ECB05/04/2026ATOI, OBSERVED FROM OUTSIDE, AT EXPOSURE 2, CONSTRUCTION WORK BEING CARRIED OUT WITHOUT A PERMIT. AN ALTERATION WAS NOTED WHERE A WINDOW OPENING HAS BEEN CLOSED OFF/COVERED. THE WORK APPEARS TO BE APPROXIMATELYHearing held — result not yet published$2K proposed
Two family frame · 3,943 sf lot · 0.45 FAR built
Locations of Work
No floor-level scope or drawing coverage on file for this building.