One story retail building
2837 CONEY ISLAND AVENUE
BROOKLYN · BIN 3204773
💬 Discuss this project
1926Year Built
1Stories
K1Building Class
R4Zoning
10,000 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story retail building · Owner of record: 2845 CONEY ISLAND LLC · 20,425 sf lot · 0.49 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof3p · 2 filings · 17 docs
Floor 1Under Construction7p · 3 filings · 20 docs
CellarUnder Construction5p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2845 CONEY ISLAND LLC103/22/2026
2845 CONEY ISLAND AV LLC103/22/2026
99C THE LIMITING203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/31/2024$16.0M—MED PARTNERS LLC → 2845 CONEY ISLAND LLC$1,600/sf building
08/07/2017$12.2M—CB-INFINITY CONEY LLC → MED PARTNERS LLC$1,220/sf building
07/10/2014$9.6M—— → —$960/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SAVOY YORK CONSULTING INC.104/22/2025
INSIGHT STUDIO ARCHITECTURE PC102/26/2025
NAZZARENO CALLIPO P.E.604/20/2023
PRUDIGM ENGINEERING LLC202/17/2023
ASHRAF CORP106/15/2022
JOSE L. PENA,P.E.504/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LOUIS STRIAR1003/21/2026
GZ NC CODE PLANNING ENGINEERING803/21/2026
AN TONG FAN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DE VEGA CONTRACTING LTDGeneral Contractor607/08/2026
CITY SIGNSScaffold407/08/2026
IDEAL KITCHEN & VENTILATIGeneral Contractor303/21/2026
CHANDRABALI RAMANANDGeneral Contractor304/09/2026
GREGG NY PLUMBING, INCPlumbing207/08/2026
A + SPRINKLER CORPFire Protection107/08/2026
RECORD GROUP INCGeneral Contractor109/07/2026
KATAN P & H INCPlumbing107/08/2026
CITY SIGNS INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA BUILDING & INSPECTION1519204/22/2025
GZ & NC CODE CONSULTING P7492704/20/2023
POLY ENGINEER, P.C.6110106/15/2022
Building Lifecycle
All (100)Filed (16)Permit Issued (18)Signed Off (9)Violation (6)Inspection (9)Objection (12)Special Inspection (30)
09/03/2026
Permit issued — Mechanical Systems
B01199193-I1-GC-CX
03/25/2026
Permit issued — General Construction
B01171484-I1-GC
07/29/2025
Violation issued (FDNY_NOV, closed)
07/29/2025
Violation issued (FDNY_NOV, closed)
06/11/2025
Violation issued (ECB, closed)
Construction
04/24/2025
Permit issued — General Construction
B01199193-I1-GC-CX
04/22/2025
Filed — Alteration
Install temporary accessory walk-in refrigerator boxes in existing open space. No change in egress, use or occupancy.
B01199193-I1
04/14/2025
Permit issued — General Construction
B01171484-I1-GC
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/25/2025
Objection resolved — Addressed
03/21/2025
Objection raised — Zoning
03/21/2025
Special inspection requirement — Mechanical Systems
Younes Abouyaala
03/21/2025
Special inspection requirement — Final
NAVEEN KUMAR
03/17/2025
Objection resolved — Addressed
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Scope
03/06/2025
Objection raised — Other
02/26/2025
Filed — Alteration
Create a new shaft for a new material lift in existing commercial space, from first floor to cellar accessory storage area. No change in egress, use or occupancy
B01171484-I1
11/08/2024
Violation issued (FDNY_NOV, closed)
12/20/2023
Signed off — Alteration
plumbing and sprinkler work in conjunction with the interior renovation of existing supermarket filed under dob job# B00682286. no change in use, egress, nor occupancy.
B00714749-I1
12/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/24/2023
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
07/24/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
07/20/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/19/2023
Permit issued — Sprinklers
B00714749-I1-EW-SP
05/23/2023
Signed off — Alteration
Renovate existing supermarket. Work to include new finishes on the first fl, cellar and facade; replace stair from the cellar to the first fl, and new lift. New plumbing; sprinkler; cooking hoods and mechanical equipment to be filed separately.
