergy_progress
Latest 25 of 32.
▾Documents — 60 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/17/2026X01178139-P3Request digital key ↗
08/17/2026X01178139-S1Request digital key ↗
08/17/2026X01178139-P8Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/13/2026X01178139-P3Open ↗
08/13/2026X01178139-I1Open ↗
▸Seals & Professional Certifications39
▸DOB NOWProgress Inspector Seal & Signature30
09/02/2026X01178139-P8Open ↗
09/02/2026X01178139-P8Open ↗
09/02/2026X01178139-P8Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/17/2026X01178139-P8Open ↗
08/17/2026X01178139-P3Open ↗
08/17/2026X01178139-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026X01178139-P3Open ↗
08/23/2026X01178139-P3Open ↗
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/17/2026X01178139-P3Open ↗
08/17/2026X01178139-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026X01178139-P8Open ↗
08/17/2026X01178139-P7Open ↗
08/17/2026X01178139-P6Open ↗
Showing 3 of 7 on file for this type
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/17/2026X01178139-I1Open ↗
08/17/2026X01178139-P3Open ↗
▸DOB NOWFinal Survey1
08/13/2026X01178139-I1Open ↗