← Back
BuildNYC
Elevator apt, fireproof without stores
2837 WEST 19TH STREET
BROOKLYN · BIN 3321669
💬 Discuss this project
2021Year Built
6Stories
D3Building Class
R6Zoning
11,181 sfGross Floor Area
9Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Elevator apt, fireproof without stores · Owner of record: Choi Xing · 4,730 sf lot · 2.36 FAR built · Flood zone AE
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofNew building plumbing work34p · 3 filings · 20 docs
BulkheadChoi Xing LLC.8p · 4 filings · 20 docs
Floor 6Choi Xing LLC.44p · 4 filings · 20 docs
Floor 5Choi Xing LLC.40p · 4 filings · 20 docs
Floor 4Choi Xing LLC.38p · 4 filings · 20 docs
Floor 3Choi Xing LLC.38p · 4 filings · 20 docs
Floor 2Choi Xing LLC.47p · 4 filings · 20 docs
Floor 1Choi Xing LLC.38p · 5 filings · 20 docs
CellarNew building plumbing work16p · 1 filing · 20 docs
Site & exteriorChoi Xing LLC9p · 3 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Choi Xing4307/08/2026
NYC Department of Housing Preservation and Development403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/16/2019$353K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
A Plus Design806/26/2024
Revap Consulting Engineers304/13/2023
Jimenez Building Consulting309/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JRL Skyline603/21/2026
A Plus Design1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Winway DevelopmentScaffold1407/08/2026
Acer ConstructionGeneral Contractor607/08/2026
Case PlumbingFire Protection407/08/2026
Captain Renovation & ConElectrical303/21/2026
Catman PlumbingPlumbing307/08/2026
Peng LiuElectrical303/21/2026
Kwong Ming ElectricElectrical203/21/2026
Kwong Ming ElectricGeneral Contractor203/22/2026
Tan DevelopmentScaffold207/08/2026
I.P. ElectricElectrical103/22/2026
I P ElectricGeneral Contractor103/22/2026
I.P. ElectricElectrical103/21/2026
S S PlumbingPlumbing103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SD Testing & Inspection S70101006/26/2024
Building Lifecycle
All (158)Filed (14)Permit Issued (18)Signed Off (9)Violation (60)Inspection (11)Objection (16)Special Inspection (30)
10/22/2024
Signed off — Alteration
BOILER WORK IN CONJUNCTION WITH DOB JOB 321994945.
B00435513-I1
10/22/2024
Signed off — Alteration
BOILER WORK IN CONJUNCTION WITH DOB JOB 321994945.
B00435513-S1
10/17/2024
Signed off — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION#321994945.
B00431204-I1
10/17/2024
Signed off — Alteration
SPRINKLER SYSTEM INSTALLATION FOR NEW BUILDING JOB#321994945
B00435957-I1
10/16/2024
Signed off — Alteration
B00435964-I1
10/15/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/09/2024
Signed off — Alteration
B00430050-I1
10/03/2024
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
09/20/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
07/11/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
07/11/2024
Special inspection requirement — Final
XIUCHENG LI
07/11/2024
Special inspection requirement — Electrical motors
XIUCHENG LI
07/11/2024
Special inspection requirement — Electrical energy consumption
XIUCHENG LI
07/11/2024
Special inspection requirement — Shutoff dampers
XIUCHENG LI
07/11/2024
Special inspection requirement — HVAC insulation and sealing
XIUCHENG LI
07/11/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
07/11/2024
Special inspection requirement — HVAC and service water heating system controls
XIUCHENG LI
07/11/2024
Special inspection requirement — HVAC and service water heating equipment
XIUCHENG LI
07/09/2024
Objection resolved — Addressed
07/02/2024
Objection raised — Scope
06/28/2024
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
06/26/2024
Filed — Alteration
MECHANICAL WORK IN CONJUNCTION WITH NEW BUILDING APPLICATION#321994945.
B00431204-P1
06/21/2024
Permit issued — Boiler Equipment
B00435513-S1-BE
06/14/2024
Filed — Alteration
BOILER WORK IN CONJUNCTION WITH DOB JOB 321994945.
