ECB08/25/2016WORK W/O A PERMIT. OBSERVED: FRONT OF HOUSE BASEMENT LEVEL CUT INTO FOUNDATION ADDED A DOOR & ERECTED 6 STEPS TO DOOR ALSO CONCRETE BLOCKS ALONG SIDE OF STEPS AS A RETAINING WALL LENTIL ABOVE DOOR DOESN'T LOOKNothing owed — awaiting certificate of correction
Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.