Walk-up apt, over six families with stores
287 EAST 169 STREET
BRONX · Mount Eden-Claremont (West) · BIN 2130445
💬 Discuss this project
2022Year Built
4.5Stories
C7Building Class
R7-1Zoning
8,824 sfGross Floor Area
13Units
Rent Stabilized3 Open Violations ▸
Walk-up apt, over six families with stores · Owner of record: SHG 169 LLC · 2,115 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof1p · 1 filing · 20 docs
Bulkhead5p · 3 filings · 20 docs
Penthouse3p · 2 filings · 18 docs
Floor 42p · 2 filings · 19 docs
Floor 34p · 3 filings · 20 docs
Floor 23p · 2 filings · 20 docs
Floor 14p · 4 filings · 20 docs
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1407/08/2026
AFS SYSTEMS3207/08/2026
SHG 1692203/22/2026
TARGET CONSTRUCTION503/22/2026
1241 JEROME AVE REALTY CO203/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
04/10/2019$550K—285-7 E. 169 ST. REALTY CORP. → SHG 169 LLC— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SPEEDY EXPEDITING1203/21/2026
ADVANCED BUILDERS SERVICES403/21/2026
AE DESIGN SOLUTION1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TARGET CONSTRUCTION LLCGeneral Contractor707/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor607/08/2026
YOSEF BLAUElectrical503/21/2026
S R ELECTRICAL MECHANIC 005147General Contractor503/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
DIEGO B AGUILERA ARCHITECTS P CGeneral Contractor103/22/2026
DIEGO B AGUILERAElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BIG APPLE GROUP NY A RMA9168808/30/2023
Building Lifecycle
All (126)Filed (19)Permit Issued (10)Signed Off (9)Violation (23)Inspection (7)Objection (28)Special Inspection (30)
11/17/2025
Violation issued (HPD, closed)
I
06/16/2025
Violation issued (HPD, closed)
A
11/06/2023
Signed off — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB.
X00281015-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/29/2023
Signed off — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH NB & TO EXTEND ADJACENT CHIMNEY
X00280936-I1
09/08/2023
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
09/08/2023
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
09/08/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
09/08/2023
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
09/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
09/08/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
09/08/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
09/08/2023
Special inspection requirement — Final
Soorjbally Harilall
09/08/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
09/05/2023
Objection resolved — Addressed
09/03/2023
Objection raised — Scope
08/30/2023
Filed — Alteration
MECHANICAL WORK FILED IN CONJUNCTION WITH NB & TO EXTEND ADJACENT CHIMNEY
X00280936-P1
07/13/2023
Signed off — Alteration
STRUCTURAL SPECIFICATIONS FILED IN CONJUNCTION WITH NB # 220721413
X00281276-I1
07/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FILED IN CONJUNCTION WITH NB JOB # 220721413 & 220721404
X00186674-I1
07/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00789520-I1
07/06/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00792111-I1
07/04/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00788765-I1
07/04/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00788758-I1
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/2023
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00792111-P1
06/29/2023
Signed off — Alteration
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB.
X00281310-I1
06/29/2023
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00789520-P2
06/22/2023
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/22/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/22/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
06/20/2023
Filed — Alteration
PLUMBING SPECIFICATIONS FILED IN CONJUNCTION WITH NB.
X00281015-P2
06/19/2023
Filed — Alteration
SPRINKLER SPECIFICATIONS FILED IN CONJUNCTION WITH NB.