B00435513-S1
06/14/2024
Signed off — Alteration
B00668130-I1
06/14/2024
Signed off — Alteration
PROPOSED INSTALLATION OF SUPPORT OF SCAFFOLD AS PER PLANS. IN CONJUNCTION WITH DOB APPLICATION #: 321994945. NO CHANGE IN USE, OCCUPANCY, BULK, OR EGRESS.
B08010436-I1
06/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
XIUCHENG LI
06/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
XIUCHENG LI
06/14/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
06/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
XIUCHENG LI
06/14/2024
Special inspection requirement — Heating Systems
XIUCHENG LI
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/13/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIUCHENG LI
06/13/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
XIUCHENG LI
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
XIUCHENG LI
06/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
XIUCHENG LI
06/13/2024
Special inspection requirement — HVAC and service water heating system controls
XIUCHENG LI
06/13/2024
Special inspection requirement — HVAC and service water heating equipment
XIUCHENG LI
06/12/2024
Special inspection requirement — HVAC insulation and sealing
XIUCHENG LI
06/12/2024
Special inspection requirement — Maintenance information
XIUCHENG LI
06/12/2024
Special inspection requirement — Shutoff dampers
XIUCHENG LI
06/12/2024
Special inspection requirement — Electrical energy consumption
XIUCHENG LI
06/12/2024
Special inspection requirement — Mechanical Systems
XIUCHENG LI
06/12/2024
Special inspection requirement — Final
XIUCHENG LI
06/12/2024
Special inspection requirement — HVAC and service water heating equipment
XIUCHENG LI
06/12/2024
Special inspection requirement — HVAC and service water heating system controls
XIUCHENG LI
06/10/2024
Permit issued — Curb Cut
B00435964-I1-CC
06/10/2024
Permit issued — Structural
B00430050-I1-ST
06/10/2024
Permit issued — Mechanical Systems
B00431204-I1-MS
06/05/2024
Signed off — Alteration
B00491506-I1
06/04/2024
Filed — Alteration
BOILER WORK IN CONJUNCTION WITH DOB JOB 321994945.
B00435513-P3
03/29/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/30/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
01/30/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/04/2024
Permit issued — Sprinklers
B00435957-I1-EW-SP
09/29/2023
Permit issued — Construction Fence
B00491506-I1-FN
09/29/2023
Permit issued — Supported Scaffold
B08010436-I1-SF
09/08/2023
Objection resolved — Addressed
09/05/2023
Objection raised — Admin
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offCatman Plumbing06/21/2024
DOB NOWCurb CutSigned-offAcer Construction06/10/2024
DOB NOWStructuralSigned-offAcer Construction06/10/2024
DOB NOWMechanical SystemsSigned-offAcer Construction06/10/2024
DOB NOWSprinklersSigned-offS & L Plumbing01/04/2024
DOB NOWConstruction FenceSigned-offWinway Development09/29/2023
DOB NOWSupported ScaffoldSigned-offWinway Development09/29/2023
DOB NOWPlumbingSigned-offCatman Plumbing06/05/2023
DOB NOWSidewalk ShedSigned-offWinway Development02/02/2023
DOB NOWSprinklersSigned-offS & L Plumbing01/04/2023
DOB NOWConstruction FenceSigned-offWinway Development09/27/2022
DOB NOWSupported ScaffoldSigned-offWinway Development09/27/2022
DOB NOWSprinklersSigned-offS & L Plumbing07/27/2022
DOB NOWPlumbingSigned-offCatman Plumbing06/02/2022
DOB NOWSprinklersSigned-offS & L Plumbing06/02/2022
DOB NOWSidewalk ShedSigned-offWinway Development01/25/2022
DOB NOWConstruction FenceSigned-offTan Development09/24/2021
DOB NOWConstruction FenceSigned-offTan Development04/02/2021
BIS—ISSUEDAcer Construction11/01/2024
BIS—ISSUEDAcer Construction12/28/2023
BIS—ISSUEDAcer Construction10/11/2023
BIS—ISSUEDAcer Construction01/12/2023
BIS—ISSUEDAcer Construction11/04/2022
BIS—ISSUEDGolden Tiger Construction08/01/2022
BIS—ISSUEDGolden Tiger Construction07/12/2022
BIS—ISSUEDGolden Tiger Construction11/30/2021
BIS—ISSUEDGolden Tiger Construction11/30/2021
BIS—ISSUEDTan Development08/24/2021
BIS—ISSUEDTan Development04/15/2021
BIS—ISSUEDTan Development04/15/2021
BIS—ISSUEDGateway Demo/Civil08/08/2014
BISEQISSUEDGateway Demo/Civil08/08/2014
BISEQISSUEDGateway Demo/Civil08/08/2014
4 projects · most recent 04/19/2025
General Wiring
FiledStatusContractorScope
04/19/2025CompleteI.P. ElectricGeneral Wiring
