← Back
BuildNYC
Miscellaneous educational facility
Washington Square CoGen Campus
285 MERCER STREET · Greenwich Village · BIN 1008826
💬 Discuss this project
1910Year Built
10Stories
W9Building Class
R7-2Zoning
20,550 sfGross Floor Area
14Units
0 Active ViolationsFISP: SWARMP
Miscellaneous educational facility · Owner of record: New York University · 2,068 sf lot · 9.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew York University9p · 2 filings · 7 docs
Floor 10New York University3p · 1 filing · 4 docs
Floor 9
Floor 8
Floor 7
Floor 61 filing · 10 docs
Floor 51 filing · 10 docs
Floor 41 filing · 10 docs
Floor 3
Floor 2
Floor 1New York University36p · 4 filings · 17 docs
CellarNew York UniversityUnder Construction16p · 3 filings · 16 docs
BasementNew York University1p · 1 filing · 4 docs
Sub-BasementNew York University3p · 1 filing · 4 docs
Site & exteriorNew York UniversityUnder Construction12p · 5 filings · 11 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
New York University8710/21/2026
DOB Services407/08/2026
NYU103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Napach Design Group110/20/2026
HC Pec106/24/2026
Lpe Engineering104/23/2026
Matiz Architecture and Design411/12/2024
Lucid Building Engineering110/23/2024
MSM Engineering Services410/11/2024
Halo Architecture210/11/2024
Ashraf101/16/2023
Lizardos Engineering210/12/2022
Nicolas Baratto Architect105/04/2022
Syed Engineering110/01/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Modern Building Consultant603/21/2026
Green Studio203/21/2026
Yao W Guo Architect203/21/2026
Socotec1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Green City Box TransGeneral Contractor603/21/2026
Thomas FayFire Protection503/21/2026
PJP InstallersScaffold306/27/2026
SPK/Lewis ConstructionGeneral Contractor307/08/2026
Brosna ConstructionGeneral Contractor204/09/2026
Ashlar MechanicalFire Protection207/08/2026
Sato Construction CoGeneral Contractor203/21/2026
Anesis ServicesFire Protection107/08/2026
Hydrokinetic Plumbing & Heating IPlumbing107/08/2026
Millennium Maintenance & ElectricalElectrical103/21/2026
Wasoff Plumbing & Utility CoPlumbing107/08/2026
Vally Electric CompanyElectrical103/21/2026
Jem Electrical ContractingElectrical103/22/2026
Mutual ElectricElectrical103/21/2026
DNA ContractingGeneral Contractor107/08/2026
Platinum Services NYScaffold107/08/2026
A1 SpecializedSign hanger107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
McHenery Testing Lab9181110/20/2026
Richmond Testing Lab263204/23/2026
Fenagh6942311/12/2024
Halo Architecture8021210/11/2024
MSM Engineering Services8449410/11/2024
Kline Engineering1007210/12/2022
Building Lifecycle
All (136)Filed (19)Permit Issued (17)Signed Off (12)Facade (FISP) (12)Violation (33)Inspection (13)Special Inspection (30)
10/20/2026
Filed — Alteration
Filing herewith mechanical modifications as per plans
M01377436-I1
06/24/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION ENCLOSURE/FENCE AS PER DRAWINGS. FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION
M01420502-I1
06/24/2026
Permit issued — Construction Fence
M01420502-I1-FN
05/01/2026
Permit issued — General Construction
M01322982-I1-GC-CX
04/23/2026
Filed — Alteration
SIDEWALK VAULT REPLACEMENT AS PER PLANS. NO CHANGE IN OCCUPANCY USE OR EGRESS.