X00281310-P1
06/08/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/08/2023
Special inspection requirement — Sprinkler Systems
SOORJBALLY HARILALL
06/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
06/07/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
SOORJBALLY HARILALL
05/19/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/17/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/23/2023
Violation issued (ECB, closed)
Construction
03/23/2023
Violation issued (ECB, closed)
Construction
02/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/24/2023
Special inspection requirement — HVAC and service water heating system controls
Soorjbally Harilall
02/24/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SOORJBALLY HARILALL
02/24/2023
Special inspection requirement — Mechanical Systems
SOORJBALLY HARILALL
02/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Soorjbally Harilall
02/24/2023
Special inspection requirement — Final
Soorjbally Harilall
02/24/2023
Special inspection requirement — HVAC and service water heating equipment
Soorjbally Harilall
02/24/2023
Special inspection requirement — Shutoff dampers
Soorjbally Harilall
02/24/2023
Special inspection requirement — HVAC insulation and sealing
Soorjbally Harilall
02/24/2023
Special inspection requirement — Maintenance information
Soorjbally Harilall
02/23/2023
Permit issued — Mechanical Systems
X00280936-I1-MS
02/02/2023
Violation issued (ECB, closed)
Construction
02/02/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 126 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTARGET CONSTRUCTION LLC02/23/2023
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC12/16/2022
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC09/23/2022
DOB NOWSprinklersSigned-offA M B MECHANICAL INC09/20/2022
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN09/20/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/19/2022
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC08/15/2022
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC08/09/2022
DOB NOWStructuralSigned-offTARGET CONSTRUCTION LLC08/04/2022
DOB NOWConstruction FenceSigned-offTARGET CONSTRUCTION LLC10/07/2021
BIS—ISSUEDTARGET CONSTRUCTION LLC05/31/2023
BIS—ISSUEDTARGET CONSTRUCTION LLC05/27/2022
BIS—ISSUEDTARGET CONSTRUCTION LLC05/27/2022
3 projects · most recent 10/11/2023
General Wiring
FiledStatusContractorScope
10/11/2023CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
01/17/2023CompleteS&R ELECTRICAL & MECHANIC—
08/08/2022CompleteSOLAS ELECTRICAL CORP—
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
06/22/2023Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
06/22/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/19/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/17/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/01/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
02/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/03/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
09/08/2023HVAC insulation and sealing Soorjbally Harilallenergy_progress
09/08/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
09/08/2023Maintenance informationSoorjbally Harilallenergy_progress
09/08/2023HVAC and service water heating equipment Soorjbally Harilallenergy_progress
09/08/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
09/08/2023Mechanical SystemsSOORJBALLY HARILALLspecial
09/08/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
09/08/2023FinalSoorjbally Harilallprogress
09/08/2023Shutoff dampersSoorjbally Harilallenergy_progress
06/22/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/22/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
06/08/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/08/2023Sprinkler SystemsSOORJBALLY HARILALLspecial
06/07/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
06/07/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationSOORJBALLY HARILALLspecial
02/24/2023HVAC and service water heating system controls Soorjbally Harilallenergy_progress
02/24/2023Fire-Resistant Penetrations and JointsSOORJBALLY HARILALLspecial
02/24/2023Mechanical SystemsSOORJBALLY HARILALLspecial
02/24/2023Energy Code Compliance InspectionsSoorjbally Harilallprogress
02/24/2023FinalSoorjbally Harilallprogress
02/24/2023HVAC and service water heating equipment Soorjbally Harilallenergy_progress
02/24/2023Shutoff dampersSoorjbally Harilallenergy_progress
02/24/2023HVAC insulation and sealing Soorjbally Harilallenergy_progress
02/24/2023Maintenance informationSoorjbally Harilallenergy_progress
08/04/2022FinalSoorjbally Harilallprogress
Latest 25 of 38.
