Parochial school, yeshiva
2865 CLAFLIN AVENUE
BRONX · BIN 2086833
💬 Discuss this project
1928Year Built
4Stories
W2Building Class
R6Zoning
36,000 sfGross Floor Area
2Units
7 Active Violations 0 unresolved · 7 paperwork only 1 likely answered ▸
Parochial school, yeshiva · 34,500 sf lot · 1.04 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Floor 1P.S. 315 Lab SchoolUnder Construction9p · 1 filing · 20 docs
Site & exteriorP.S. 315 Lab School4p · 1 filing · 1 doc
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction Authority1307/10/2026
Roman Catholic Church of Our Lad203/21/2026
Our Lady of Angels RC Church103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Shenoy Engineering511/27/2024
Stantec102/22/2024
KZ Engineering110/16/2023
Stantec Architecture102/03/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Synergy Building Consultants103/21/2026
Stantec Architecture503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Shaheen ConstructionGeneral Contractor507/10/2026
Metropolitan Electric of NY IElectrical203/21/2026
Nash Electric ServicesElectrical103/21/2026
Charan Electrical Enterp'sElectrical103/22/2026
Thermo Tech Mechanical I*specialty_contractor107/08/2026
Arsenal ScaffoldScaffold107/08/2026
Varsity Plumbing and HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Future Tech Consultants O589611/27/2024
Socotec Engineering4983104/04/2023
Building Lifecycle
All (73)Filed (8)Permit Issued (6)Signed Off (1)Violation (34)Inspection (1)Objection (8)Special Inspection (15)
07/08/2026
Permit issued — General Construction
X00823725-I1-GC
03/19/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/03/2025
Permit issued — General Construction
X00823725-I1-GC
12/18/2024
Special inspection requirement — Mechanical Systems
Noel Tolentino
12/18/2024
Special inspection requirement — Final
Noel Tolentino
12/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
11/27/2024
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-P4
11/27/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
11/27/2024
Special inspection requirement — Mechanical Systems
Noel Tolentino
11/27/2024
Special inspection requirement — Final
Michael Marchese
04/30/2024
Permit issued — Plumbing
X00823725-S1-PL
04/01/2024
Permit issued — Mechanical Systems
X00823725-S2-MS
03/28/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
03/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
03/25/2024
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-P3
03/25/2024
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-P2
03/20/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
03/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
03/20/2024
Special inspection requirement — Mechanical Systems
Noel Tolentino
03/20/2024
Special inspection requirement — Post-installed Anchors
Noel Tolentino
03/20/2024
Special inspection requirement — Final
Michael Marchese
03/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
03/08/2024
Permit issued — General Construction
X00823725-I1-GC
03/08/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Noel Tolentino
03/04/2024
Objection resolved — Addressed
02/23/2024
Objection raised — Other
02/22/2024
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-P1
12/11/2023
Signed off — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00943961-I1
10/16/2023
Filed — Alteration
Installation of temporary heavy duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
X00943961-I1
10/16/2023
Permit issued — Sidewalk Shed
X00943961-I1-SH
04/10/2023
Objection raised — Other
04/10/2023
Objection resolved — Addressed
04/04/2023
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-S2
02/16/2023
Objection raised — Other
02/16/2023
Objection resolved — Addressed
02/10/2023
Objection raised — Other
02/10/2023
Objection resolved — Addressed
02/08/2023
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-S1
02/03/2023
Filed — Alteration
Provide one (1) new Drinking fountains in Gymnatorium with new at height as shown on Architectural Drawings.