08/16/2024CompleteI.P. ElectricGeneral Wiring
02/18/2022CompleteKwong Ming Electric—
12/21/2021CompleteA.C. Morgan Electric—
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
10/15/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
10/03/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
09/20/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
06/28/2024Pass-Final Boiler Equipment InspectionPassView ↗
03/29/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/30/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
01/30/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/26/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/13/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
07/11/2024Mechanical SystemsXIUCHENG LIspecial
07/11/2024FinalXIUCHENG LIprogress
07/11/2024Electrical motorsXIUCHENG LIenergy_progress
07/11/2024Electrical energy consumptionXIUCHENG LIenergy_progress
07/11/2024Shutoff dampersXIUCHENG LIenergy_progress
07/11/2024HVAC insulation and sealing XIUCHENG LIenergy_progress
07/11/2024Maintenance informationXIUCHENG LIenergy_progress
07/11/2024HVAC and service water heating system controls XIUCHENG LIenergy_progress
07/11/2024HVAC and service water heating equipment XIUCHENG LIenergy_progress
06/14/2024HVAC-R and service water piping design and insulationXIUCHENG LIenergy_progress
06/14/2024HVAC-R and service water heating system controlsXIUCHENG LIenergy_progress
06/14/2024Maintenance informationXIUCHENG LIenergy_progress
06/14/2024HVAC-R and service water heating equipmentXIUCHENG LIenergy_progress
06/14/2024Heating SystemsXIUCHENG LIspecial
06/14/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/13/2024Maintenance informationXIUCHENG LIenergy_progress
06/13/2024Fire-Resistant Penetrations and JointsXIUCHENG LIspecial
06/13/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationXIUCHENG LIspecial
06/13/2024Energy Code Compliance InspectionsXIUCHENG LIprogress
06/13/2024Fire-Resistance Rated ConstructionXIUCHENG LIprogress
06/13/2024HVAC and service water heating system controls XIUCHENG LIenergy_progress
06/13/2024HVAC and service water heating equipment XIUCHENG LIenergy_progress
06/12/2024HVAC insulation and sealing XIUCHENG LIenergy_progress
06/12/2024Maintenance informationXIUCHENG LIenergy_progress
06/12/2024Shutoff dampersXIUCHENG LIenergy_progress
Latest 25 of 49.
▾Documents — 185 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch5
09/02/2026B00435513-S1Request digital key ↗
09/01/2026B00491506-I1Request digital key ↗
08/31/2026B00668130-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
09/02/2026B00435513-I1Request digital key ↗
09/02/2026B00435513-P3Request digital key ↗
08/15/2026B00435513-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems2
08/15/2026B00431204-I1Request digital key ↗
08/15/2026B00431204-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
09/02/2026B00435957-P1Request digital key ↗
08/14/2026B00435957-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/27/2026B00435964-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
09/02/2026B00430050-I1Request digital key ↗
▸Applications & Permits29
▸BISWORK PERMIT APPLICATION16
11/06/2024321994945Open ↗
10/16/2024321994945Open ↗
11/30/2022321994945Open ↗
Showing 3 of 16 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION11
04/07/2025321994945Open ↗
12/17/2021321994945Open ↗
07/19/2021321994945Open ↗
Showing 3 of 11 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
05/28/2024340909743Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
07/17/2024321994945Open ↗
▸Zoning, Tax Lot & Property Records8
▸BISZONING DIAGRAM3
01/26/2021321994945Open ↗
12/17/2020321994945Open ↗
11/18/2019321994945Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
01/08/2021321994945Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
01/08/2021321994945Open ↗
▸BISVERIFY TAX LOT1
11/19/2024321994945Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/11/2024321994945Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
01/08/2021321994945Open ↗
▸Seals & Professional Certifications44
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/02/2026B00430050-I1Open ↗
09/02/2026B00435513-S1Open ↗
09/02/2026B00435513-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature14
10/08/2026B00431204-P1Open ↗
10/08/2026B00431204-P1Open ↗
