← Back
BuildNYC
Two stories - detached, small or mid-size
284 CHELSEA STREET
STATEN ISLAND · BIN 5116366
💬 Discuss this project
1994Year Built
2Stories
A1Building Class
R3XZoning
2,475 sfGross Floor Area
1Units
6 Active Violations ▸FDNY Report ↗
Two stories - detached, small or mid-size · 3,800 sf lot · 0.65 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3p · 1 filing · 11 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Etrecte206/14/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Jbi Construction Group403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JSP Electl CNTNGElectrical103/22/2026
J.B.I. Construction GroupGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Etrecte8116206/14/2024
Building Lifecycle
11/26/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/05/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
06/18/2024
Signed off — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01030072-I1
06/14/2024
Filed — Alteration
INSTALLATION OF PV SYSTEM ON EXISTING ROOF TOP. NO CHANGES TO THE USE EGRESS OR OCCUPANCY.
S01030072-P1
06/14/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
21 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offJ.B.I. Construction Group04/16/2024
BIS—ISSUEDSavo Brothers09/22/1994
BISPLISSUEDBerco Plumbing & Heating05/05/1994
BIS—ISSUEDSavo Brothers04/01/1994
1 project · most recent 03/18/2024
FiledStatusContractorScope
03/18/2024CompleteJSP Electl CNTNG—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/14/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/14/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/14/2024FinalVYACHESLAV NECHAYEVprogress
06/14/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/14/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
06/11/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
06/11/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
06/11/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
06/11/2024FinalVYACHESLAV NECHAYEVprogress
06/11/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account