M01322982-I1
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TREVOR O. FLOWERS
04/15/2026
Special inspection requirement — Interior lighting power
TREVOR O. FLOWERS
04/15/2026
Special inspection requirement — Lighting controls
TREVOR O. FLOWERS
04/08/2026
Special inspection requirement — Structural Steel - High Strength Bolting
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Sprayed fire-resistant materials
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Post-installed Anchors
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Concrete - Cast-In-Place
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Structural Steel - Details
RICHARD LEMANSKY
04/08/2026
Special inspection requirement — Structural Steel - Welding
RICHARD LEMANSKY
03/24/2026
Special inspection requirement — Final
TREVOR O. FLOWERS
02/06/2026
Signed off — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-S3
01/08/2026
Signed off — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-S1
01/08/2026
Signed off — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-I1
11/21/2025
Special inspection requirement — Final
Roberta Levine
09/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/20/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/20/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/10/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/06/2025
Permit issued — Sprinklers
M01110748-S3-PL
06/06/2025
Permit issued — Plumbing
M01110748-S3-EW-SP
04/24/2025
Signed off — Alteration
Modifications of drawings to include hydraulic notes and pressure gauge at top of standpipe riser as well as addition of hydraulic calculations
M00526880-I1
04/03/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
03/28/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/28/2025
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
03/11/2025
Permit issued — General Construction
M01110748-I1-GC
03/11/2025
Permit issued — Mechanical Systems
M01110748-S1-MS
03/03/2025
Permit issued — Standpipe
M00526880-I1-EW-SD
11/12/2024
Filed — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-S3
11/12/2024
Filed — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-S1
11/08/2024
Signed off — Alteration
FILE TO REPLACE TWO ILLUMINATED ALUMINUM CHANNEL LETTER SIGNS ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. REPLACEMENT TO BE IN THE SAME LOCATION AND POSITION AND SAME SURFACE AREA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01128716-I1
11/07/2024
Filed — Alteration
SUBSEQUENT APPLICATION TO REMOVE PLUMBING FIXTURES AND MODIFY SPRINKLER SYSTEM, RELOCATE FIRE HOSE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M01110748-I1
11/07/2024
Special inspection requirement — Air barrier - visual inspection
AILANTO DANIEL MINAWI
11/06/2024
Signed off — Alteration
Propose mechanical work for existing commercial building in conjunction with DOB Now #M01056125 as per plan. No change in use, egress, or occupancy.
M01056125-S1
10/29/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/25/2024
Permit issued — Sign
M01128716-I1-SG
10/23/2024
Filed — Alteration
FILE TO REPLACE TWO ILLUMINATED ALUMINUM CHANNEL LETTER SIGNS ON WALL FOR EXISTING 1ST FLOOR COMMERCIAL SPACE. REPLACEMENT TO BE IN THE SAME LOCATION AND POSITION AND SAME SURFACE AREA. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
M01128716-I1
10/17/2024
Signed off — Alteration
Propose mechanical work for existing commercial building in conjunction with DOB Now #M01056125 as per plan. No change in use, egress, or occupancy.
M01056125-I1
10/17/2024
Signed off — Alteration
Propose mechanical work for existing commercial building in conjunction with DOB Now #M01056125 as per plan. No change in use, egress, or occupancy.
M01056125-S2
10/17/2024
Special inspection requirement — Final
YUNHO LEE
10/16/2024
Special inspection requirement — Lighting controls
Hanli Liu
10/16/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
10/16/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
10/16/2024
Special inspection requirement — Final
Hanli Liu
10/16/2024
Special inspection requirement — Interior lighting power
Hanli Liu
10/11/2024
Filed — Alteration
Propose mechanical work for existing commercial building in conjunction with DOB Now #M01056125 as per plan. No change in use, egress, or occupancy.
M01056125-P2
10/11/2024
Filed — Alteration
Propose mechanical work for existing commercial building in conjunction with DOB Now #M01056125 as per plan. No change in use, egress, or occupancy.
