← Back
Zoned commercial or Manhattan residential
286 RIDER AVENUE
BRONX · BIN 2000954
💬 Discuss this project
0Year Built
—Stories
V1Building Class
M1-4/R7AZoning
0 sfGross Floor Area
0Units
Rent Stabilized0 Open Violations
Zoned commercial or Manhattan residential · Owner of record: 286 RIDER AVENUE OWNER LLC · 21,078 sf lot · 0 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralFire ProtectionEquipmentGeneral
Roof4p · 2 filings · 20 docs
Floor 81p · 1 filing · 11 docs
Floor 72p · 2 filings · 13 docs
Floor 6
Floor 5
Floor 4
Floor 3
Floor 21p · 1 filing · 11 docs
Floor 13p · 2 filings · 19 docs
1 job · most recent 03/25/2025
FiledStatusContractorScope
03/25/2025Signed-offPRIME PIPING & HEATING IN18 outlets
7 jobs · most recent 12/11/2025
General Wiring
FiledStatusContractorScope
12/11/2025CompletePOWER DIRECT ELECTRIC INC—
09/16/2025CompleteS&R ELECTRICAL & MECHANIC—
08/15/2025CompleteS&R ELECTRICAL & MECHANIC127 meters, 127 new_meters
03/12/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
03/08/2025CompleteSOLAS ELECTRICAL CORP—
01/15/2025CompleteSOLAS ELECTRICAL CORP—
04/03/2022CompleteV. VASS ELECTRIC CORP—
Building Lifecycle
All (100)Filed (17)Permit Issued (15)Signed Off (11)Violation (16)Inspection (6)Objection (26)Special Inspection (6)Tax Incentive (3)
03/30/2026
Signed off — Alteration
X00674048-I1
12/19/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-S2
12/19/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-S1
12/19/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-I1
11/24/2025
Signed off — Alteration
X00674093-I1
11/24/2025
Signed off — Alteration
X00273573-I1
11/13/2025
Signed off — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X00728070-I1
X00728070-S6
11/13/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/29/2025
Signed off — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X00728070-I1
X00728070-S1
09/17/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/17/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
08/15/2025
Signed off — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X00728070-I1
X00728070-S2
08/13/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/05/2025
421-a(16) construction completed
06/10/2025
Permit issued — Curb Cut
X00728070-S2-CC
06/10/2025
Violation issued (ECB, closed)
Construction
06/06/2025
Special inspection requirement — Post-installed Anchors
AKM RAHMAN
06/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
PAUL JONES
06/03/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)
Certified
View inspection ↗
05/29/2025
Inspection — Certified StandPipe - SD - Alarm Sys 64/09 - Finish
Certified
View inspection ↗
05/29/2025
Inspection — Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)
Certified
View inspection ↗
05/28/2025
Permit issued — Standpipe
X00728070-S6-EW-SD
05/15/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193259-I1
04/28/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-P2
04/21/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
PAUL JONES
04/21/2025
Special inspection requirement — Post-installed Anchors
RAFI HAMID
04/17/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-P1
04/08/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Violation issued (ECB, closed)
Construction
04/08/2025
Objection resolved — Addressed
04/08/2025
Objection resolved — Addressed
04/07/2025
Violation issued (ECB, closed)
Unknown
04/02/2025
Objection raised — Fire_Protection
04/02/2025
Objection raised — Fire_Protection
03/28/2025
Permit issued — Protection and Mechanical Methods
X01193259-I1-PMM
03/26/2025
Filed — Alteration
X01179915-I1
03/25/2025
Filed — Alteration
TEMPORARY STANDPIPE SPECIFICATIONS FILED IN CONJUNCTION WITH GC APPLICATION X00728070-I1
X00728070-S6
03/19/2025
Objection resolved — Addressed
03/18/2025
Objection raised — Other
03/17/2025
Permit issued — Protection and Mechanical Methods
X01166628-S1-PMM
03/11/2025
Filed — Alteration
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X01193259-I1
03/10/2025
Objection resolved — Addressed
03/07/2025
Permit issued — Protection and Mechanical Methods
X01166628-S2-PMM
02/24/2025
Objection resolved — Addressed
02/14/2025
Violation issued (ECB, closed)
Construction
02/14/2025
Violation issued (ECB, closed)
Unknown
02/14/2025
Violation issued (ECB, closed)
Construction
02/05/2025
Permit issued — Supported Scaffold
X01166628-I1-SF
02/05/2025
Permit issued — Sidewalk Shed
X01166628-I1-SH
02/03/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Other
01/27/2025
Objection raised — Inspections
01/24/2025
Objection raised — Other
01/16/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-S2
01/16/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-S1
01/16/2025
Filed — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01166628-I1
11/14/2024
Permit issued — Construction Fence
X00728070-S1-FN
08/29/2024
421-a(16) registration filed
08/26/2024
Violation issued (ECB, closed)
