HPD10/02/2014SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE DEBBRI AT FRONT YARD
Two stories - detached, small or mid-size · 1,640 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.