M01056125-P3
09/30/2024
Special inspection requirement — Final
MOHAMED MAHMOUD
09/30/2024
Special inspection requirement — Final
Hanli Liu
09/30/2024
Special inspection requirement — Interior lighting power
Hanli Liu
09/30/2024
Special inspection requirement — Lighting controls
Hanli Liu
09/30/2024
Special inspection requirement — Energy Code Compliance Inspections
Hanli Liu
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hanli Liu
09/30/2024
Special inspection requirement — Energy Code Compliance Inspections
MOHAMED MAHMOUD
09/30/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MOHAMED MAHMOUD
Latest 60 of 136 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedPJP Installers06/24/2026
DOB NOWGeneral ConstructionPermit IssuedDNA Contracting05/01/2026
DOB NOWPlumbingSigned-offHydrokinetic Plumbing & Heating I06/06/2025
DOB NOWSprinklersSigned-offThomas Fay06/06/2025
DOB NOWGeneral ConstructionSigned-offBrosna Construction03/11/2025
DOB NOWMechanical SystemsSigned-offBrosna Construction03/11/2025
DOB NOWStandpipeSigned-offAshlar Mechanical03/03/2025
DOB NOWSignSigned-offMad Signs10/25/2024
DOB NOWMechanical SystemsSigned-offGreen City Box Trans08/16/2024
DOB NOWPlumbingSigned-offWasoff Plumbing & Utility Co07/16/2024
DOB NOWGeneral ConstructionSigned-offGreen City Box Trans06/28/2024
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction11/28/2023
DOB NOWGeneral ConstructionSigned-offSato Construction Co01/26/2023
DOB NOWSidewalk ShedSigned-offPlatinum Services NY01/17/2023
DOB NOWGeneral ConstructionSigned-offSPK/Lewis Construction08/01/2022
DOB NOWSprinklersSigned-offAshlar Mechanical04/20/2022
DOB NOWSidewalk ShedSigned-offPJP Installers03/20/2020
BISOTISSUEDEdifice Design09/25/2020
BISOTISSUEDBrosna Construction07/27/2020
BISOTISSUEDBrosna Construction07/24/2020
BISOTISSUEDEdifice Design10/16/2019
BISSPISSUEDAnesis Services02/27/2019
BISSPISSUEDAnesis Services02/06/2019
BISPLISSUEDHydrokinetic Plumbing & Heating I02/06/2019
BISOTISSUEDBrosna Construction01/28/2019
BISMHISSUEDBrosna Construction01/28/2019
BIS—ISSUEDNational Maintenance01/18/2017
BISMHISSUEDDGC Capital Contracting01/06/2017
BISOTISSUEDDGC Capital Contracting01/06/2017
BIS—ISSUEDNational Maintenance11/23/2016
BIS—ISSUEDNational Maintenance11/23/2016
BIS—ISSUEDNational Maintenance11/23/2016
BISEQISSUEDDGC Capital Contracting07/28/2016
BISSPISSUEDCapitol Fire Sprinkler Co07/08/2016
BISPLISSUEDJag Plumbing & Mechanical07/05/2016
BISOTISSUEDDGC Capital Contracting06/20/2016
BISMHISSUEDDGC Capital Contracting06/20/2016
BISEQISSUEDSkyline Scaffolding Group06/13/2016
BISSPISSUEDVarsity Plumbing & Heating11/17/2010
BISOTISSUEDKay Waterproofing10/15/2010
+ 27 more permits on file
1 project · most recent 10/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026——Heating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Carrier 42BHC30KD4R 3,000 CFM · Ahu ×2
Ice Air %FC3BE04 300 CFM · Fan Coil Indoor ×1
Task TYE083CAV-363672 3,000 CFM · Ahu ×1
Ventilation
Greenheck SQ-70-VG 75 CFM · Exhaust Fan ×1
1 project · most recent 10/20/2026
FiledStatusContractorScope
10/20/2026——89 heads
1 project · most recent 10/20/2026
Water/Sanitary
FiledStatusContractorScope
10/20/2026——Water/Sanitary
15 projects · most recent 10/20/2026
General Wiring
FiledStatusContractorScope
10/20/2026Permit IssuedAmsterdam Electric—
07/10/2026Permit IssuedTop Shelf Electric—
05/05/2025CompleteMatros Automated ElectricalGeneral Wiring
02/08/2025CompleteJem Electrical ContractingGeneral Wiring
10/23/2024CompleteVoltron Electric—
10/23/2024CompleteVoltron Electric—
07/08/2024CompleteMatros Automated ElectricalGeneral Wiring
01/11/2024CompleteMatros Automated ElectricalGeneral Wiring
12/22/2022CompleteIlluminous ElectricGeneral Wiring
03/05/2020CompleteEnnell Group ElectricGeneral Wiring
09/27/2019CompleteTop Shelf Electric—
04/18/2018Permit IssuedNational Maintenance—
04/18/2018Permit IssuedNational Maintenance—
04/18/2018Permit IssuedNational Maintenance—
