← Back
Primarily 2 family with 1 store or office
2874 NOSTRAND AVENUE
BROOKLYN · BIN 3211293
💬 Discuss this project
1931Year Built
2Stories
S2Building Class
R6BZoning
2,540 sfGross Floor Area
3Units
Rent Stabilized59 Open Violations 58 unresolved · 1 paperwork only ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: S&I NY VENTURES LLC · 2,100 sf lot · 1.21 FAR built · Flood zone X
Locations of Work
Architecture
Floor 220p · 1 filing · 20 docs
Floor 120p · 1 filing · 20 docs
Cellar21p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
S&I NY VENTURES203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2023$1.0M—— → —$404/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SHENKER ARCHITECT, PC403/06/2026
STEEL CORE ENGINEERING PLLC103/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Shenker Architects403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DIMEX GROUP INCGeneral Contractor407/08/2026
CITY PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ENGINEERING PROFESSIONAL6393303/06/2026
STEEL CORE ENGINEERING PL1098103/27/2025
SHENKER ARCHITECT, PC756112/23/2024
Building Lifecycle
All (139)Filed (5)Permit Issued (4)Signed Off (3)Violation (60)Inspection (9)Objection (28)Special Inspection (30)
05/08/2026
Violation issued (ECB, open)
Construction
04/08/2026
Signed off — Alteration CO
CONVERT EXISTING MANUFACTURING USE AT 1ST FLOOR OF MIXED-USE BUILDING INTO CHILD DAY CARE FACILITY AND ADD MINOR HORIZONTAL EXTENSION AT REAR.
B01090562-I1
04/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
OLEG RUDITSER
04/06/2026
Special inspection requirement — Structural Cold-Formed Steel
OLEG RUDITSER
04/06/2026
Special inspection requirement — Masonry
OLEG RUDITSER
04/06/2026
Special inspection requirement — Structural Steel - Details
OLEG RUDITSER
04/06/2026
Special inspection requirement — Concrete - Cast-In-Place
OLEG RUDITSER
04/06/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
OLEG RUDITSER
04/06/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
OLEG RUDITSER
04/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
OLEG RUDITSER
04/06/2026
Special inspection requirement — Subgrade Inspections
OLEG RUDITSER
04/06/2026
Special inspection requirement — Final
OLEG RUDITSER
04/06/2026
Special inspection requirement — Footing and Foundation
OLEG RUDITSER
04/06/2026
Special inspection requirement — Energy Code Compliance Inspections
OLEG RUDITSER
04/06/2026
Special inspection requirement — Fire-Resistance Rated Construction
OLEG RUDITSER
04/06/2026
Special inspection requirement — Lighting controls
OLEG RUDITSER
04/06/2026
Special inspection requirement — Exterior lighting power
OLEG RUDITSER
04/06/2026
Special inspection requirement — Protection of exposed foundation insulation
OLEG RUDITSER
04/06/2026
Special inspection requirement — Metering
OLEG RUDITSER
04/06/2026
Special inspection requirement — Fenestration areas
OLEG RUDITSER
04/06/2026
Special inspection requirement — Fenestration air leakage
OLEG RUDITSER
04/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
OLEG RUDITSER
04/06/2026
Special inspection requirement — Interior lighting power
OLEG RUDITSER
04/06/2026
Special inspection requirement — Insulation placement and R values
OLEG RUDITSER
04/06/2026
Special inspection requirement — Air barrier - visual inspection
OLEG RUDITSER
03/06/2026
Filed — Alteration CO
CONVERT EXISTING MANUFACTURING USE AT 1ST FLOOR OF MIXED-USE BUILDING INTO CHILD DAY CARE FACILITY AND ADD MINOR HORIZONTAL EXTENSION AT REAR.
B01090562-P2
03/06/2026
Special inspection requirement — Air barrier - visual inspection
OLEG RUDITSER
03/06/2026
Special inspection requirement — Fenestration air leakage
OLEG RUDITSER
03/06/2026
Special inspection requirement — Exterior lighting power
OLEG RUDITSER
03/06/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
OLEG RUDITSER
03/06/2026
Special inspection requirement — Concrete - Cast-In-Place
OLEG RUDITSER
03/06/2026
Special inspection requirement — Construction Operations Influencing Adjacent Structures
OLEG RUDITSER
03/06/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
OLEG RUDITSER
01/30/2026
Filed — Alteration CO
CONVERT EXISTING MANUFACTURING USE AT 1ST FLOOR OF MIXED-USE BUILDING INTO CHILD DAY CARE FACILITY AND ADD MINOR HORIZONTAL EXTENSION AT REAR.
B01090562-P1
11/25/2025
Violation issued (HPD, open)
B
11/25/2025
Violation issued (HPD, open)
B
11/25/2025
Violation issued (HPD, open)
B
11/24/2025
Violation issued (HPD, open)
I
11/14/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/22/2025
Signed off — Alteration CO
CONVERT EXISTING MANUFACTURING USE AT 1ST FLOOR OF MIXED-USE BUILDING INTO CHILD DAY CARE FACILITY AND ADD MINOR HORIZONTAL EXTENSION AT REAR.
B01090562-S2
09/18/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/04/2025
Signed off — Alteration CO
CONVERT EXISTING MANUFACTURING USE AT 1ST FLOOR OF MIXED-USE BUILDING INTO CHILD DAY CARE FACILITY AND ADD MINOR HORIZONTAL EXTENSION AT REAR.