08/31/2026B00435513-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/08/2026B00431204-P1Open ↗
08/31/2026B00435957-P1Open ↗
08/31/2026B00435957-P1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
04/16/2021321994945Open ↗
11/01/2019321994945Open ↗
10/29/2014321005050Open ↗
Showing 3 of 4 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
05/28/2024340909743Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/01/2019321994945Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
03/24/2025321994945Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
03/24/2025321994945Open ↗
▸BISPLUMBING (PL) SIGNOFF1
10/25/2024321994945Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
06/16/2025321994945Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
01/08/2021321994945Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
05/16/2024340909743Open ↗
01/26/2021321994945Open ↗
01/08/2021321994945Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/28/2024340909743Open ↗
▸BISSTREET TREE SIGNOFF1
09/11/2024321994945Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
08/12/2014321005050Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
10/29/2024321994945Open ↗
06/30/2021321994945Open ↗
01/08/2021321994945Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/16/2021321994945Open ↗
11/01/2019321994945Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/22/2024321994945Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00435513-S1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00435513-I1Open ↗
▸Inspections & Test Reports12
▸BISTECHNICAL REPORT: RESPONSIBILITY5
06/13/2025321994945Open ↗
10/22/2024321994945Open ↗
06/30/2021321994945Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER2
06/13/2025321994945Open ↗
04/16/2021321994945Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
06/30/2021321994945Open ↗
▸BISSOIL REPORT1
12/03/2020321994945Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
12/03/2020321994945Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
04/16/2021321994945Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
06/30/2021321994945Open ↗
▸Approvals, Objections & Sign-offs24
▸BISLETTERS - SUPPORTING DOCUMENTATION7
05/28/2024340909743Open ↗
05/28/2024340909743Open ↗
12/10/2020321994945Open ↗
Showing 3 of 7 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE5
01/13/2021321994945Open ↗
01/11/2021321994945Open ↗
12/17/2020321994945Open ↗
Showing 3 of 5 on file for this type
▸BISSUPERSEDING LETTER5
12/03/2021321994945Open ↗
12/03/2021321994945Open ↗
12/03/2021321994945Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS1
07/16/2014321005050Open ↗
▸BISCONSTRUCTION (OT) SIGNOFF1
11/08/2024321994945Open ↗
▸BISMECHANICAL (MH) SIGNOFF1
10/22/2024321994945Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM (SIGNOFF)1
10/25/2024321994945Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/28/2024340909743Open ↗
▸BISCURB CUT (CC) SIGNOFF1
10/22/2024321994945Open ↗
▸BISFINAL CONSTRUCTION SIGNOFF1
06/16/2025321994945Open ↗
▸Cost, Insurance & Ownership11
▸BISPROJECT-SPECIFIC GL INSURANCE6
11/06/2024321994945Open ↗
11/30/2022321994945Open ↗
12/03/2021321994945Open ↗
Showing 3 of 6 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)5
11/06/2024321994945Open ↗
12/03/2021321994945Open ↗
11/18/2021321994945Open ↗
Showing 3 of 5 on file for this type
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION6
04/14/2025321994945Open ↗
08/08/2023321994945Open ↗
08/18/2021321994945Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET4
11/02/2020321994945Open ↗
11/01/2019321994945Open ↗
07/16/2014321005050Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM4
11/30/2022321994945Open ↗
12/03/2021321994945Open ↗
11/18/2021321994945Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
05/28/2024340909743Open ↗
▸Other Documents8
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION3
10/16/2024321994945Open ↗
10/03/2014321005050Open ↗
10/03/2014321005050Open ↗
▸BISMS IN-CONJUNCTION FILING REQUIRED FOR ECC REVIEW1
01/11/2021321994945Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
05/28/2024340909743Open ↗
▸BISPLOT DIAGRAM1
01/20/2021321994945Open ↗
▸BISFEMA ELEVATION CERT (086-0-33)/ FLOODPROOFING CERT (086-0-34)1
04/03/2025321994945Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
01/26/2021321994945Open ↗