← Back
BuildNYC
Over six families without stores
2838 WEBB AVENUE
BRONX · BIN 2130752
💬 Discuss this project
2022Year Built
4Stories
C1Building Class
R6Zoning
7,540 sfGross Floor Area
8Units
0 Active ViolationsFDNY Report ↗
Over six families without stores · Owner of record: Webb Ave. 1 · 2,600 sf lot · 2.9 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentLandscapeCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofFire sprinkler and plumbing system71p · 3 filings · 20 docs
BulkheadFire sprinkler and plumbing system3p · 2 filings · 20 docs
Floor 4Fire sprinkler and plumbing system66p · 2 filings · 20 docs
Floor 3Fire sprinkler and plumbing system64p · 2 filings · 20 docs
Floor 2Fire sprinkler and plumbing system64p · 2 filings · 20 docs
Floor 1Fire sprinkler and plumbing system68p · 3 filings · 20 docs
CellarFire sprinkler and plumbing system67p · 2 filings · 20 docs
Site & exteriorPipe strut and scaffold installation31p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Webb Ave. 13707/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/14/2017$325K—— → —— not available
09/15/2016$319K—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Asr Engineering401/02/2026
Synergic Design Architects105/14/2024
Badaly Architects601/08/2024
Indrajeet Vagha PE105/30/2023
Badaly Engineering110/21/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Badaly Architects103/21/2026
Expediting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Topline NYC ContractingScaffold603/21/2026
M Build BuildersGeneral Contractor504/09/2026
Harry's DesignGeneral Contractor307/08/2026
Dynamic Plumbing & SprinklerFire Protection207/08/2026
Harry's DesignScaffold207/08/2026
Accord PowerGeneral Contractor107/08/2026
Dynamic Plumbing & SprinklerPlumbing107/08/2026
Power Surge ElectricElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Regional Testing394901/02/2026
Synergic Design8561105/14/2024
Building Lifecycle
All (96)Filed (13)Permit Issued (14)Signed Off (7)Violation (11)Inspection (10)Objection (8)Special Inspection (30)Tax Incentive (3)
05/28/2029
421-a(16) construction completed
08/04/2026
Signed off — New Building
SOE filed in conjunction with NB application
X00496625-I1
05/20/2026
Signed off — Alteration
Provide new fire sprinkler system and plumbing system in conjunction with NB application #X00496625
X00615794-I1
05/06/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/30/2026
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
01/02/2026
Filed — Alteration
Provide new fire sprinkler system and plumbing system in conjunction with NB application #X00496625
X00615794-P1
12/28/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
12/28/2025
Special inspection requirement — Seismic Isolation Systems
Paul Raymond
12/28/2025
Special inspection requirement — Sprinkler Systems
Paul Raymond
12/28/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
12/28/2025
Special inspection requirement — Post-installed Anchors
Paul Raymond
12/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
10/07/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
10/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Signed off — Alteration
X01049668-I1
06/06/2025
Permit issued — Sprinklers
X00615794-I1-EW-SP
06/06/2025
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
05/31/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2025
Signed off — New Building
SOE filed in conjunction with NB application
X00496625-S1
02/26/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/06/2025
Signed off — Alteration
X00936390-I1
02/02/2025
Signed off — Alteration
X00611559-I1
07/17/2024
421-a(16) registration filed
05/30/2024
Permit issued — Solar
X01049668-I1-SL
05/14/2024
Filed — Alteration
X01049668-I1
05/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
05/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
05/10/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
05/10/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
05/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
04/23/2024
Signed off — Alteration
X00881802-I1
03/13/2024
Permit issued — Plumbing
X00615794-I1-EW-SP
01/19/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/11/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
01/11/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Raymond
01/11/2024
Special inspection requirement — Insulation placement and R values
Paul Raymond
01/11/2024
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
01/11/2024
Special inspection requirement — Heating Systems
Paul Raymond
01/11/2024
Special inspection requirement — Footing and Foundation
Paul Raymond
01/11/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Raymond
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
01/11/2024
Special inspection requirement — Structural Steel - High Strength Bolting
Paul Raymond
01/11/2024
Special inspection requirement — Chimneys and vents
Paul Raymond
01/11/2024
Special inspection requirement — Structural Cold-Formed Steel
Paul Raymond
01/11/2024
Special inspection requirement — Subgrade Inspections
Paul Raymond
01/11/2024
Special inspection requirement — Post-installed Anchors
Paul Raymond
01/11/2024
Special inspection requirement — Structural Steel - Welding
Paul Raymond
01/11/2024
Special inspection requirement — Final
Paul Raymond
01/11/2024
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
01/11/2024
Special inspection requirement — Exterior lighting power
Paul Raymond
01/11/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Raymond
01/11/2024
Special inspection requirement — Structural Steel - Details
Paul Raymond
01/08/2024
Filed — New Building
SOE filed in conjunction with NB application
X00496625-P5
01/04/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2023
Permit issued — General Construction
X00496625-I1-GC-CX
12/04/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/30/2023
Violation issued (ECB, closed)
Construction
10/30/2023
Violation issued (ECB, closed)
Construction
10/30/2023
Violation issued (ECB, closed)
Construction
09/26/2023
Permit issued — Supported Scaffold
X00936390-I1-SF
