Two family brick
2879 CODDINGTON AVENUE
BRONX · Throgs Neck-Schuylerville · BIN 2074231
💬 Discuss this project
1920Year Built
2Stories
B1Building Class
R4AZoning
1,992 sfGross Floor Area
2Units
Two family brick · 6,167 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR208/08/2025
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281208/08/2025
Building Lifecycle
All (9)Filed (2)Permit Issued (1)Signed Off (1)Special Inspection (5)
10/06/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 21 Panels, 8.61 kW
X01125411-I1
08/08/2025
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 21 Panels, 8.61 kW
X01125411-P1
08/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
08/08/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
08/08/2025
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
08/08/2025
Special inspection requirement — Final
Mina Makar
08/08/2025
Special inspection requirement — Air barrier - visual inspection
Mina Makar
10/17/2024
Permit issued — Solar
X01125411-I1-SL
10/11/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 21 Panels, 8.61 kW
X01125411-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR10/17/2024
1 project · most recent 12/18/2024
FiledStatusContractorScope
12/18/2024CompleteISLAND ELECTRIC CORP—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
08/08/2025Fire-Resistant Penetrations and JointsMina Makarspecial
08/08/2025Structural Stability – Alterations of existing buildingsMina Makarspecial
08/08/2025Energy Code Compliance InspectionsMina Makarprogress
08/08/2025FinalMina Makarprogress
08/08/2025Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/18/2026X01125411-I1Request digital key ↗
08/18/2026X01125411-P1Request digital key ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/18/2026X01125411-I1Open ↗
08/18/2026X01125411-P1Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/26/2026X01125411-P1Open ↗
08/26/2026X01125411-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/26/2026X01125411-P1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/18/2026X01125411-I1Open ↗
08/18/2026X01125411-P1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026X01125411-I1Open ↗