B01090562-S1
08/15/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (HPD, closed)
A
07/24/2025
Violation issued (HPD, closed)
A
07/24/2025
Violation issued (HPD, closed)
C
07/24/2025
Violation issued (HPD, closed)
C
07/24/2025
Violation issued (HPD, closed)
C
07/24/2025
Violation issued (HPD, open)
A
07/24/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (HPD, open)
B
07/24/2025
Violation issued (HPD, open)
A
07/24/2025
Violation issued (HPD, closed)
C
07/24/2025
Violation issued (HPD, open)
A
07/24/2025
Violation issued (HPD, open)
A
07/24/2025
Violation issued (HPD, open)
A
07/24/2025
Violation issued (HPD, open)
A
Latest 60 of 139 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offDIMEX GROUP INC07/08/2025
DOB NOWGeneral ConstructionPermit IssuedDIMEX GROUP INC05/06/2025
DOB NOWPlumbingSigned-offCITY PLUMBING INC01/14/2025
DOB NOWGeneral ConstructionPermit IssuedDIMEX GROUP INC12/24/2024
1 project · most recent 03/06/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
03/06/2026Signed-offDIMEX GROUP INCHeating and Air Conditioning Systems
Heat / Cool
Cooper & Hunter CH-36MES-230VO 36,000 BTU · Heat Pump Outdoor ×2
1 project · most recent 03/06/2026
Storm Water/Sanitary
FiledStatusContractorScope
03/06/2026Signed-offCITY PLUMBING INCStorm, Water/Sanitary
3 projects · most recent 01/22/2026
General Wiring
FiledStatusContractorScope
01/22/2026CompleteKINGS ELECTRIC CO., INC.3 meters, 2 new_meters
08/17/2025CompleteBLUE SEAGULL ELECTRICAL—
01/04/2025CompleteKINGS ELECTRIC CO., INC.General Wiring
1 project · most recent 03/06/2026
Steel Masonry
FiledStatusContractorScope
03/06/2026Signed-offDIMEX GROUP INCSteel, Masonry
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
09/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
08/15/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/16/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/16/2025Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/16/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/27/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/14/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/14/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 49
DateRequirementInspectorRole
04/06/2026Fire-Resistant Penetrations and JointsOLEG RUDITSERspecial
04/06/2026Structural Cold-Formed SteelOLEG RUDITSERspecial
04/06/2026MasonryOLEG RUDITSERspecial
04/06/2026Structural Steel - DetailsOLEG RUDITSERspecial
04/06/2026Concrete - Cast-In-PlaceOLEG RUDITSERspecial
04/06/2026Construction Operations Influencing Adjacent StructuresOLEG RUDITSERspecial
04/06/2026Structural Stability – Alterations of existing buildingsOLEG RUDITSERspecial
04/06/2026Exterior Insulation and Finish Systems (EIFS)OLEG RUDITSERspecial
04/06/2026Subgrade InspectionsOLEG RUDITSERspecial
04/06/2026FinalOLEG RUDITSERprogress
04/06/2026Footing and FoundationOLEG RUDITSERprogress
04/06/2026Energy Code Compliance InspectionsOLEG RUDITSERprogress
04/06/2026Fire-Resistance Rated ConstructionOLEG RUDITSERprogress
04/06/2026Lighting controlsOLEG RUDITSERenergy_progress
04/06/2026Exterior lighting powerOLEG RUDITSERenergy_progress
04/06/2026Protection of exposed foundation insulationOLEG RUDITSERenergy_progress
04/06/2026MeteringOLEG RUDITSERenergy_progress
04/06/2026Fenestration areasOLEG RUDITSERenergy_progress
04/06/2026Fenestration air leakageOLEG RUDITSERenergy_progress
04/06/2026Fenestration and door U-factor and product ratingsOLEG RUDITSERenergy_progress
04/06/2026Interior lighting powerOLEG RUDITSERenergy_progress
04/06/2026Insulation placement and R valuesOLEG RUDITSERenergy_progress
04/06/2026Air barrier - visual inspectionOLEG RUDITSERenergy_progress
03/06/2026Air barrier - visual inspectionOLEG RUDITSERenergy_progress
03/06/2026Fenestration air leakageOLEG RUDITSERenergy_progress
Latest 25 of 49.
▾Documents — 46 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/22/2026B01090562-I1Request digital key ↗
08/22/2026B01090562-S2Request digital key ↗
08/22/2026B01090562-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZoning Exhibit form (1-5)3
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-P2Open ↗
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026B01090562-P2Open ↗
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-P1Open ↗
▸Seals & Professional Certifications14
▸DOB NOWProgress Inspector Seal & Signature6
09/02/2026B01090562-S1Open ↗
09/02/2026B01090562-S1Open ↗
08/28/2026B01090562-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-S1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01090562-S1Open ↗
08/28/2026B01090562-P2Open ↗
08/23/2026B01090562-I1Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-P2Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-P2Open ↗
08/13/2026B01090562-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents13
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-P2Open ↗
▸DOB NOWPlot Diagram3
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-P2Open ↗
08/13/2026B01090562-I1Open ↗
▸DOB NOWProperty Ownership Certification3
08/13/2026B01090562-P2Open ↗
08/13/2026B01090562-P1Open ↗
08/13/2026B01090562-I1Open ↗
▸DOB NOWSite Survey: Initial3
08/13/2026B01090562-I1Open ↗
08/13/2026B01090562-P2Open ↗
08/13/2026B01090562-P1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01090562-I1Open ↗