← Back
Miscellaneous two family
288 MANHATTAN AVENUE
BROOKLYN · BIN 3069043
💬 Discuss this project
1901Year Built
3Stories
B9Building Class
R6BZoning
1,530 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Miscellaneous two family · 1,375 sf lot · 1.11 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof1p · 1 filing · 6 docs
Floor 2Under Construction18p · 3 filings · 20 docs
Floor 1Under Construction17p · 2 filings · 20 docs
CellarUnder Construction17p · 2 filings · 20 docs
BasementUnder Construction8p · 1 filing · 20 docs
Sub-Basement9p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J L SERVICE NYC208/29/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/25/2022$1.8M—— → —$1,154/sf building
07/29/2019$1.4M—Private party → 288 MANHATTHAN AVENUE LLC$915/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AIR SOLUTION INC.107/06/2026
F360 ARCHITECTURE PLLC302/17/2026
L&C ASSOCIATES304/28/2023
L & C ASSOCIATES212/01/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
L&C ASSOCIATES503/21/2026
UP DESIGN SERVICES303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J & L SERVICE NYC INCGeneral Contractor707/09/2026
MPD SOLUTIONS LLCGeneral Contractor107/08/2026
G.B. & SON, INCPlumbing107/08/2026
JUST PLBG & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC7778108/27/2025
LAM AND CO CONSULTING LLC8065212/01/2022
Building Lifecycle
All (69)Filed (9)Permit Issued (8)Signed Off (2)Violation (1)Inspection (6)Objection (24)Special Inspection (19)
07/22/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/07/2026
Permit issued — Construction Fence
B01244136-S1-FN
07/06/2026
Filed — Alteration CO
PROPOSED CONVERSION FROM TWO TO ONE FAMILY OF AN EXISTING TWO STORY DWELLING.
B01244136-S1
03/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/18/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
02/17/2026
Filed — Alteration
PROPOSED PLUMBING WORK THROUGH OUT cellar, garden level and 1st floor of 3story building to be converted from two to one family dwelling, new navien boiler at cellar
B01244137-P1
01/22/2026
Permit issued — General Construction
B01244136-I1-GC
01/07/2026
Permit issued — Plumbing
B01244137-I1-PL
01/05/2026
Permit issued — General Construction
B01244136-I1-GC
12/30/2025
Permit issued — General Construction
B01244136-I1-GC
12/01/2025
Permit issued — General Construction
B01244136-I1-GC
11/10/2025
Objection resolved — Addressed
10/29/2025
Objection raised — Energy
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/24/2025
Objection resolved — Addressed
10/09/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
09/23/2025
Objection resolved — Addressed
09/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
09/23/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
09/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
09/23/2025
Special inspection requirement — Preliminary
XIONGCAI GU
09/23/2025
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
09/23/2025
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
09/23/2025
Special inspection requirement — Maintenance information
XIONGCAI GU
09/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
09/23/2025
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
09/23/2025
Special inspection requirement — Interior lighting power
XIONGCAI GU
09/23/2025
Special inspection requirement — Permanent certificate
XIONGCAI GU
09/23/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Plumbing
09/17/2025
Objection raised — Plumbing
09/08/2025
Objection raised — Plumbing
09/08/2025
Objection raised — Scope
09/08/2025
Objection raised — Scope
09/08/2025
Objection raised — Zoning
09/08/2025
Objection raised — Scope
08/27/2025
Filed — Alteration CO
PROPOSED CONVERSION FROM TWO TO ONE FAMILY OF AN EXISTING TWO STORY DWELLING.
B01244136-I1
08/26/2025
Filed — Alteration
PROPOSED PLUMBING WORK THROUGH OUT cellar, garden level and 1st floor of 3story building to be converted from two to one family dwelling, new navien boiler at cellar
B01244137-I1
07/24/2023
Signed off — Alteration
INTERIOR RENOVATION WITH PARTITIONS AT 2ND FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS OR OCCUPANCY IN THIS APPLICATION.
