← Back
Two stories - detached, small or mid-size
284 CHELSEA STREET
STATEN ISLAND · BIN 5116366
💬 Discuss this project
1994Year Built
2Stories
A1Building Class
R3XZoning
2,475 sfGross Floor Area
1Units
6 Open Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,800 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC206/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J B I CONSTRUCTION GROUP403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSP ELECTL CNTNG CORPElectrical103/22/2026
J.B.I. CONSTRUCTION GROUPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116206/14/2024
Building Lifecycle
All (21)Filed (2)Permit Issued (1)Signed Off (1)Violation (7)Special Inspection (10)
11/26/2025
Violation issued (HPD, open)
I
12/05/2024
Violation issued (HPD, open)
I
06/18/2024
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01030072-I1
06/14/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01030072-P1
06/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
06/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/14/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/14/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/14/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
06/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
06/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
06/11/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
06/11/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
06/11/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
04/16/2024
Permit issued — Solar
S01030072-I1-SL
04/03/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01030072-I1
11/30/2023
Violation issued (HPD, open)
I
11/21/2022
Violation issued (HPD, open)
I
03/18/2022
Violation issued (HPD, open)
I
04/22/2021
Violation issued (HPD, open)
I
05/13/2011
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. CONSTRUCTION GROUP04/16/2024
BIS—ISSUEDSAVO BROTHERS, INC.09/22/1994
BISPLISSUEDBERCO PLUMBING & HEATING INC.05/05/1994
BIS—ISSUEDSAVO BROTHERS, INC.04/01/1994
1 project · most recent 03/18/2024
FiledStatusContractorScope
03/18/2024CompleteJSP ELECTL CNTNG CORP—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/14/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/14/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/14/2024FinalVYACHESLAV NECHAYEVprogress
06/14/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/14/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
06/11/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/11/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/11/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/11/2024FinalVYACHESLAV NECHAYEVprogress
06/11/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 11 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/21/2026S01030072-P1Request digital key ↗
08/21/2026S01030072-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026S01030072-P1Open ↗
08/27/2026S01030072-P1Open ↗
08/23/2026S01030072-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S01030072-I1Open ↗
08/13/2026S01030072-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026S01030072-P1Open ↗
08/23/2026S01030072-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01030072-I1Open ↗