Construction
08/26/2024
Violation issued (ECB, closed)
Construction
Latest 60 of 100 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MINT DEVELOPMENT1304/09/2026
CONSOLIDATED SCAFFOLDING INC.1504/09/2026
RUBIN EQUITIES2004/09/2026
OWNERS REP604/09/2026
ON STAR MANAGEMENT403/22/2026
MANAGEMENT LLC ON STAR303/22/2026
TARGET CONSTRUCTION103/22/2026
KMI203/21/2026
286 RIDER AVE ACQUISITION LLC503/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/19/2019$10.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES303/21/2026
AE DESIGN SOLUTION603/21/2026
EXPRESS FILING INC603/21/2026
HIERARCH-E203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MINT DEVELOPMENT CORPGeneral Contractor507/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor404/09/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor204/09/2026
ON STAR MANAGEMENT LLCGeneral Contractor204/09/2026
POWER DIRECT ELECTRIC INCElectrical103/22/2026
XOLLE DEMO LLCGeneral Contractor104/09/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
S&R ELECTRICAL & MECHANICElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYED ENGINEERING, P.C.7054104/28/2025
HRF SERVICES CORP5616403/25/2025
ASR ENGINEERING PC8404101/16/2025
BIG APPLE GROUP NY A RMA9168102/08/2022
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offON STAR MANAGEMENT LLC06/10/2025
DOB NOWStandpipeSigned-offA M B MECHANICAL INC05/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC03/28/2025
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING03/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offCONSOLIDATED SCAFFOLDING03/07/2025
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING02/05/2025
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING02/05/2025
DOB NOWConstruction FenceSigned-offON STAR MANAGEMENT LLC11/14/2024
DOB NOWFoundationSigned-offMINT DEVELOPMENT CORP03/15/2024
DOB NOWConstruction FenceSigned-offMINT DEVELOPMENT CORP03/08/2024
DOB NOWSupport of ExcavationSigned-offMINT DEVELOPMENT CORP03/07/2024
DOB NOWEarth WorkSigned-offMINT DEVELOPMENT CORP05/02/2022
DOB NOWSupport of ExcavationSigned-offMINT DEVELOPMENT CORP05/02/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC04/04/2022
DOB NOWConstruction FenceSigned-offXOLLE DEMO LLC02/09/2022
BISPLISSUEDA. M. PLUMBING COMPANY12/10/2024
BIS—ISSUEDON STAR MANAGEMENT LLC11/19/2024
BIS—ISSUEDON STAR MANAGEMENT LLC11/19/2024
BIS—ISSUEDXOLLE DEMO LLC12/13/2022
BIS—ISSUEDXOLLE DEMO LLC10/11/2022
BIS—ISSUEDXOLLE DEMO LLC03/11/2022
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
09/17/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/17/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
08/13/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/03/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
05/29/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
05/29/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
06/06/2025Post-installed AnchorsAKM RAHMANspecial
06/06/2025Alternative Materials - OTCR Buildings Bulletin NumberPAUL JONESspecial
04/21/2025Alternative Materials - OTCR Buildings Bulletin NumberPAUL JONESspecial
04/21/2025Post-installed AnchorsRAFI HAMIDspecial
04/29/2022FinalFAHAD FATEHprogress
04/28/2022Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
▾Documents — 279 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch15
08/24/2026X00674093-I1Request digital key ↗
08/24/2026X00674048-I1Request digital key ↗
08/24/2026X00707973-I1Request digital key ↗
Showing 3 of 15 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00273573-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/26/2026X00225410-I1Request digital key ↗
▸Applications & Permits55
▸BISPLAN / WORK APPROVAL APPLICATION44
12/18/2025220707929Open ↗
11/06/2025240263914Open ↗
10/28/2025220707929Open ↗
Showing 3 of 44 on file for this type
▸BISWORK PERMIT APPLICATION11
09/16/2025220707929Open ↗
09/16/2025220707929Open ↗
05/01/2025220707929Open ↗
Showing 3 of 11 on file for this type
▸Zoning, Tax Lot & Property Records5
▸BISZONING DIAGRAM2
04/25/2025220707929Open ↗
03/25/2022220707929Open ↗
▸BISVERIFY TAX LOT1
07/21/2025220707929Open ↗
▸BISFLOOD ZONE COMPLIANCE1
10/22/2025220707929Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
07/28/2025220707929Open ↗
▸Seals & Professional Certifications24
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/24/2026X00674093-I1Open ↗
08/24/2026X00674048-I1Open ↗
08/24/2026X00707973-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/06/2026X01166628-I1Open ↗
09/06/2026X01166628-I1Open ↗
09/01/2026X01166628-P2Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProgress Inspector Seal & Signature1
08/23/2026X00728070-I1Open ↗
▸Trade Schedules & Equipment19
▸BISSCHEDULE B - PLUMBING14
10/28/2025220707929Open ↗
10/24/2025220707929Open ↗
07/03/2025220707929Open ↗
Showing 3 of 14 on file for this type
▸BISGAS CUT-OFF1
03/18/2022220690063Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