X00823725-I1
02/28/2020
Violation issued (ECB, closed)
Construction
09/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/11/2018
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/15/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/24/2017
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/24/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/2016
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/03/2015
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/31/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/16/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/08/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/03/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
09/29/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
01/03/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/15/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/05/2005
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/07/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
02/19/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 73 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedShaheen Construction07/08/2026
DOB NOWGeneral ConstructionPermit IssuedShaheen Construction03/03/2025
DOB NOWPlumbingPermit IssuedVarsity Plumbing and Heating04/30/2024
DOB NOWMechanical SystemsPermit IssuedThermo Tech Mechanical I*04/01/2024
DOB NOWGeneral ConstructionPermit IssuedShaheen Construction03/08/2024
DOB NOWSidewalk ShedSigned-offArsenal Scaffold10/16/2023
BISPLISSUEDMar-Sal Plumbing & Heating05/10/2018
BISMHISSUEDACS System Associates04/18/2017
BISOTISSUEDAshnu International03/15/2017
BISOTISSUEDAshnu International03/15/2017
BISEQISSUEDAshnu International12/08/2016
BISBLISSUEDCrossfield Plumbing & Heating08/08/2016
BISPLISSUEDCrossfield Plumbing & Heating08/08/2016
BISPLISSUEDMar-Sal Plumbing & Heating07/12/2016
BISOTISSUEDAshnu International03/18/2016
BISOTISSUEDAshnu International03/18/2016
BISMHISSUEDACS System Associates03/14/2016
BISOTISSUEDAshnu International12/08/2015
BISOTISSUEDAshnu International12/08/2015
BISEQISSUEDAshnu International12/04/2015
BISBLISSUEDCrossfield Plumbing & Heating07/13/2015
BISPLISSUEDCrossfield Plumbing & Heating07/02/2015
BISPLISSUEDMar-Sal Plumbing & Heating06/22/2015
BISOTISSUEDAshnu International06/22/2015
BISOTRE-ISSUEDAshnu International06/22/2015
BISMHISSUEDACS System Associates06/22/2015
BISOTISSUEDMC Construction Consulting11/10/2014
BISEQISSUEDIntersystem S&S09/27/2014
BISEQISSUEDIntersystem S&S09/17/2014
BISBLISSUEDCrossfield Plumbing & Heating07/15/2014
BISPLRE-ISSUEDCrossfield Plumbing & Heating07/07/2014
BISEQISSUEDIntersystems06/27/2014
BISEQISSUEDIntersystems06/26/2014
BISOTISSUEDMC Construction Consulting06/16/2014
1 project · most recent 11/27/2024
Water/Sanitary
FiledStatusContractorScope
11/27/2024Permit IssuedVarsity Plumbing and HeatingWater/Sanitary
11 projects · most recent 05/18/2026
General Wiring
FiledStatusContractorScope
05/18/2026CompleteAnco Electl Contctng—
12/12/2024CompleteAnco Electl Contctng—
03/08/2024CompleteMetropolitan Electric of NY IGeneral Wiring
10/16/2023CompleteNash Electric Services—
03/09/2023CompleteCharan Electrical Enterp's—
03/24/2022CompleteCharan Electrical Enterp's—
02/10/2021CompleteAbm Electric—
08/05/2020CompleteCharan Electrical Enterp's—
02/05/2020CompleteCharan Electrical Enterp's—
12/03/2019CompleteCharan Electrical Enterp's—
12/06/2018CompleteCharan Electrical Enterp's—
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/19/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
12/18/2024Mechanical SystemsNoel Tolentinospecial
12/18/2024FinalNoel Tolentinoprogress
12/18/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
11/27/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
11/27/2024Mechanical SystemsNoel Tolentinospecial
11/27/2024FinalMichael Marcheseprogress
03/28/2024Post-installed AnchorsNoel Tolentinospecial
03/28/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/20/2024Post-installed AnchorsNoel Tolentinospecial
03/20/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/20/2024Mechanical SystemsNoel Tolentinospecial
03/20/2024Post-installed AnchorsNoel Tolentinospecial
03/20/2024FinalMichael Marcheseprogress
03/20/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
03/08/2024Fire-Resistant Penetrations and JointsNoel Tolentinospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 315 Lab SchoolEducationFloor 1
Project X00943961 Alteration · LOC Issued · 10/16/2023
Project X00823725 Alteration · Permit Entire · 02/03/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 298 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/22/2026X00943961-I1Request digital key ↗
08/21/2026X00823725-P3Request digital key ↗
08/21/2026X00823725-P4Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits68