B00682286-I1
04/20/2023
Filed — Alteration
Renovate existing supermarket. Work to include new finishes on the first fl, cellar and facade; replace stair from the cellar to the first fl, and new lift. New plumbing; sprinkler; cooking hoods and mechanical equipment to be filed separately.
B00682286-P1
04/20/2023
Special inspection requirement — Interior lighting power
Nazzareno Callipo
04/20/2023
Special inspection requirement — Fenestration air leakage
Nazzareno Callipo
04/20/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nazzareno Callipo
04/20/2023
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
04/20/2023
Special inspection requirement — Air barrier - visual inspection
Nazzareno Callipo
04/20/2023
Special inspection requirement — Final
Nazzareno Callipo
04/20/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
04/20/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
04/20/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
04/20/2023
Special inspection requirement — Lighting controls
Nazzareno Callipo
04/18/2023
Special inspection requirement — Fenestration air leakage
Nazzareno Callipo
04/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nazzareno Callipo
04/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Nazzareno Callipo
04/18/2023
Special inspection requirement — Final
Nazzareno Callipo
04/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nazzareno Callipo
04/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Nazzareno Callipo
04/18/2023
Special inspection requirement — Insulation placement and R values
Nazzareno Callipo
04/18/2023
Special inspection requirement — Air barrier - visual inspection
Nazzareno Callipo
04/18/2023
Special inspection requirement — Interior lighting power
Nazzareno Callipo
04/18/2023
Special inspection requirement — Lighting controls
Nazzareno Callipo
02/21/2023
Signed off — Alteration
filing for rooftop HVAC & refrigeration equipment. obtain equipment use permits. no change in use, egress, nor occupancy.
B00813339-I1
02/19/2023
Special inspection requirement — Final
Nazzareno Callipo
02/19/2023
Special inspection requirement — Maintenance information
Nazzareno Callipo
02/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nazzareno Callipo
02/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nazzareno Callipo
02/19/2023
Special inspection requirement — Mechanical Systems
Nazzareno Callipo
02/17/2023
Filed — Alteration
filing for rooftop HVAC & refrigeration equipment. obtain equipment use permits. no change in use, egress, nor occupancy.
B00813339-P1
02/03/2023
Permit issued — Mechanical Systems
B00813339-I1-MS
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedRECORD GROUP INC09/03/2026
DOB NOWGeneral ConstructionPermit IssuedCHANDRABALI RAMANAND03/25/2026
DOB NOWGeneral ConstructionPermit IssuedCHANDRABALI RAMANAND04/24/2025
DOB NOWGeneral ConstructionPermit IssuedCHANDRABALI RAMANAND04/14/2025
DOB NOWSprinklersSigned-offA + SPRINKLER CORP07/19/2023
DOB NOWMechanical SystemsSigned-offDEVEGA CONTRACTING LTD02/03/2023
DOB NOWPlumbingSigned-offGREGG NY PLUMBING, INC08/26/2022
DOB NOWPlumbingSigned-offKATAN P & H INC07/19/2022
DOB NOWMechanical SystemsPermit IssuedIDEAL KITCHEN & VENTILATI06/17/2022
DOB NOWSignSigned-offELMER DAWSON04/27/2022
DOB NOWSignSigned-offELMER DAWSON04/27/2022
DOB NOWGeneral ConstructionSigned-offCITY SIGNS INC04/27/2022
DOB NOWSignSigned-offELMER DAWSON04/27/2022
DOB NOWSignSigned-offELMER DAWSON04/27/2022
DOB NOWSprinklersSigned-offGREGG NY PLUMBING, INC04/14/2022
DOB NOWConstruction FenceSigned-offDEVEGA CONTRACTING LTD03/23/2022
DOB NOWGeneral ConstructionSigned-offDEVEGA CONTRACTING LTD02/28/2022
DOB NOWGeneral ConstructionSigned-offDEVEGA CONTRACTING LTD02/28/2022
BISOTISSUEDG A WALKER INC DRAFTING & EXPED11/15/2001
BISOTISSUEDG A WALKER INC DRAFTING & EXPED02/01/2001
BISMHISSUEDCONEY Z TRADING CORP03/24/1993
