← Back
Miscellaneous two family
287 GORDON STREET
STATEN ISLAND · BIN 5154578
💬 Discuss this project
2003Year Built
2Stories
B9Building Class
R3AZoning
1,280 sfGross Floor Area
2Units
Miscellaneous two family · 2,552 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 21p · 1 filing · 4 docs
Floor 12p · 1 filing · 4 docs
Cellar3p · 3 filings · 11 docs
Sub-Basement1p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SELA DEVELOPMENT203/21/2026
GIANNA BUILDERS103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
HPL ENGINEERING P.C.309/19/2023
HUQ ENGINEERING CONSULTANCY106/28/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM CONSULTANT STUDIO603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XH&RC PLBG AND HTG INCPlumbing207/08/2026
DIAN FA LIN INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HPL ENGINEERING PC5613209/19/2023
CL ENGINEERING P.C.6781106/28/2022
Building Lifecycle
All (39)Filed (4)Permit Issued (3)Signed Off (2)Inspection (5)Objection (22)Special Inspection (3)
03/01/2024
Signed off — Alteration
FILE PLUMBING WORK TO PERFORM GAS TEST AND GAS FINISH TO OBTAIN GAS AUTHORIZATION TO RESTORE GAS SERVICE, DUE TO UTILITY COMPANY SHUT OFF, FOR 2 EXISTING GAS METERS AT OSP. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00820373-I1
02/16/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/19/2023
Filed — Alteration
FILE PLUMBING WORK TO PERFORM GAS TEST AND GAS FINISH TO OBTAIN GAS AUTHORIZATION TO RESTORE GAS SERVICE, DUE TO UTILITY COMPANY SHUT OFF, FOR 2 EXISTING GAS METERS AT OSP. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00820373-P1
09/12/2023
Signed off — Alteration
Redo the plumbing work to cope with partially burnt house with fire.
S08007047-I1
09/11/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Fran Huang
08/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/20/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/31/2023
Permit issued — Plumbing
S08007047-I1-PL
02/22/2023
Permit issued — Plumbing
S00820373-I1-PL
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Scope
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Mechanical
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Inspections
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Fire_Protection
02/09/2023
Objection resolved — Addressed
02/09/2023
Objection raised — Admin
02/09/2023
Objection resolved — Addressed
02/01/2023
Filed — Alteration
FILE PLUMBING WORK TO PERFORM GAS TEST AND GAS FINISH TO OBTAIN GAS AUTHORIZATION TO RESTORE GAS SERVICE, DUE TO UTILITY COMPANY SHUT OFF, FOR 2 EXISTING GAS METERS AT OSP. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
S00820373-I1
11/21/2022
Permit issued — General Construction
S00760881-I1-GC
10/04/2022
Objection raised — Scope
10/04/2022
Objection resolved — Addressed
09/26/2022
Filed — Alteration
Redo the plumbing work to cope with partially burnt house with fire.
S08007047-I1
07/22/2022
Objection raised — Scope
07/22/2022
Objection resolved — Addressed
06/28/2022
Filed — Alteration
Floor, Wall, Ceiling re-finishing; Unify two parts of bathroom together; Contruction of a wooden terrace on rear side.
S00760881-I1
06/20/2022
Special inspection requirement — Post-installed Anchors
CHRISTIAN LOZADA
06/20/2022
Special inspection requirement — Final
MD Huq
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC03/31/2023
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC02/22/2023
DOB NOWGeneral ConstructionPermit IssuedDIAN FA LIN INC11/21/2022
BISPLISSUEDJ.P. COURY, INC.07/08/2003
BIS—ISSUEDGIANNA BUILDERS INC06/30/2003
1 project · most recent 09/26/2022
Gas Water/Sanitary
FiledStatusContractorScope
09/26/2022Signed-offXH&RC PLBG AND HTG INCGas, Water/Sanitary
1 project · most recent 11/28/2022
General Wiring
FiledStatusContractorScope
11/28/2022CompleteHV ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/16/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/20/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 3
DateRequirementInspectorRole
09/11/2023Fire-Resistant Penetrations and JointsFran Huangspecial
06/20/2022Post-installed AnchorsCHRISTIAN LOZADAspecial
06/20/2022FinalMD Huqprogress
▾Documents — 13 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/24/2026S08007047-S1Request digital key ↗
08/22/2026S00820373-P1Request digital key ↗
08/15/2026S00820373-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications8
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/24/2026S00760881-I1Open ↗
08/22/2026S00820373-I1Open ↗
08/13/2026S00820373-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026S00760881-I1Open ↗
08/24/2026S00820373-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/26/2026S00760881-I1Open ↗