← Back
BuildNYC
Zoned commercial or Manhattan residential
288 EAST 88TH STREET
MANHATTAN · BIN 1091792
💬 Discuss this project
0Year Built
—Stories
V1Building Class
C2-8Zoning
0 sfGross Floor Area
0Units
Rent Stabilized30 Active Violations ▸
Zoned commercial or Manhattan residential · Owner of record: Alchemy-Abr Ues · 6,057 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
Whole building & multi-floor projectsEAST 88 OWNER LLC c/o Alchemy-ABR PartnersUnder Construction3 filings
RoofEast 88 Owner LLCUnder Construction9p · 7 filings
Floor 22East 88 Owner LLCUnder Construction1p · 1 filing
Floor 21
Floor 20East 88 Owner LLCUnder Construction1p · 1 filing
Floor 19
Floor 18
Floor 17
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10East 88 Owner LLCUnder Construction1p · 1 filing
Floor 9Temporary pipe scaffoldUnder Construction1 filing
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4Material hoist installation1p · 1 filing
Floor 3
Floor 2Temporary worker/contractor sheds/officesUnder Construction3p · 3 filings
Floor 1East 88 Owner LLCUnder Construction2p · 2 filings
Site & exteriorSolidcoreUnder Construction16 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
East 88 Owner10810/21/2026
Amdar Company603/21/2026
Aimco E88TH Second603/21/2026
Solidcore309/13/2026
Aimco203/21/2026
Aimco Columbus Ave203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Cosentini Associates1710/20/2026
Asda Architecture + Design208/04/2026
Patuxent Engineering1207/06/2026
G. Blinn Consulting2006/26/2026
Ancora Engineering305/14/2026
Skyline Rigging303/10/2026
WSP603/04/2026
Gga Studios101/30/2026
Hill West Architects308/29/2025
Howard Shapiro & Associates212/11/2024
Mayrich Construction509/19/2024
Ashraf309/19/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
William Vitacco Associates4203/21/2026
A1 Expediting Service3403/21/2026
Patuxent Engineering2003/21/2026
Howard I Shapiro Associates403/21/2026
Green Studio603/21/2026
Northeast Service Interiors203/21/2026
J.A.M. Associates1203/21/2026
Domani Consulting203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
S&E Bridge & ScaffoldScaffold1907/08/2026
Leeding Builders GroupGeneral Contractor1204/09/2026
Platinum Services NYScaffold907/08/2026
BunlinScaffold707/08/2026
Metro Fire ProtectionFire Protection607/08/2026
Doria ScaffoldingScaffold304/09/2026
R.C. StructuresScaffold304/09/2026
Forward MechanicalPlumbing309/24/2026
Leeding Builders GroupScaffold204/09/2026
Service Sign Erectors CoSign hanger208/26/2026
Johnson RaymondElectrical103/21/2026
Advanced ElectricElectrical103/21/2026
Tano Electric CoElectrical103/21/2026
LND ElectricElectrical103/22/2026
Denali ElectricElectrical103/22/2026
Elmac ElectricElectrical103/21/2026
Mayrich ConstructionScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Domani Inspection Service8431710/20/2026
Skyline Rigging7880303/10/2026
WSP USA1848503/04/2026
Surface Design Profession3968402/03/2026
G. Blinn Consulting2894308/07/2025
Patuxent Engineering1893205/09/2025
Mueser Rutledge Consulting977512/10/2024
Building Lifecycle
All (274)Filed (74)Permit Issued (64)Signed Off (9)Violation (16)Inspection (17)Objection (64)Special Inspection (30)
10/20/2026
Filed — New Building
New 24 Story Mixed Use Building
M00637209-B1
09/23/2026
Permit issued — Plumbing
M00637209-S5-PL
08/31/2026
Special inspection requirement — Final
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Lighting in dwelling units
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Interior lighting power
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Lighting controls
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Shutoff dampers
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Permanent certificate
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Exterior lighting power
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Electrical motors and elevators
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Ventilation and air distribution system
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Metering
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
08/31/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
JOHN MCMONAGLE
08/14/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
08/06/2026
Permit issued — Sign
M01433166-I1-SG
08/04/2026
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M01433166-I1
08/04/2026
Permit issued — Sign
M01433165-I1-SG
08/03/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/31/2026
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
07/31/2026
Inspection — Certified Storm Drainage-ST-Piping-Water Test
Certified
View inspection ↗
07/31/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Water Test
Certified
View inspection ↗
07/30/2026
Filed — Alteration
Propose to install non-advertising sign. No change in use, egress, or occupancy.
