← Back
BROOKLYN
285 FRONT STREET
BROOKLYN · BIN 3815380
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
CONSOLIDATED EDISON109/02/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GEI CONSULTANTS INC. P.C.108/03/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TECTONIC ENGINEERING CONS106108/03/2026
Building Lifecycle
All (15)Filed (1)Objection (10)Special Inspection (4)
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
09/02/2026
Objection resolved — Addressed
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/03/2026
Filed — Alteration
THESE DRAWINGS SHOW THE SUPPORT OF EXCAVATION SYSTEM REQUIRED FOR THE CONSTRUCTION OF THE PROPOSED HUDSON-JOHNLAUNCHING SHAFT FOR NEW 138KV TRANSMISSION FEEDERS.
B01426414-I1
07/24/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
GEORGE GHEBRYAL
07/24/2026
Special inspection requirement — Structural Steel - Welding
GEORGE GHEBRYAL
07/10/2026
Special inspection requirement — Concrete - Cast-In-Place
GEORGE GHEBRYAL
07/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
GEORGE GHEBRYAL
Nothing on file for this building.
1 project · most recent 08/03/2026
FiledStatusContractorScope
08/03/2026——2 scope_items
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
07/24/2026Structural Stability – Alterations of existing buildingsGEORGE GHEBRYALspecial
07/24/2026Structural Steel - WeldingGEORGE GHEBRYALspecial
07/10/2026Concrete - Cast-In-PlaceGEORGE GHEBRYALspecial
07/10/2026Excavations - Sheeting, Shoring, and BracingGEORGE GHEBRYALspecial
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026B01426414-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026B01426414-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01426414-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/16/2026B01426414-I1Open ↗