Latest 60 of 96 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler06/06/2025
DOB NOWSolarSigned-offAccord Power05/30/2024
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler03/13/2024
DOB NOWGeneral ConstructionPermit IssuedM Build Builders12/18/2023
DOB NOWSupported ScaffoldSigned-offTopline NYC Contracting09/26/2023
DOB NOWPlumbingSigned-offCitywide Plumbing & Heating & SPKLS06/01/2023
DOB NOWSidewalk ShedSigned-offTopline NYC Contracting05/31/2023
DOB NOWStructuralPermit IssuedM Build Builders04/04/2023
DOB NOWSupport of ExcavationSigned-offM Build Builders03/30/2023
DOB NOWSupport of ExcavationSigned-offHarry's Design09/23/2022
DOB NOWConstruction FenceSigned-offHarry's Design09/20/2022
DOB NOWGeneral ConstructionPermit IssuedHarry's Design04/18/2022
DOB NOWSupport of ExcavationSigned-offHarry's Design03/30/2022
DOB NOWConstruction FenceSigned-offHarry's Design03/24/2022
1 project · most recent 01/08/2024
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/08/2024Permit IssuedM Build BuildersAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Cooper & Hunter CH-36MSPH230VO 36,000 BTU · Heat Pump Outdoor ×18
CH-28MSPH230VO 27,000 BTU · Heat Pump Outdoor ×6
Trane 4WCC4024A1000A 24,600 BTU · Condensing Unit ×4
Islandaire EZ42 11,800 BTU · Ptac ×22
Heating
Cooper & Hunter CH-36MSPH230VO 36,000 BTU · Heat Pump Outdoor ×18
CH-28MSPH230VO 28,000 BTU · Heat Pump Outdoor ×6
Trane 4WCC4024A1000A 22,000 BTU · Condensing Unit ×4
Islandaire EZ42 10,800 BTU · Ptac ×22
Ventilation
Air King 50 CFM/PCM 4.0 SONES@0.1 S.P 460 CFM ×5
3 projects · most recent 05/26/2025
General Wiring
FiledStatusContractorScope
05/26/2025CompletePower Surge Electric—
05/14/2025CompleteIndy ElectricGeneral Wiring
06/02/2023CompleteRichard Neu—
1 project · most recent 01/08/2024
Steel Masonry
FiledStatusContractorScope
01/08/2024Permit IssuedM Build BuildersSteel, Masonry
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/06/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/30/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/07/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
10/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/06/2025Pass-Final SP - Up to 3 Requested FloorsPassView ↗
05/31/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/26/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/19/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/04/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/04/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
12/28/2025HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
12/28/2025Sprinkler SystemsPaul Raymondspecial
12/28/2025Seismic Isolation SystemsPaul Raymondspecial
12/28/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationPaul Raymondspecial
12/28/2025Post-installed AnchorsPaul Raymondspecial
12/28/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
05/10/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
05/10/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
05/10/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
05/10/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
05/10/2024FinalMalathi Ananthakrishnanprogress
01/11/2024Air barrier — testing Paul Raymondenergy_progress
01/11/2024Shutoff dampersPaul Raymondenergy_progress
01/11/2024Fenestration air leakagePaul Raymondenergy_progress
01/11/2024Electrical motors and elevatorsPaul Raymondenergy_progress
01/11/2024HVAC-R and service water piping design and insulationPaul Raymondenergy_progress
01/11/2024HVAC-R and service water heating system controlsPaul Raymondenergy_progress
01/11/2024Insulation placement and R valuesPaul Raymondenergy_progress
01/11/2024HVAC-R and service water heating equipmentPaul Raymondenergy_progress
01/11/2024Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
01/11/2024Exterior lighting powerPaul Raymondenergy_progress
01/11/2024Energy Code Compliance InspectionsPaul Raymondprogress
01/11/2024Footing and FoundationPaul Raymondprogress
01/11/2024Fire-Resistance Rated ConstructionPaul Raymondprogress
01/11/2024FinalPaul Raymondprogress
Latest 25 of 150.
▾Documents — 310 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/25/2026X00611559-I1Request digital key ↗
08/25/2026X00615794-P1Request digital key ↗
08/25/2026X00615794-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/24/2026X00496625-P2Open ↗
08/24/2026X00496625-P1Open ↗
08/24/2026X00496625-P4Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/24/2026X00496625-P2Open ↗
08/24/2026X00496625-P1Open ↗
08/24/2026X00496625-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications248
▸DOB NOWProgress Inspector Seal & Signature148
09/02/2026X00496625-P3Open ↗
09/02/2026X00496625-P3Open ↗
09/02/2026X00496625-P3Open ↗
Showing 3 of 148 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature87
09/02/2026X00496625-P3Open ↗
09/02/2026X00496625-P3Open ↗
09/02/2026X00496625-P3Open ↗
Showing 3 of 87 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature13
08/25/2026X00611559-I1Open ↗
08/25/2026X00615794-P1Open ↗
08/25/2026X00615794-I1Open ↗
Showing 3 of 13 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)6
08/24/2026X00496625-P1Open ↗
08/24/2026X00496625-P4Open ↗
08/24/2026X00496625-I1Open ↗
Showing 3 of 6 on file for this type
▸Safety & Tenant Protection9
▸DOB NOWStreet Tree Checklist6
08/24/2026X00496625-P4Open ↗
08/24/2026X00496625-P1Open ↗
08/24/2026X00496625-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/24/2026X00496625-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCertification by Insurance Broker or Agency1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Other Documents16
▸DOB NOWSite Survey: Initial6
08/24/2026X00496625-P2Open ↗
08/24/2026X00496625-P4Open ↗
08/24/2026X00496625-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone6
08/24/2026X00496625-P4Open ↗
08/24/2026X00496625-P1Open ↗
08/24/2026X00496625-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWAdditional Insured Authorizations1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWWaiver Document1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type