← Back
BuildNYC
Two family brick
2878 HARRINGTON AVENUE
BRONX · BIN 2074212
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R4AZoning
2,850 sfGross Floor Area
2Units
Rent Stabilized8 Active Violations ▸FDNY Report ↗
Two family brick · Owner of record: 2878 Harrington Ave · 2,250 sf lot · 1.27 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 26p · 2 filings · 11 docs
Floor 18p · 2 filings · 11 docs
Cellar7p · 2 filings · 11 docs
Site & exterior1p · 1 filing · 3 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/14/2019$580K—Private party → 2878 HARRINGTON AVE LLC$204/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Just Consulting Engineering305/25/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Ecdesign Studio603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Splen ConstructionGeneral Contractor303/21/2026
John Fitzgerald Plumbing & HeatingPlumbing207/08/2026
Building Lifecycle
11/24/2025
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
12/03/2024
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
11/27/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · open
03/03/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating06/27/2022
DOB NOWPlumbingSigned-offJohn Fitzgerald Plumbing & Heating12/28/2021
DOB NOWGeneral ConstructionSigned-offSplen Construction12/23/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
03/03/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/16/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/08/2022Pass-Final General Construction Non-Directive 14PassView ↗
08/02/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/28/2022Pass-Final General Construction Non-Directive 14PassView ↗
07/26/2022Fail-Final General Construction Non-Directive 14FailView ↗
07/19/2022Fail-Final General Construction Non-Directive 14FailView ↗
06/29/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/29/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account