M01433165-I1
07/23/2026
Special inspection requirement — Final
Alfonso DElia
07/14/2026
Objection raised — Other
07/06/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01426413-I1
07/06/2026
Permit issued — Supported Scaffold
M01426413-I1-SF
06/30/2026
Filed — New Building
New 24 Story Mixed Use Building
M00637209-A9
06/30/2026
Signed off — Alteration
M01129480-I1
06/30/2026
Signed off — Alteration
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOIST DURING NB CONST, FILED SEP. HOIST SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
M01129476-I1
06/30/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING IN ACCORDANCE WITH NYCC 2022 CHAPTER 33 BUILDING CODE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
M01205099-P5
06/30/2026
Signed off — Alteration
TEMPORARY TROLLEY BEAM SYSTEM AS PER DRAWINGS DURING NB CONST, FILED SEP. TROLLEY BEAM SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
M01182735-I1
06/29/2026
Permit issued — Supported Scaffold
M01129465-S1-SF
06/26/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01129465-S1
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/23/2026
Special inspection requirement — Heating Systems
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Mechanical Systems
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Final
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Duct leakage testing, insulation and design
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Maintenance information
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
JOHN MCMONAGLE
06/23/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOHN MCMONAGLE
06/03/2026
Signed off — Alteration
Installation of a temporary 2-point suspended scaffold. Equipment shall comply with 2022 BC Chapter 33. No change in use, egress, or occupancy.
M01205095-I1
06/02/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/26/2026
Filed — Alteration
HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR SHED INSTALLED ON ROADWAY.
M01129465-P3
05/22/2026
Filed — Alteration
CONSTRUCTION FENCE AS PER DRAWINGS DURING NB CONST, FILED SEP. CONSTRUCTION FENCE SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. DOT PERMITS BY OTHERS FOR FENCE ON SIDEWALK/ROADWAY.
M01129488-P1
05/20/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
05/14/2026
Filed — Alteration
THE PLANS ENCLOSED DEPICT THE EXTENTS FOR THE PROPOSED TEMPORARY USE AT THE 282"-0" 24-STY, LOCATED AT 288 EAST 88TH ST, BOROUGH OF NEW YORK, NY 10128
M01396279-I1
04/28/2026
Signed off — New Building
New 24 Story Mixed Use Building
M00637209-S2
04/21/2026
Objection resolved — Addressed
Latest 60 of 274 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedForward Mechanical09/23/2026
DOB NOWSignPermit IssuedService Sign Erectors Co08/06/2026
DOB NOWSignPermit IssuedService Sign Erectors Co08/04/2026
DOB NOWSupported ScaffoldPermit IssuedBunlin07/06/2026
DOB NOWSupported ScaffoldPermit IssuedS&E Bridge & Scaffold06/29/2026
DOB NOWSuspended ScaffoldSigned-offBunlin04/07/2026
DOB NOWSupported ScaffoldPermit IssuedBunlin04/07/2026
DOB NOWSuspended ScaffoldPermit IssuedBunlin04/06/2026
DOB NOWMechanical SystemsPermit IssuedLeeding Builders Group04/03/2026
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding04/03/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold02/24/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedLeeding Builders Group01/26/2026
DOB NOWStructuralSigned-offLeeding Builders Group12/18/2025
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group12/17/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding11/07/2025
DOB NOWSuspended ScaffoldPermit IssuedDoria Scaffolding11/06/2025
DOB NOWStandpipePermit IssuedMetro Fire Protection10/22/2025
DOB NOWPlumbingPermit IssuedForward Heating10/22/2025
DOB NOWStandpipePermit IssuedMetro Fire Protection10/21/2025