2 projects · most recent 04/22/2025
Refrigeration Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/22/2025Permit IssuedRECORD GROUP INCRefrigeration Systems
Refrigeration
N/A NA 36,000 BTU · Refrigeration Unit ×1
06/15/2022Permit IssuedIDEAL KITCHEN & VENTILATIVentilation Systems
Ventilation
Captiveaire DU180HFA 12,100 CFM · Exhaust Fan ×3
A4-D.1000-30D-MPU 13,963 BTU · Makeup Air ×1
DU50HFA 1,800 CFM · Exhaust Fan ×1
DU85HFA 1,800 CFM · Exhaust Fan ×1
3 projects · most recent 04/29/2025
General Wiring
FiledStatusContractorScope
04/29/2025Permit IssuedW 8 ELECTRIC CORP—
03/07/2022Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
02/15/2022CompleteKINGS ELECTRIC CO., INC.—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/24/2023Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/24/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/20/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/29/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
03/21/2025Mechanical SystemsYounes Abouyaalaspecial
03/21/2025FinalNAVEEN KUMARprogress
04/20/2023Interior lighting powerNazzareno Callipoenergy_progress
04/20/2023Fenestration air leakageNazzareno Callipoenergy_progress
04/20/2023Fenestration and door U-factor and product ratingsNazzareno Callipoenergy_progress
04/20/2023Insulation placement and R valuesNazzareno Callipoenergy_progress
04/20/2023Air barrier - visual inspectionNazzareno Callipoenergy_progress
04/20/2023FinalNazzareno Callipoprogress
04/20/2023Fire-Resistance Rated ConstructionNazzareno Callipoprogress
04/20/2023Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
04/20/2023Fire-Resistant Penetrations and JointsNazzareno Callipospecial
04/20/2023Lighting controlsNazzareno Callipoenergy_progress
04/18/2023Fenestration air leakageNazzareno Callipoenergy_progress
04/18/2023Fire-Resistant Penetrations and JointsNazzareno Callipospecial
04/18/2023Structural Stability – Alterations of existing buildingsNazzareno Callipospecial
04/18/2023FinalNazzareno Callipoprogress
04/18/2023Fire-Resistance Rated ConstructionNazzareno Callipoprogress
04/18/2023Fenestration and door U-factor and product ratingsNazzareno Callipoenergy_progress
04/18/2023Insulation placement and R valuesNazzareno Callipoenergy_progress
04/18/2023Air barrier - visual inspectionNazzareno Callipoenergy_progress
04/18/2023Interior lighting powerNazzareno Callipoenergy_progress
04/18/2023Lighting controlsNazzareno Callipoenergy_progress
02/19/2023FinalNazzareno Callipoprogress
02/19/2023Maintenance informationNazzareno Callipoenergy_progress
02/19/2023HVAC-R and service water heating system controlsNazzareno Callipoenergy_progress
Latest 25 of 47.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Freddys Gourmet. Market LLCRetailCellar, Floor 1
Project B00714749 Alteration · LOC Issued · 04/12/2022
Freddy's MarketRetail—
Project B00696772 Alteration · LOC Issued · 03/21/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings16
▸DOB NOWPlans/Sketch16
08/31/2026B00682286-I1Request digital key ↗
08/31/2026B00682286-P1Request digital key ↗
08/30/2026B00696772-I1Request digital key ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications63
▸DOB NOWProgress Inspector Seal & Signature35
09/30/2026B00813339-I1Open ↗
09/30/2026B00813339-I1Open ↗
09/30/2026B00813339-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature16
08/31/2026B00682286-I1Open ↗
08/31/2026B00682286-P1Open ↗
08/30/2026B00696772-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/30/2026B00813339-I1Open ↗
09/02/2026B00682286-P1Open ↗
09/02/2026B00682286-P1Open ↗
Showing 3 of 12 on file for this type
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/31/2026B00682286-P1Open ↗
08/31/2026B00682286-I1Open ↗
08/30/2026B00714749-P4Open ↗
Showing 3 of 15 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis2
08/31/2026B00682286-I1Open ↗
08/30/2026B00714749-I1Open ↗