04/18/2018Permit IssuedNational Maintenance—
1 project · most recent 04/23/2026
Steel Concrete
FiledStatusContractorScope
04/23/2026Permit IssuedDNA ContractingSteel, Concrete
▾Field Inspections (DOB CAP) — 13
DateTypeResultReport
09/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/20/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/20/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/10/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/03/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
03/28/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/28/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
10/29/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
08/21/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
05/04/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
04/15/2026Fire-Resistant Penetrations and JointsTREVOR O. FLOWERSspecial
04/15/2026Interior lighting powerTREVOR O. FLOWERSenergy_progress
04/15/2026Lighting controlsTREVOR O. FLOWERSenergy_progress
04/08/2026Structural Steel - High Strength BoltingRICHARD LEMANSKYspecial
04/08/2026Sprayed fire-resistant materialsRICHARD LEMANSKYspecial
04/08/2026Post-installed AnchorsRICHARD LEMANSKYspecial
04/08/2026Structural Stability – Alterations of existing buildingsRICHARD LEMANSKYspecial
04/08/2026Concrete - Cast-In-PlaceRICHARD LEMANSKYspecial
04/08/2026Structural Steel - DetailsRICHARD LEMANSKYspecial
04/08/2026Structural Steel - WeldingRICHARD LEMANSKYspecial
03/24/2026FinalTREVOR O. FLOWERSprogress
11/21/2025FinalRoberta Levineprogress
11/07/2024Air barrier - visual inspectionAILANTO DANIEL MINAWIenergy_progress
10/17/2024FinalYUNHO LEEprogress
10/16/2024Lighting controlsHanli Liuenergy_progress
10/16/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
10/16/2024Energy Code Compliance InspectionsHanli Liuprogress
10/16/2024FinalHanli Liuprogress
10/16/2024Interior lighting powerHanli Liuenergy_progress
09/30/2024FinalMOHAMED MAHMOUDprogress
09/30/2024FinalHanli Liuprogress
09/30/2024Interior lighting powerHanli Liuenergy_progress
09/30/2024Lighting controlsHanli Liuenergy_progress
09/30/2024Energy Code Compliance InspectionsHanli Liuprogress
09/30/2024Fire-Resistant Penetrations and JointsHanli Liuspecial
Latest 25 of 52.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
New York UniversityEducationEntire building
Project M01420502 Alteration · Permit Entire · 06/24/2026
Project M01322982 Alteration · Permit Entire · 04/23/2026
Project M01110748 Alteration · LOC Issued · 11/07/2024
Project M01128716 Alteration · LOC Issued · 10/23/2024
Project M01056125 Alteration · LOC Issued · 06/26/2024
Project M00803122 Alteration · LOC Issued · 01/16/2023
Project M08024900 Alteration · LOC Issued · 11/16/2022
Project M00653090 Alteration · LOC Issued · 05/04/2022
Project M00526880 Alteration · LOC Issued · 04/05/2022
Project M00234118 Alteration · LOC Issued · 10/01/2019
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 461 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch21
10/21/2026M01377436-S3Request digital key ↗
10/21/2026M01377436-I1Request digital key ↗
10/21/2026M01377436-S1Request digital key ↗
Showing 3 of 21 on file for this type
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/05/2026M00234118-I1Request digital key ↗
▸Applications & Permits60
▸BISWORK PERMIT APPLICATION30
07/27/2020140906189Open ↗
07/22/2020140906152Open ↗
10/17/2019123775218Open ↗
Showing 3 of 30 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION30
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
12/03/2019123511093Open ↗
Showing 3 of 30 on file for this type
▸Seals & Professional Certifications161
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION48
12/09/2019123511093Open ↗
12/09/2019123511093Open ↗
12/09/2019123511093Open ↗
Showing 3 of 48 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
10/22/2026M01377436-I1Open ↗
10/22/2026M01377436-I1Open ↗
10/22/2026M01377436-I1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