▸BISPLAN / WORK APPROVAL APPLICATION26
10/15/2025220559036Open ↗
10/03/2025220559036Open ↗
08/20/2025220559036Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION22
11/28/2018220389363Open ↗
04/04/2017220389292Open ↗
04/04/2017220389292Open ↗
Showing 3 of 22 on file for this type
▸BISPLACE OF ASSEMBLY18
10/29/2025220559036Open ↗
10/22/2025220559036Open ↗
10/15/2025220559036Open ↗
Showing 3 of 18 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
12/11/2018220389292Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
10/02/2023220401287Open ↗
▸Seals & Professional Certifications83
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION53
04/11/2019220389363Open ↗
04/11/2019220389363Open ↗
03/07/2018220389292Open ↗
Showing 3 of 53 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026X00823725-P2Open ↗
08/21/2026X00823725-S2Open ↗
08/21/2026X00823725-S1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/02/2026X00823725-P4Open ↗
08/30/2026X00823725-S1Open ↗
08/25/2026X00823725-S2Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
11/10/2015240122728Open ↗
06/27/2014240062711Open ↗
Showing 2 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
11/10/2015240122728Open ↗
06/27/2014240062711Open ↗
Showing 2 of 3 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
11/10/2015240122728Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026X00823725-P4Open ↗
08/25/2026X00823725-S2Open ↗
08/22/2026X00823725-P2Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Trade Schedules & Equipment17
▸BISEQUIPMENT USE APPLICATION/PERMIT5
12/11/2018220389292Open ↗
12/11/2018220389292Open ↗
12/11/2018220389292Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE4
04/27/2017220389292Open ↗
08/24/2016220389292Open ↗
Showing 2 of 4 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
02/22/2017220389363Open ↗
07/01/2015220389363Open ↗
Showing 2 of 3 on file for this type
▸BISFA - FDNY APPROVAL : FD-FAA2
01/29/2019220401287Open ↗
07/26/2017220517073Open ↗
▸BISFIRE PROTECTION PLAN(FPP): FDNY APPROVAL2
07/26/2017220517073Open ↗
02/24/2016220517073Open ↗
▸BISEQUIPMENT USE PERMITS1
12/11/2018220389292Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/21/2026X00823725-P2Open ↗
08/21/2026X00823725-S2Open ↗
08/15/2026X00823725-S1Open ↗
Showing 3 of 7 on file for this type
▸BISDEP ASBESTOS PROJECT COMPLETION FORM5
03/08/2018220389292Open ↗
03/07/2018220389292Open ↗
03/07/2018220389292Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸Energy Compliance14
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/11/2019220389363Open ↗
11/03/2016220401287Open ↗
11/03/2016220401287Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
04/11/2019220389363Open ↗
10/30/2015220389372Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
10/25/2023220401287Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Inspections & Test Reports8
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
02/17/2017220389292Open ↗
05/18/2016220389292Open ↗
05/18/2016220389292Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
01/15/2016220389292Open ↗
06/22/2015220389292Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
06/27/2014240062711Open ↗
Showing 1 of 2 on file for this type
▸Approvals, Objections & Sign-offs30
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST15
11/15/2023220401287Open ↗
06/07/2021240122728Open ↗
04/11/2019220389363Open ↗
Showing 3 of 15 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/07/2021240122728Open ↗
06/02/2021240122728Open ↗
04/11/2019220389363Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter7
08/21/2026X00823725-P2Open ↗
08/21/2026X00823725-S2Open ↗
08/15/2026X00823725-S1Open ↗
Showing 3 of 7 on file for this type
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT9
11/13/2023220401287Open ↗
04/11/2019220389363Open ↗
04/27/2018220389292Open ↗
Showing 3 of 9 on file for this type
▸Filing & Intake Forms33
▸BISBOROUGH INTAKE FORM13
04/11/2019220389363Open ↗
04/10/2019220389363Open ↗
12/11/2018220389292Open ↗
Showing 3 of 13 on file for this type
▸BISADDITIONAL INFORMATION10
08/18/2017220389292Open ↗
04/14/2017220389292Open ↗
01/09/2017220389292Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET7
02/24/2016220517073Open ↗
08/13/2014220401287Open ↗
Showing 2 of 7 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET3
11/10/2015240122728Open ↗
Showing 1 of 3 on file for this type
▸Other Documents11
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal7
08/21/2026X00823725-P2Open ↗
08/21/2026X00823725-S2Open ↗
08/15/2026X00823725-S1Open ↗
Showing 3 of 7 on file for this type
▸BISFEE EXEMPTION DOCUMENTATION2
06/27/2014240062711Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWProof of Historic Building2
08/14/2026X00823725-I1Open ↗
08/13/2026X00823725-P1Open ↗