DOB NOWSprinklersPermit IssuedMetro Fire Protection10/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold10/01/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/30/2025
DOB NOWConstruction FencePermit IssuedS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold09/29/2025
DOB NOWSidewalk ShedPermit IssuedS&E Bridge & Scaffold09/29/2025
DOB NOWProtection and Mechanical MethodsSigned-offS&E Bridge & Scaffold06/10/2025
DOB NOWSupported ScaffoldPermit IssuedBunlin04/15/2025
DOB NOWSuspended ScaffoldSigned-offBunlin04/10/2025
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group04/02/2025
DOB NOWSuspended ScaffoldPermit IssuedBunlin04/02/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedLeeding Builders Group02/05/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedS&E Bridge & Scaffold01/09/2025
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures12/23/2024
DOB NOWStructuralSigned-offLeeding Builders Group12/16/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures12/11/2024
DOB NOWGeneral ConstructionPermit IssuedLeeding Builders Group12/10/2024
DOB NOWProtection and Mechanical MethodsPermit IssuedR.C. Structures12/04/2024
DOB NOWStructuralSigned-offLeeding Builders Group12/03/2024
+ 28 more permits on file
1 project · most recent 10/20/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
10/20/2026Permit IssuedLeeding Builders GroupHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Daikin REYQ96XATJB 96,042 BTU · Vrf Outdoor ×91
REYQ120XATJB 120,077 BTU · Vrf Outdoor ×49
REYQ144XATJB 144,080 BTU · Vrf Outdoor ×14
REYQ168XATJB 168,640 BTU · Vrf Outdoor ×8
REYQ72XATJB 72,040 BTU · Vrf Outdoor ×7
RXTQ48TBVJUB 48,038 BTU · Vrf Outdoor ×6
RXTQ48TBVJUA 48,038 BTU · Vrf Outdoor ×1
Williams AH012DXB203R000 1,100 CFM ×6
AH012DXB403R000 1,100 CFM · Furnace ×1
Ventilation
Daikin DPSC20BCPB24AAMD24FCGVHF35D1F0 6,200 CFM · Doas ×6
DPS020A 6,200 CFM · Doas ×1
2 projects · most recent 10/20/2026
Sprinkler System
FiledStatusContractorScope
10/20/2026Permit IssuedMetro Fire ProtectionSprinkler System
10/26/2021——99 outlets
1 project · most recent 10/20/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/20/2026Permit IssuedForward MechanicalGas, Storm, Water/Sanitary
10 projects · most recent 02/11/2025
General Wiring
FiledStatusContractorScope
02/11/2025Permit IssuedLND ElectricGeneral Wiring
01/30/2025Permit IssuedDenali Electric—
01/07/2025CompleteNash Electric Services—
11/20/2024CompleteNash Electric Services—
10/21/2024Permit IssuedHigh Quality Electric of—
10/18/2023Permit IssuedIlluminous ElectricGeneral Wiring
10/18/2023Permit IssuedIlluminous ElectricGeneral Wiring
10/18/2023Permit IssuedIlluminous ElectricGeneral Wiring
11/18/2020Permit IssuedA Electrical Main ServiceGeneral Wiring
07/26/2019Permit IssuedL J Electrical ServiceGeneral Wiring
1 project · most recent 10/20/2026
Steel Concrete Masonry
FiledStatusContractorScope
10/20/2026Permit IssuedForward MechanicalSteel, Concrete, Masonry
7 projects · most recent 07/06/2026
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
07/06/2026Permit IssuedBunlinScaffold
06/30/2026Permit IssuedBunlinScaffold
06/26/2026Permit IssuedS&E Bridge & ScaffoldScaffold, Sidewalk Shed
05/22/2026Permit IssuedS&E Bridge & ScaffoldFence
09/19/2024Permit IssuedMayrich ConstructionFence
09/19/2023Permit IssuedPlatinum Services NYScaffold, Sidewalk Shed
———Fence
1 project · most recent 03/10/2026
Suspended Scaffold
FiledStatusContractorScope
03/10/2026Permit IssuedDoria ScaffoldingSuspended Scaffold
3 projects · most recent 03/10/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
03/10/2026Permit IssuedDoria ScaffoldingSuspended Scaffold (SC)
02/23/2026Signed-offBunlinSuspended Scaffold (SC)
05/09/2025Permit IssuedBunlinSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 17
DateTypeResultReport
08/14/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
