← Back
Over six families without stores
2849 WEBB AVENUE
BRONX · BIN 2015401
💬 Discuss this project
1924Year Built
5Stories
C1Building Class
R6Zoning
22,000 sfGross Floor Area
28Units
Rent Stabilized318 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: NARINO REALTY LLC · 6,250 sf lot · 3.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanical
Roof2p · 1 filing · 5 docs
Cellar1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ORENCOGROUP608/29/2026
NARINO REALTY LLC503/22/2026
MARLIN REALTY LLC103/22/2026
2849 WEBB LLC303/22/2026
2849 WEBB PROPERTIES LLC.103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2014$2.5M—2849 WEBB LLC → NARINO REALTY LLC$116/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ENTHINK ENGINEERING LLC107/29/2026
NEW AGE ENGINEERING PLLC105/12/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & Y ELECTRIC AND INTER*Electrical103/22/2026
SAHI CONSTRUCTION CORPGeneral Contractor108/05/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENTHINK ENGINEERS LLC6247107/29/2026
Building Lifecycle
All (74)Filed (2)Permit Issued (3)Signed Off (1)Violation (60)Inspection (2)Special Inspection (6)
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
A
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
08/28/2026
Violation issued (HPD, open)
A
08/28/2026
Violation issued (HPD, open)
A
08/20/2026
Violation issued (HPD, open)
C
08/10/2026
Violation issued (ECB, open)
Construction
08/07/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
C
08/04/2026
Permit issued — General Construction
X01437980-I1-GC-CX
07/29/2026
Filed — Alteration
PROVIDE NEW SHEETROCK CEILING WITHIN THE DESIGNATED AREA OF WORK. EXTENT OF CEILING REPAIR/REPLACEMENT SHALL BE VERIFIED IN THE FIELD BY THEGC/CONTRACTOR PRIOR TO CONSTRUCTION. REPAIR/PAINT ALL WALL SURFACES WITHIN THE DEIGNATED AREA OF WORK.
X01437980-I1
07/29/2026
Special inspection requirement — Wood – Seismic Resistance
Sunil Saigal
07/29/2026
Special inspection requirement — Tenant Protection Plan Compliance
Sunil Saigal
07/29/2026
Special inspection requirement — Final
Sunil Saigal
07/13/2026
Violation issued (HPD, open)
B
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
C
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
B
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
C
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/08/2026
Violation issued (HPD, open)
I
07/06/2026
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/05/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, closed)
C
07/05/2026
Violation issued (HPD, open)
C
07/05/2026
Violation issued (HPD, open)
C
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offSAHI CONSTRUCTION CORP08/04/2026
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH09/03/2021
DOB NOWBoiler EquipmentSigned-offCAM ENERGY HTG AND MECH05/19/2021
2 projects · most recent 05/25/2021
Boiler Controls
FiledStatusContractorScope
05/25/2021CompleteTEXEIRA ELECTRIC CORPBoiler Controls
11/11/2019CompleteJ & Y ELECTRIC AND INTER*—
1 project · most recent 07/29/2026
Wood
FiledStatusContractorScope
07/29/2026Signed-offSAHI CONSTRUCTION CORPWood
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
09/14/2021Pass-Final Boiler Equipment InspectionPassView ↗
09/09/2021No Access-Final Boiler Equipment InspectionNo AccessView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
07/29/2026Wood – Seismic ResistanceSunil Saigalspecial
07/29/2026Tenant Protection Plan ComplianceSunil Saigalspecial
07/29/2026FinalSunil Saigalprogress
04/08/2021Maintenance informationStephen Shishkoenergy_progress
04/08/2021HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
04/08/2021HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00500282-I1Request digital key ↗
08/16/2026X01437980-I1Request digital key ↗
▸Seals & Professional Certifications7
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026X00500282-I1Open ↗
09/23/2026X00500282-I1Open ↗
09/23/2026X00500282-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/16/2026X01437980-I1Open ↗
08/13/2026X00500282-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/29/2026X01437980-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/16/2026X01437980-I1Open ↗
08/13/2026X00500282-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026X00500282-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026X00500282-I1Open ↗