← Back
Miscellaneous two family
286 BAY 22 STREET
BROOKLYN · Bath Beach · BIN 3169850
💬 Discuss this project
1940Year Built
1Stories
B9Building Class
R5Zoning
1,652 sfGross Floor Area
2Units
Miscellaneous two family · 3,364 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 14p · 2 filings · 8 docs
Basement1p · 1 filing · 3 docs
Sub-Basement4p · 2 filings · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/22/2023$960K—286 BAY 22 STREET LLC → Private party$581/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FACTORY ENGINEERING WORKS PLLC208/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KON HO LEE CONSULTING ENGINEER PLL403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YUNG WAY CONSTRUCTION INC.General Contractor107/08/2026
CROSSFIELD PLBG.&HTGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FACTORY ENGINEERING WORKS8855208/07/2023
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Inspection (6)Special Inspection (2)
02/15/2024
Signed off — Alteration
REPLACE(1)SHOWER,(1)W.C. AND(1)LAV.RELOCATE(2)GAS METERS,(1)STOVE,(1)SINK,(1)BOILER AND(1)H.W.H.,INSTALL(1)F.D.,(1)BOILER AND(1)H.W.H. AT BASEMENT.REMOVE(1)SHOWER,(1)LAV. AND(1)W.C.,RELOCATE(1)STOVE AND(1)SINK,INSTALL(1)SHOWER,(2)LAV. AND(2)W.C. AT 1ST FL
B00912847-I1
02/15/2024
Signed off — Alteration
INTERIOR RENOVATION OF EXISTING 2 STORY BRICK BUILDING. NO CHANGE IN USE OCCUPANCY OR EGRESS.
B00912843-I1
02/13/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/19/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/19/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/28/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/26/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/10/2023
Permit issued — Plumbing
B00912847-I1-PL
08/08/2023
Permit issued — General Construction
B00912843-I1-GC
08/07/2023
Filed — Alteration
REPLACE(1)SHOWER,(1)W.C. AND(1)LAV.RELOCATE(2)GAS METERS,(1)STOVE,(1)SINK,(1)BOILER AND(1)H.W.H.,INSTALL(1)F.D.,(1)BOILER AND(1)H.W.H. AT BASEMENT.REMOVE(1)SHOWER,(1)LAV. AND(1)W.C.,RELOCATE(1)STOVE AND(1)SINK,INSTALL(1)SHOWER,(2)LAV. AND(2)W.C. AT 1ST FL
B00912847-I1
08/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kui He
08/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Kui He
08/06/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 2 STORY BRICK BUILDING. NO CHANGE IN USE OCCUPANCY OR EGRESS.
B00912843-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG08/10/2023
DOB NOWGeneral ConstructionSigned-offB & A COMMERCIAL INC08/08/2023
1 project · most recent 08/09/2023
General Wiring
FiledStatusContractorScope
08/09/2023CompleteKWONG MING ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
02/13/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/19/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/19/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/28/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
09/26/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
08/07/2023Fire-Resistant Penetrations and JointsKui Hespecial
08/07/2023Energy Code Compliance InspectionsKui Heprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00912843-I1Request digital key ↗
08/27/2026B00912847-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00912843-I1Open ↗
08/27/2026B00912847-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/28/2026B00912847-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026B00912847-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00912843-I1Open ↗
08/27/2026B00912847-I1Open ↗