08/03/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/31/2026Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
07/31/2026Certified Storm Drainage-ST-Piping-Water TestCertifiedView ↗
07/31/2026Certified Water and Sanitary-WS-Sanitary Piping-Water TestCertifiedView ↗
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/02/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/20/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/09/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
03/02/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/25/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/18/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/18/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/10/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
08/05/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/17/2025Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
02/17/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
08/31/2026FinalJOHN MCMONAGLEprogress
08/31/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
08/31/2026HVAC-R and service water heating system controlsJOHN MCMONAGLEenergy_progress
08/31/2026Duct leakage testing, insulation and designJOHN MCMONAGLEenergy_progress
08/31/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
08/31/2026MeteringJOHN MCMONAGLEenergy_progress
08/31/2026Maintenance informationJOHN MCMONAGLEenergy_progress
08/31/2026Exterior lighting powerJOHN MCMONAGLEenergy_progress
08/31/2026Lighting in dwelling unitsJOHN MCMONAGLEenergy_progress
08/31/2026Permanent certificateJOHN MCMONAGLEenergy_progress
08/31/2026Electrical motors and elevatorsJOHN MCMONAGLEenergy_progress
08/31/2026Lighting controlsJOHN MCMONAGLEenergy_progress
08/31/2026Interior lighting powerJOHN MCMONAGLEenergy_progress
08/31/2026Ventilation and air distribution systemJOHN MCMONAGLEenergy_progress
08/31/2026Shutoff dampersJOHN MCMONAGLEenergy_progress
08/31/2026Mechanical SystemsJOHN MCMONAGLEspecial
08/31/2026Heating SystemsJOHN MCMONAGLEspecial
08/31/2026Fire-Resistant Penetrations and JointsJOHN MCMONAGLEspecial
08/31/2026Emergency and Standby Power Systems (Generator)JOHN MCMONAGLEspecial
07/23/2026FinalAlfonso DEliaprogress
06/23/2026FinalJOHN MCMONAGLEprogress
06/23/2026HVAC-R and service water piping design and insulationJOHN MCMONAGLEenergy_progress
06/23/2026Emergency and Standby Power Systems (Generator)JOHN MCMONAGLEspecial
06/23/2026HVAC-R and service water heating equipmentJOHN MCMONAGLEenergy_progress
06/23/2026Maintenance informationJOHN MCMONAGLEenergy_progress
Latest 25 of 150.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
SolidcoreFitness / Recreation—
Project M01433165 Alteration · Permit Entire · 07/30/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 429 on file (BIS + DOB NOW)
▸Plans & Drawings75
▸DOB NOWPlans/Sketch69
09/03/2026M00605582-I1Request digital key ↗
08/29/2026M00934495-I1Request digital key ↗
08/29/2026M00934486-I1Request digital key ↗
Showing 3 of 69 on file for this type
▸DOB NOWPlans/Sketch - Standpipe2
09/03/2026M00228118-I1Request digital key ↗
Showing 1 of 2 on file for this type
▸DOB NOWPlans/Sketch - Structural1
09/06/2026M00228127-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Plumbing1
09/03/2026M00227987-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
09/03/2026M00228118-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/03/2026M00219959-I1Request digital key ↗
▸Applications & Permits25
▸BISPLAN / WORK APPROVAL APPLICATION19
02/05/2026141025165Open ↗
01/06/2026101997038Open ↗
01/05/2026104554885Open ↗
Showing 3 of 19 on file for this type
▸BISWORK PERMIT APPLICATION4
12/10/2012121435688Open ↗
11/30/2012121435688Open ↗
08/27/2009120078156Open ↗
Showing 3 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
06/25/2024141025165Open ↗
12/21/2023141025165Open ↗
▸Zoning, Tax Lot & Property Records81
