← Back
Three families
2856 KINGSBRIDGE TERRACE
BRONX · BIN 2015542
💬 Discuss this project
1920Year Built
3Stories
C0Building Class
R6Zoning
4,575 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸
Three families · Owner of record: KINGSBRIDGE RESIDENTS LLC · 3,000 sf lot · 1.53 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionCivil
Roof15p · 1 filing · 20 docs
Floor 418p · 1 filing · 20 docs
Floor 313p · 1 filing · 20 docs
Floor 217p · 1 filing · 20 docs
Floor 114p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MJH CONSTRUCTION2204/09/2026
KINGSBRIDGE RESIDENTS LLC103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/10/2024$1.1M—— → —$251/sf building
06/21/2016$450K—Private party → Private party$98/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LESTER KATZ, NCARB505/06/2025
SELF EMPLOYED304/08/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EXPRESS FILING INC1603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH CONSTRUCTION CORPGeneral Contractor204/09/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616805/06/2025
Building Lifecycle
All (83)Filed (8)Permit Issued (4)Signed Off (2)Violation (15)Inspection (10)Objection (14)Special Inspection (30)
06/08/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/16/2026
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
06/05/2025
Violation issued (HPD, closed)
A
05/16/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/16/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/16/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/16/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/16/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/16/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/16/2025
Special inspection requirement — Metering
FAHAD FATEH
05/16/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/16/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/16/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/16/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
05/16/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/07/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-P6
05/06/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
05/06/2025
Special inspection requirement — Fenestration areas
FAHAD FATEH
05/06/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
FAHAD FATEH
05/06/2025
Special inspection requirement — Exterior lighting power
FAHAD FATEH
05/06/2025
Special inspection requirement — Lighting controls
FAHAD FATEH
05/06/2025
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
05/06/2025
Special inspection requirement — Fenestration air leakage
FAHAD FATEH
05/06/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/06/2025
Special inspection requirement — Metering
FAHAD FATEH
05/06/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/06/2025
Special inspection requirement — Interior lighting power
FAHAD FATEH
05/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/06/2025
Special inspection requirement — Lighting in dwelling units
FAHAD FATEH
05/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
05/06/2025
Special inspection requirement — Insulation placement and R values
FAHAD FATEH
04/30/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-S2
04/08/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-P4
04/08/2025
Signed off — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-S3
04/03/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-P5
04/01/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/31/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/26/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/20/2025
Permit issued — Mechanical Systems
X01088451-S3-MS
03/07/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-P2
03/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/24/2025
Objection resolved — Addressed
02/18/2025
Objection resolved — Addressed
02/05/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-P1
01/31/2025
Objection raised — Energy
01/31/2025
Objection raised — Zoning
01/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
01/24/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
01/24/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-S3
01/06/2025
Filed — Alteration CO
PROPOSED INTERIOR RENOVATION, CONVERTING AN EXISTING FOUR STORY INTO A TOTAL OF 9 RESIDENTIAL UNITS
X01088451-S2
01/06/2025
Permit issued — Plumbing
X01088451-S2-EW-SP
01/06/2025
Permit issued — Sprinklers
X01088451-S2-PL
12/31/2024
Permit issued — General Construction
X01088451-I1-GC
11/07/2024
Objection resolved — Addressed
11/07/2024
Objection resolved — Addressed
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offMJH CONSTRUCTION CORP03/20/2025
DOB NOWPlumbingSigned-offA M B MECHANICAL INC01/06/2025
DOB NOWSprinklersSigned-offPRIME PIPING & HEATING IN01/06/2025
DOB NOWGeneral ConstructionPermit IssuedMJH CONSTRUCTION CORP12/31/2024
BISOTISSUEDERIC - SHERRI CONSTRUCTION INC.09/01/1994
BISBLISSUEDA & C WELDING02/11/1992
BISFBISSUEDA & C WELDING11/26/1991
1 project · most recent 05/06/2025
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/06/2025Signed-offMJH CONSTRUCTION CORPHeating and Air Conditioning Systems
Heat / Cool
Daikin 3MXM24AVJU9 24,000 BTU · Heat Pump Outdoor ×4
4MXM36AVJU9 36,000 BTU · Heat Pump Outdoor ×2
RXF12AXVJU 18,000 BTU · Heat Pump Outdoor ×2
2MXM18AVJU9 18,900 BTU · Heat Pump Outdoor ×1
1 project · most recent 05/06/2025
Sprinkler System
FiledStatusContractorScope
05/06/2025Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 05/06/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/06/2025Signed-offA M B MECHANICAL INCGas, Storm, Water/Sanitary
2 projects · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
11/02/2021CompleteAPPROVED ELECTRIC CORP.General Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/08/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
04/16/2026Fail-Final Curb Cut Non-Directive 14FailView ↗
05/07/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/01/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/31/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/26/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
01/24/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/24/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/24/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 67
DateRequirementInspectorRole
05/16/2025Interior lighting powerFAHAD FATEHenergy_progress
05/16/2025Fenestration areasFAHAD FATEHenergy_progress
05/16/2025Maintenance informationFAHAD FATEHenergy_progress
05/16/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
05/16/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/16/2025Lighting controlsFAHAD FATEHenergy_progress
05/16/2025Fenestration air leakageFAHAD FATEHenergy_progress
05/16/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/16/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/16/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/16/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/16/2025Lighting in dwelling unitsFAHAD FATEHenergy_progress
05/16/2025Exterior lighting powerFAHAD FATEHenergy_progress
05/16/2025MeteringFAHAD FATEHenergy_progress
05/16/2025Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
05/06/2025Insulation placement and R valuesFAHAD FATEHenergy_progress
05/06/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/06/2025Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
05/06/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
05/06/2025Fire-Resistance Rated ConstructionFAHAD FATEHprogress
05/06/2025MeteringFAHAD FATEHenergy_progress
05/06/2025Lighting controlsFAHAD FATEHenergy_progress
05/06/2025Interior lighting powerFAHAD FATEHenergy_progress
05/06/2025Exterior lighting powerFAHAD FATEHenergy_progress
05/06/2025Air barrier - visual inspectionFAHAD FATEHenergy_progress
Latest 25 of 67.
▾Documents — 54 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/19/2026X01088451-P4Request digital key ↗
08/19/2026X01088451-P6Request digital key ↗
08/19/2026X01088451-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Seals & Professional Certifications26
▸DOB NOWProgress Inspector Seal & Signature13
08/31/2026X01088451-I1Open ↗
08/31/2026X01088451-I1Open ↗
08/31/2026X01088451-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026X01088451-P4Open ↗
08/13/2026X01088451-P5Open ↗
08/13/2026X01088451-P6Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026X01088451-I1Open ↗
08/29/2026X01088451-P1Open ↗
08/26/2026X01088451-P4Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
08/13/2026X01088451-P5Open ↗
08/13/2026X01088451-I1Open ↗
08/13/2026X01088451-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026X01088451-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X01088451-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X01088451-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026X01088451-P6Open ↗
08/13/2026X01088451-S3Open ↗
08/13/2026X01088451-P1Open ↗
Showing 3 of 8 on file for this type
▸Other Documents5
▸DOB NOWProperty Ownership Certification4
08/13/2026X01088451-P5Open ↗
08/13/2026X01088451-P6Open ↗
08/13/2026X01088451-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/13/2026X01088451-I1Open ↗