▾Documents — 188 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch9
08/24/2026X00792111-I1Request digital key ↗
08/24/2026X00792111-P1Request digital key ↗
08/23/2026X00788765-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing3
08/23/2026X00281015-I1Request digital key ↗
08/23/2026X00281015-P2Request digital key ↗
08/15/2026X00281015-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler2
08/23/2026X00281310-P1Request digital key ↗
08/15/2026X00281310-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural2
08/24/2026X00281276-P1Request digital key ↗
08/15/2026X00281276-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/26/2026X00186674-I1Request digital key ↗
▸Applications & Permits27
▸BISPLAN / WORK APPROVAL APPLICATION21
12/26/2023220721413Open ↗
12/26/2023220721413Open ↗
05/05/2023220721413Open ↗
Showing 3 of 21 on file for this type
▸BISWORK PERMIT APPLICATION4
06/02/2023220721413Open ↗
05/31/2022220721413Open ↗
05/31/2022220721413Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation1
06/27/2019220709776Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
06/08/2023220721413Open ↗
▸Zoning, Tax Lot & Property Records11
▸BISZONING EXHIBIT I: CERTIFICATION3
01/23/2020220721413Open ↗
12/05/2019220721413Open ↗
06/27/2019220709678Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT2
12/05/2019220721413Open ↗
06/27/2019220709678Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
05/14/2020220721413Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
12/05/2019220721413Open ↗
▸BISVERIFY TAX LOT1
07/17/2023220721413Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
05/14/2020220721413Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
01/22/2020220721413Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
06/08/2023220721413Open ↗
▸Seals & Professional Certifications54
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/24/2026X00281276-I1Open ↗
08/24/2026X00281276-P1Open ↗
08/24/2026X00792111-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature16
09/23/2026X00281276-P1Open ↗
08/30/2026X00281276-I1Open ↗
08/23/2026X00280936-P1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature12
09/23/2026X00281276-P1Open ↗
08/30/2026X00281015-P2Open ↗
08/30/2026X00281276-I1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
05/31/2022220721413Open ↗
12/05/2019220721413Open ↗
12/05/2019220721413Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
06/28/2019220709678Open ↗
06/27/2019220709678Open ↗
▸BIS* SEWER CONNECTION: DEP SD1 & SD21
05/07/2020220721413Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
07/06/2023220721413Open ↗
▸Safety & Tenant Protection9
▸BISSTREET TREE CHECKLIST5
06/09/2020220709776Open ↗
05/14/2020220721413Open ↗
12/05/2019220721413Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN2
05/31/2022220721413Open ↗
05/27/2022220721413Open ↗
▸BISSTREET TREE SIGNOFF1
12/18/2023220721413Open ↗
▸BISBPP: STREET TREES SITE PLAN1
06/09/2020220709776Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
07/13/2023220721413Open ↗
05/27/2022220721413Open ↗
05/14/2020220721413Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
05/31/2022220721413Open ↗
12/05/2019220721413Open ↗
06/27/2019220709678Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/13/2023220721413Open ↗
▸BISSOLAR PANEL CUT SHEETS1
08/18/2020220721413Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY5
07/13/2023220721413Open ↗
05/27/2022220721413Open ↗
08/24/2021220721413Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: SOIL INSPECTION4
05/14/2020220721413Open ↗
12/05/2019220721413Open ↗
06/27/2019220709678Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER3
01/03/2024220721413Open ↗
05/31/2022220721413Open ↗
05/27/2022220721413Open ↗
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
05/31/2022220721413Open ↗
05/27/2022220721413Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
01/03/2024220721413Open ↗
▸BISSOIL REPORT1
05/14/2020220721413Open ↗
▸Approvals, Objections & Sign-offs17
▸BISLETTERS - SUPPORTING DOCUMENTATION8
06/02/2023220721413Open ↗
06/02/2023220721413Open ↗
05/31/2022220721413Open ↗
Showing 3 of 8 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
06/28/2021220721413Open ↗
06/25/2021220721413Open ↗
08/19/2020220721413Open ↗
Showing 3 of 8 on file for this type
▸BISHOUSE CONNECTION SIGNOFF1
06/15/2023220721413Open ↗
▸Cost, Insurance & Ownership4
▸BISPROJECT-SPECIFIC GL INSURANCE3
06/02/2023220721413Open ↗
05/31/2022220721413Open ↗
05/27/2022220721413Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
05/27/2022220721413Open ↗
▸Filing & Intake Forms15
▸BISEFILING COVER SHEET8
12/05/2019220721413Open ↗
12/05/2019220721413Open ↗
06/27/2019220709678Open ↗
Showing 3 of 8 on file for this type
▸BISADDITIONAL INFORMATION4
01/03/2024220721413Open ↗
07/06/2023220721413Open ↗
05/12/2023220721413Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAI1 Form (from plan PDF)3
08/16/2026X00788758-P1Open ↗
08/16/2026X00789520-P1Open ↗
08/16/2026X00789520-P2Open ↗
▸Other Documents6
▸BISPLOT DIAGRAM3
05/14/2020220721413Open ↗
12/05/2019220721413Open ↗
06/28/2019220709678Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
05/07/2020220721413Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/09/2020220709776Open ↗
▸BISMAINTENANCE INFORMATION1
11/15/2023220721413Open ↗