▸DOB NOWRestrictive Declaration/Easement 324
10/22/2026M00637209-B1Open ↗
Showing 1 of 24 on file for this type
▸DOB NOWRestrictive Declaration/Easement 224
10/22/2026M00637209-B1Open ↗
Showing 1 of 24 on file for this type
▸DOB NOWRestrictive Declaration/Easement 124
10/22/2026M00637209-B1Open ↗
Showing 1 of 24 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications151
▸DOB NOWDPL-1: Design Professional Seal & Signature76
10/22/2026M00637209-B1Open ↗
09/06/2026M00948804-I1Open ↗
09/03/2026M00219959-I1Open ↗
Showing 3 of 76 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
10/22/2026M00637209-B1Open ↗
09/27/2026M00637209-I1Open ↗
09/27/2026M00637209-I1Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWProgress Inspector Seal & Signature30
10/22/2026M00637209-B1Open ↗
10/22/2026M00637209-B1Open ↗
09/27/2026M00637209-I1Open ↗
Showing 3 of 30 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
03/26/2013121435688Open ↗
11/19/2012121435688Open ↗
08/03/2009120078156Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
01/09/2013121435688Open ↗
11/19/2012121435688Open ↗
08/03/2009120078156Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
11/19/2012121435688Open ↗
08/03/2009120078156Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/21/2023141025165Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/21/2023141025165Open ↗
▸Trade Schedules & Equipment12
▸BISSCHEDULE B - PLUMBING4
11/19/2012121435688Open ↗
11/23/2009120078156Open ↗
09/30/2009120078156Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
02/21/2013121435688Open ↗
01/22/2010120078156Open ↗
01/05/2010120078156Open ↗
▸DOB NOWStandpipe Alarms Drawings1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
06/25/2024141025165Open ↗
▸BISSTREET TREE CHECKLIST1
02/05/2026141025165Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/19/2012121435688Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
08/03/2009120078156Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
03/26/2013121435688Open ↗
11/19/2012121435688Open ↗
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs4
▸BISADMINISTRATIVE OBJECTIONS1
08/03/2009120078156Open ↗
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
06/25/2024141025165Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
02/11/2026141025165Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
03/26/2013121435688Open ↗
▸Cost, Insurance & Ownership5
▸BISCOST AFFIDAVIT4
03/26/2013121435688Open ↗
01/09/2013121435688Open ↗
11/19/2012121435688Open ↗
Showing 3 of 4 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
08/11/2009120078156Open ↗
▸Filing & Intake Forms7
▸BISADDITIONAL INFORMATION4
02/10/2026141025165Open ↗
01/28/2013121435688Open ↗
01/09/2013121435688Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
11/19/2012121435688Open ↗
08/03/2009120078156Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
12/21/2023141025165Open ↗
▸Other Documents54
▸DOB NOWDHCR Document20
10/22/2026M00637209-B1Open ↗
09/06/2026M00948804-I1Open ↗
09/03/2026M00605582-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWCalculations8
08/19/2026M01205095-P1Open ↗
08/19/2026M01205095-I1Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWManufacturer's Specifications8
08/19/2026M01205095-P1Open ↗
08/19/2026M01205095-I1Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWSite Survey: Initial4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/23/2026M00637209-A3Open ↗
08/23/2026M00637209-A1Open ↗
08/23/2026M00637209-I1Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
02/10/2026141025165Open ↗
▸BISTREE REMOVAL: OUTSIDE PROP./PARKS APPR1
06/25/2024141025165Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
06/25/2024141025165Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
11/30/2012121435688Open ↗
▸DOB NOWAdjoining Owners Notification1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type