10/22/2025220707929Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
10/22/2025220707929Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSPRINKLER SYSTEMS1
10/22/2025220707929Open ↗
▸Safety & Tenant Protection12
▸BISSTREET TREE CHECKLIST4
08/20/2024240359875Open ↗
08/16/2024220707929Open ↗
03/25/2022220707929Open ↗
Showing 3 of 4 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE3
12/15/2022220690063Open ↗
10/13/2022220690063Open ↗
03/18/2022220690063Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING2
10/22/2025220707929Open ↗
10/22/2025220707929Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
03/18/2022220690063Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
11/14/2024220707929Open ↗
▸BISBPP: STREET TREES SITE PLAN1
08/20/2024240359875Open ↗
▸Environmental & Asbestos13
▸DOB NOWOER: Notice to Proceed5
08/13/2026X00273573-I1Open ↗
08/13/2026X00674093-I1Open ↗
08/13/2026X00728070-I1Open ↗
Showing 3 of 5 on file for this type
▸BISRODENT CONTROL3
12/15/2022220690063Open ↗
10/13/2022220690063Open ↗
03/18/2022220690063Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE OF SATISFACTION2
11/24/2025240359875Open ↗
10/27/2025220707929Open ↗
▸BISPROVIDE OER NOTICE TO PROCEED PRIOR TOPERMIT.1
11/01/2024220707929Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
08/20/2024240359875Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/24/2026X00674048-I1Open ↗
▸Energy Compliance9
▸BISAIR SEALING AND INSULATION - VISUAL1
10/22/2025220707929Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
03/25/2022220707929Open ↗
▸BISINTERIOR LIGHTING POWER1
10/22/2025220707929Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
10/22/2025220707929Open ↗
▸BISFENESTRATION AREAS1
10/22/2025220707929Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
10/22/2025220707929Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
10/22/2025220707929Open ↗
▸BISLIGHTING IN DWELLING UNITS1
10/22/2025220707929Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
10/22/2025220707929Open ↗
▸Inspections & Test Reports23
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/13/2024220707929Open ↗
03/03/2022220707929Open ↗
03/03/2022220707929Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION2
09/13/2024220707929Open ↗
03/03/2022220707929Open ↗
▸BISSTRUCTURAL STEEL - DETAILS2
10/22/2025220707929Open ↗
10/22/2025220707929Open ↗
▸DOB NOWTR4 Plot Diagram2
08/13/2026X00674093-I1Open ↗
08/13/2026X00674048-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026X00674093-I1Open ↗
08/13/2026X00674048-I1Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026X00674093-I1Open ↗
08/13/2026X00674048-I1Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
10/22/2025220707929Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/14/2024220707929Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
03/03/2022220707929Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
11/14/2024220707929Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/22/2025220707929Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
10/22/2025220707929Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
10/22/2025220707929Open ↗
▸BISMASONRY1
10/22/2025220707929Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
10/22/2025220707929Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
10/22/2025220707929Open ↗
▸Approvals, Objections & Sign-offs35
▸BISLETTERS - SUPPORTING DOCUMENTATION16
04/03/2025220707929Open ↗
04/03/2025220707929Open ↗
08/16/2024220707929Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE15
12/18/2025220707929Open ↗
09/26/2025220707929Open ↗
09/16/2025220707929Open ↗
Showing 3 of 15 on file for this type
▸BISSUPERSEDING LETTER3
09/16/2025220707929Open ↗
09/16/2025220707929Open ↗
09/13/2024220707929Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/18/2022220690063Open ↗
▸Cost, Insurance & Ownership6
▸BISPROJECT-SPECIFIC GL INSURANCE5
11/26/2024220707929Open ↗
11/14/2024220707929Open ↗
12/15/2022220690063Open ↗
Showing 3 of 5 on file for this type
▸BISINSURANCE: LIABILITY1
11/14/2024220707929Open ↗
▸Filing & Intake Forms22
▸BISADDITIONAL INFORMATION12
11/24/2025220707929Open ↗
11/24/2025220707929Open ↗
08/26/2025220707929Open ↗
Showing 3 of 12 on file for this type
▸BISBOROUGH INTAKE FORM5
07/23/2025220690063Open ↗
12/15/2022220690063Open ↗
10/13/2022220690063Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWAI1 Form (from plan PDF)1
08/16/2026X00707973-P1Open ↗
▸Other Documents10
▸BISCOMMUNITY BOARD NOTIFICATION3
12/15/2022220690063Open ↗
10/13/2022220690063Open ↗
03/18/2022220690063Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026X00674048-I1Open ↗
08/13/2026X00674093-I1Open ↗
▸BISSHUTOFF DAMPERS1
10/22/2025220707929Open ↗
▸BISLOWEST FLOOR ELEVATION1
10/22/2025220707929Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)1
10/22/2025220707929Open ↗
▸BISVESTIBULES1
10/22/2025220707929Open ↗
▸BISMAINTENANCE INFORMATION1
10/22/2025220707929Open ↗