← Back
BuildNYC
Two stories - detached, small or mid-size
285 BRADFORD AVENUE
STATEN ISLAND · BIN 5084100
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R3XZoning
1,708 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.28 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed photovoltaic power system1p · 1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering111/14/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NY State Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841111/14/2025
Building Lifecycle
12/15/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01318903-I1
11/17/2025
Permit issued — Solar
S01318903-I1-SL
11/14/2025
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01318903-I1
11/14/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
11/14/2025
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS11/17/2025
BISCCISSUEDNew Age Contracting12/02/2014
BISEQISSUEDNew Age Contracting12/02/2014
BISOTISSUEDNew Age Contracting12/02/2014
1 project · most recent 11/14/2025
FiledStatusContractorScope
11/14/2025CompleteNY Solar Electrical—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
11/14/2025Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
11/14/2025Air barrier - visual inspectionROBERT MASONEenergy_progress
11/13/2025Fire-Resistant Penetrations and JointsROBERT MASONEspecial
11/13/2025Energy Code Compliance InspectionsROBERT MASONEprogress
11/13/2025FinalROBERT MASONEprogress
30 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account