10/21/2026M01377436-S3Open ↗
10/21/2026M01377436-I1Open ↗
10/21/2026M01377436-S1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST19
12/03/2019123511066Open ↗
11/22/2019123511093Open ↗
08/23/2019123775218Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
10/22/2026M01377436-I1Open ↗
10/22/2026M01377436-S3Open ↗
10/22/2026M01377436-S1Open ↗
Showing 3 of 15 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT14
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
08/23/2019123775218Open ↗
Showing 3 of 14 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
Showing 2 of 3 on file for this type
▸BISPC FULL REPORT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE7
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 7 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
01/10/2019123527148Open ↗
01/10/2019123511093Open ↗
01/10/2019123511066Open ↗
Showing 3 of 4 on file for this type
▸BISSPRINKLER INSP REPORT : FP-851
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection1
▸BISTenant Protection Plan and Notes1
08/23/2019123775218Open ↗
▸Environmental & Asbestos38
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
10/21/2026M01377436-S2Open ↗
10/21/2026M01377436-S1Open ↗
10/21/2026M01377436-S3Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)11
01/14/2019123252773Open ↗
01/10/2019123527148Open ↗
01/10/2019123511093Open ↗
Showing 3 of 11 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)2
07/13/2020140906189Open ↗
06/17/2020140906152Open ↗
▸BISAPPLICANT SHALL PROVIDE 1 ACP-21 FORMPRIOR TO SIGN OFF: TRU2541MN191
05/17/2021123775218Open ↗
▸BISDEP FORM V5 - ASBESTOS VARIANCE1
10/17/2019123775218Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026M00526880-I1Open ↗
▸Energy Compliance30
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS8
12/09/2019123511093Open ↗
08/23/2019123775218Open ↗
08/23/2019123775218Open ↗
Showing 3 of 8 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS8
12/17/2021140906152Open ↗
12/16/2021140906152Open ↗
12/16/2021140906189Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY7
12/17/2021140906152Open ↗
12/17/2021140906152Open ↗
12/13/2021140906152Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/17/2021123775218Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
07/06/2020140906189Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISNYCECC ANALYSIS1
07/06/2020140906189Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
09/02/2026M00653090-I1Open ↗
▸Inspections & Test Reports18
▸BISTECHNICAL REPORT: RESPONSIBILITY16
12/17/2021140906152Open ↗
12/17/2021140906152Open ↗
12/16/2021140906189Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: CONCRETE-TEST CYLINDER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs28
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST19
12/22/2021140906152Open ↗
12/16/2021140906189Open ↗
05/18/2021123775218Open ↗
Showing 3 of 19 on file for this type
▸BISADMINISTRATIVE OBJECTIONS6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter2
09/02/2026M00653090-I1Open ↗
09/01/2026M08024900-I1Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership43
▸BISCOST AFFIDAVIT40
12/17/2021140906152Open ↗
12/17/2021140906152Open ↗
12/16/2021140906189Open ↗
Showing 3 of 40 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/13/2021140906152Open ↗
05/17/2021123775218Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
06/02/2017122845476Open ↗
▸Filing & Intake Forms41
▸BISEFILING COVER SHEET21
08/23/2019123775218Open ↗
01/14/2019123252773Open ↗
01/10/2019123527148Open ↗
Showing 3 of 21 on file for this type
▸BISBOROUGH INTAKE FORM9
02/18/2020123511066Open ↗
12/09/2019123511093Open ↗
11/22/2019123511093Open ↗
Showing 3 of 9 on file for this type
▸BISADDITIONAL INFORMATION7
09/02/2016122720092Open ↗
09/02/2016122720092Open ↗
Showing 2 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET4
07/06/2020140906189Open ↗
06/17/2020140906152Open ↗
Showing 2 of 4 on file for this type