← Back
Two stories - detached, small or mid-size
2846 BRIGHTON 4 STREET
BROOKLYN · BIN 3320743
💬 Discuss this project
1910Year Built
1Stories
A1Building Class
R6Zoning
810 sfGross Floor Area
1Units
4 Open Violations 0 unresolved · 4 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · 1,720 sf lot · 0.47 FAR built · Flood zone AE
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/14/2024$200K—RMAC TRUST SERIES 2016-CTT → Private party$247/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
INNATION ENGINEERING PC105/08/2025
Building Lifecycle
All (17)Filed (1)Violation (13)Objection (2)Special Inspection (1)
08/13/2025
Objection resolved — Addressed
05/28/2025
Objection raised — Other
05/08/2025
Filed — Alteration
INSTALL MINI SPLIT AC UNIT.PAINT & SHEETROCK @ EXISTING GRAND FATHERED CELLAR.REMOVE WORK W/OUT PERMIT, ECB#35302468R. REMOVE VIOLATION #35387050P,#35325363M, #35302469Z,#35248248K. NO CHANGE IN USE EGRESS/OCCUPANCY, NO DEMOLITION.
B01217052-I1
04/28/2025
Special inspection requirement — Final
NAVEEN KUMAR
09/28/2018
Violation issued (ECB, closed)
Construction
08/20/2018
Violation issued (ECB, closed)
Construction
08/04/2018
Violation issued (ECB, closed)
Construction
07/10/2018
Violation issued (ECB, closed)
Construction
06/13/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/03/2018
Violation issued (ECB, closed)
Construction
05/02/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/18/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/29/2018
Violation issued (ECB, closed)
Construction
03/19/2018
Violation issued (ECB, open)
Construction
02/01/2018
Violation issued (ECB, open)
Construction
02/01/2018
Violation issued (ECB, open)
Quality of Life
01/17/2018
Violation issued (ECB, open)
Construction
Nothing on file for this building.
1 project · most recent 05/05/2026
General Wiring
FiledStatusContractorScope
05/05/2026Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
04/28/2025FinalNAVEEN KUMARprogress
▾Documents — 3 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/21/2026B01217052-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01217052-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B01217052-I1Open ↗