2863 SCHURZ AVENUE
BRONX · BIN 2130652
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralFire ProtectionGeneral
Floor 25p · 2 filings · 20 docs
Floor 15p · 1 filing · 20 docs
Basement3p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GINO O. LONGO, ARCHITECT601/27/2025
SIDERIS KEFALAS ENGINEERS PC104/26/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
STACIE SCORCIA COMPANY403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJ GENERAL MECHANICAL LLCPlumbing507/08/2026
D.P. GROUP GENERAL CONTRAGeneral Contractor204/09/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
VIBRANALYSIS INC., DBA VT6864501/27/2025
Building Lifecycle
All (82)Filed (7)Permit Issued (7)Signed Off (3)Inspection (11)Objection (24)Special Inspection (30)
05/21/2025
Signed off — Alteration
INSTALLATION OF SPRINKLER SYSTEM (WITH LESS THAN 30 HEADS) FOR NEW 2-FAMILY BUILDING. FILED IN CONJUNCTION WITH NEW BUILDING #X00575788.
X00723435-I1
04/16/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
02/11/2025
Signed off — New Building
PROPOSED 3 STORY 2 FAMILY DWELLING
X00575788-S1
02/05/2025
Special inspection requirement — Maintenance information
JUAN GOMEZ
02/05/2025
Special inspection requirement — Concrete - Cast-In-Place
JUAN GOMEZ
02/05/2025
Special inspection requirement — Heating Systems
JUAN GOMEZ
02/05/2025
Special inspection requirement — Wood – Prefabricated I-Joists
JUAN GOMEZ
02/05/2025
Special inspection requirement — Structural Steel - Details
JUAN GOMEZ
02/05/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
02/05/2025
Special inspection requirement — Mechanical Systems
JUAN GOMEZ
02/05/2025
Special inspection requirement — Masonry
JUAN GOMEZ
02/05/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
JUAN GOMEZ
02/05/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
JUAN GOMEZ
02/05/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
JUAN GOMEZ
02/05/2025
Special inspection requirement — Footing and Foundation
JUAN GOMEZ
02/05/2025
Special inspection requirement — Fire-Resistance Rated Construction
JUAN GOMEZ
02/05/2025
Special inspection requirement — Final
JUAN GOMEZ
02/05/2025
Special inspection requirement — Energy Code Compliance Inspections
JUAN GOMEZ
02/05/2025
Special inspection requirement — Structural Wood Frame
JUAN GOMEZ
02/05/2025
Special inspection requirement — Fenestration areas
JUAN GOMEZ
02/05/2025
Special inspection requirement — Insulation placement and R values
JUAN GOMEZ
02/05/2025
Special inspection requirement — Air barrier - visual inspection
JUAN GOMEZ
02/05/2025
Special inspection requirement — Air barrier — testing
JUAN GOMEZ
02/05/2025
Special inspection requirement — Protection of exposed foundation insulation
JUAN GOMEZ
02/05/2025
Special inspection requirement — Fireplaces
JUAN GOMEZ
02/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
JUAN GOMEZ
02/05/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
JUAN GOMEZ
02/05/2025
Special inspection requirement — HVAC-R and service water heating system controls
JUAN GOMEZ
02/05/2025
Special inspection requirement — Metering
JUAN GOMEZ
02/05/2025
Special inspection requirement — HVAC-R and service water heating equipment
JUAN GOMEZ
02/05/2025
Special inspection requirement — Permanent certificate
JUAN GOMEZ
02/05/2025
Special inspection requirement — Electric vehicle service equipment requirements
JUAN GOMEZ
02/05/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
JUAN GOMEZ
01/30/2025
Objection resolved — Addressed
01/29/2025
Objection raised — Other
01/27/2025
Filed — New Building
PROPOSED 3 STORY 2 FAMILY DWELLING
X00575788-P4
10/04/2024
Inspection — Certified Sprinkler (PL)-SP-Fixtures (PL)-Finish
Certified
View inspection ↗
10/01/2024
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
10/01/2024
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
10/01/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/05/2024
Permit issued — Plumbing
X00723435-I1-PL
05/06/2024
Permit issued — Plumbing
X00723435-I1-PL
02/23/2024
Permit issued — Plumbing
X00575788-S1-PL
12/18/2023
Signed off — Alteration
PROPOSED 17'-0" CURB CUT FILED IN CONJUNCTION WITH NB X00575788
X00620581-I1
12/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
10/27/2023
Permit issued — Curb Cut
X00620581-I1-CC
07/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/08/2023
Filed — New Building
PROPOSED 3 STORY 2 FAMILY DWELLING
X00575788-P1
05/31/2023
Filed — New Building
PROPOSED 3 STORY 2 FAMILY DWELLING
X00575788-P3
03/22/2023
Filed — Alteration
PROPOSED 17'-0" CURB CUT FILED IN CONJUNCTION WITH NB X00575788
X00620581-I1
10/28/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/28/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/06/2022
Permit issued — Plumbing
X00723435-I1-PL
09/20/2022
Permit issued — Plumbing
X00575788-S1-PL
05/11/2022
Filed — New Building
PROPOSED 3 STORY 2 FAMILY DWELLING
X00575788-S1
05/06/2022
Objection raised — Other
05/06/2022
Objection resolved — Addressed
05/05/2022
Permit issued — Foundation
X00575788-I1-GC-CX
Latest 60 of 82 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC09/05/2024
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC05/06/2024
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC02/23/2024
DOB NOWCurb CutSigned-offD.P. GROUP GENERAL CONTRA10/27/2023
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC10/06/2022
DOB NOWPlumbingSigned-offMJ GENERAL MECHANICAL LLC09/20/2022
DOB NOWFoundationPermit IssuedD.P. GROUP GENERAL CONTRA05/05/2022
1 project · most recent 01/27/2025
Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
01/27/2025Permit IssuedD.P. GROUP GENERAL CONTRAHeating Systems, Ventilation Systems
Heating
King KFS2015-1-2S1-ECM 51,195 BTU · Furnace ×6
Ventilation
Broan-Nutone HB80RL 50 CFM · Exhaust Fan ×2
1 project · most recent 01/27/2025
Storm Water/Sanitary
FiledStatusContractorScope
01/27/2025Signed-offMJ GENERAL MECHANICAL LLCStorm, Water/Sanitary
1 project · most recent 08/17/2022
General Wiring
FiledStatusContractorScope
08/17/2022CompleteBAYSIDE ELEC'L CONT. CORPGeneral Wiring
1 project · most recent 01/27/2025
Wood
FiledStatusContractorScope
01/27/2025Signed-offMJ GENERAL MECHANICAL LLCWood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
04/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/04/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
10/01/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
10/01/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
10/01/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
07/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/28/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/28/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 100
DateRequirementInspectorRole
02/05/2025HVAC-R and service water piping design and insulationJUAN GOMEZenergy_progress
02/05/2025Maintenance informationJUAN GOMEZenergy_progress
02/05/2025Concrete - Cast-In-PlaceJUAN GOMEZspecial
02/05/2025Heating SystemsJUAN GOMEZspecial
02/05/2025Wood – Prefabricated I-JoistsJUAN GOMEZspecial
02/05/2025Structural Steel - DetailsJUAN GOMEZspecial
02/05/2025Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
02/05/2025Mechanical SystemsJUAN GOMEZspecial
02/05/2025MasonryJUAN GOMEZspecial
02/05/2025Exterior Insulation and Finish Systems (EIFS)JUAN GOMEZspecial
02/05/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationJUAN GOMEZspecial
02/05/2025Fire-Resistant Penetrations and JointsJUAN GOMEZspecial
02/05/2025Footing and FoundationJUAN GOMEZprogress
02/05/2025Fire-Resistance Rated ConstructionJUAN GOMEZprogress
02/05/2025FinalJUAN GOMEZprogress
02/05/2025Energy Code Compliance InspectionsJUAN GOMEZprogress
02/05/2025Structural Wood FrameJUAN GOMEZprogress
02/05/2025Fenestration areasJUAN GOMEZenergy_progress
02/05/2025Insulation placement and R valuesJUAN GOMEZenergy_progress
02/05/2025Air barrier - visual inspectionJUAN GOMEZenergy_progress
02/05/2025Air barrier — testing JUAN GOMEZenergy_progress
02/05/2025Protection of exposed foundation insulationJUAN GOMEZenergy_progress
02/05/2025FireplacesJUAN GOMEZenergy_progress
02/05/2025Duct leakage testing, insulation and designJUAN GOMEZenergy_progress
02/05/2025Fenestration and door U-factor and product ratingsJUAN GOMEZenergy_progress
Latest 25 of 100.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/24/2026X00575788-S1Request digital key ↗
08/24/2026X00575788-P1Request digital key ↗
08/24/2026X00575788-P3Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records7
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026X00575788-P1Open ↗
08/13/2026X00575788-P4Open ↗
08/13/2026X00575788-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026X00575788-P4Open ↗
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026X00575788-I1Open ↗
▸Seals & Professional Certifications106
▸DOB NOWProgress Inspector Seal & Signature69
09/29/2026X00575788-P1Open ↗
09/29/2026X00575788-P1Open ↗
09/29/2026X00575788-P1Open ↗
Showing 3 of 69 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature30
09/29/2026X00575788-P1Open ↗
09/29/2026X00575788-P1Open ↗
09/29/2026X00575788-P1Open ↗
Showing 3 of 30 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/24/2026X00723435-I1Open ↗
08/24/2026X00575788-I1Open ↗
08/24/2026X00575788-S1Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment4
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)3
08/13/2026X00575788-P4Open ↗
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P1Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/13/2026X00575788-I1—
▸Safety & Tenant Protection6
▸DOB NOWStreet Tree Checklist3
08/13/2026X00575788-P1Open ↗
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P4Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026X00575788-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026X00575788-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026X00575788-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00575788-S1Open ↗
08/13/2026X00575788-I1Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT3
08/13/2026X00575788-P4Open ↗
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026X00575788-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026X00575788-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P1Open ↗
08/13/2026X00575788-P4Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026X00575788-I1Open ↗
08/13/2026X00575788-P4Open ↗
08/13/2026X00575788-P1Open ↗
▸DOB NOWLowest Floor Elevation Plan1
08/15/2026X00575788-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026X00575788-I1Open ↗