B08034696-I1
07/24/2023
Signed off — Alteration
PROPOSED PLUMBING WORK AT 2ND FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B08034829-I1
07/21/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/09/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
05/01/2023
Special inspection requirement — Energy Code Compliance Inspections
CHI WAI CHUNG
05/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
CHI WAI CHUNG
04/28/2023
Filed — Alteration
PROPOSED PLUMBING WORK AT 2ND FLOOR AS PER PLAN. NO CHANGE IN USE, MEANS OF EGRESS, OR OCCUPANCY IN THIS APPLICATION.
B08034829-P2
01/31/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/23/2023
Permit issued — Plumbing
B08034829-I1-PL
12/15/2022
Permit issued — General Construction
B08034696-I1-GC
12/05/2022
Special inspection requirement — Interior lighting power
CHI WAI CHUNG
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedJ & L SERVICE NYC INC07/07/2026
DOB NOWGeneral ConstructionPermit IssuedJ & L SERVICE NYC INC01/22/2026
DOB NOWPlumbingPermit IssuedMOHAMED ABDELRAZEK01/07/2026
DOB NOWGeneral ConstructionPermit IssuedJ & L SERVICE NYC INC01/05/2026
DOB NOWGeneral ConstructionPermit IssuedJ & L SERVICE NYC INC12/30/2025
DOB NOWGeneral ConstructionPermit IssuedJ & L SERVICE NYC INC12/01/2025
DOB NOWPlumbingSigned-offG.B. & SON, INC01/23/2023
DOB NOWGeneral ConstructionSigned-offMPD SOLUTIONS LLC12/15/2022
1 project · most recent 02/17/2026
Gas Water/Sanitary
FiledStatusContractorScope
02/17/2026Permit IssuedJUST PLBG & HTG INCGas, Water/Sanitary
1 project · most recent 12/20/2025
General Wiring
FiledStatusContractorScope
12/20/2025Permit IssuedFIRST STAR ELECTRIC INCGeneral Wiring
1 project · most recent 07/06/2026
Fence
FiledStatusContractorScope
07/06/2026Permit IssuedJ & L SERVICE NYC INCFence
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
07/22/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/21/2023Pass-Final General Construction Non-Directive 14PassView ↗
05/09/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
01/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
09/23/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
09/23/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
09/23/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
09/23/2025PreliminaryXIONGCAI GUprogress
09/23/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
09/23/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
09/23/2025Maintenance informationXIONGCAI GUenergy_progress
09/23/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
09/23/2025Fenestration air leakageXIONGCAI GUenergy_progress
09/23/2025Interior lighting powerXIONGCAI GUenergy_progress
09/23/2025Permanent certificateXIONGCAI GUenergy_progress
09/23/2025Fenestration areasXIONGCAI GUenergy_progress
05/01/2023Energy Code Compliance InspectionsCHI WAI CHUNGprogress
05/01/2023HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
12/05/2022Interior lighting powerCHI WAI CHUNGenergy_progress
12/05/2022Fire-Resistant Penetrations and JointsCHI WAI CHUNGspecial
12/05/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
12/01/2022Energy Code Compliance InspectionsCHI WAI CHUNGprogress
12/01/2022HVAC-R and service water piping design and insulationCHI WAI CHUNGenergy_progress
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/28/2026B08034696-P1Request digital key ↗
08/28/2026B08034696-I1Request digital key ↗
08/28/2026B08034829-P1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B01244136-I1Open ↗
▸Seals & Professional Certifications29
▸DOB NOWProgress Inspector Seal & Signature17
08/31/2026B08034829-P1Open ↗
08/31/2026B08034829-P1Open ↗
08/26/2026B01244136-I1Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/28/2026B08034829-I1Open ↗
08/28/2026B08034829-P1Open ↗
08/28/2026B08034829-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026B01244136-I1Open ↗
08/25/2026B08034696-I1Open ↗
▸Safety & Tenant Protection1
▸DOB NOWStreet Tree Checklist1
08/13/2026B01244136-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report9
08/28/2026B08034696-I1Open ↗
08/28/2026B08034829-I1Open ↗
08/28/2026B08034829-P1Open ↗
Showing 3 of 9 on file for this type
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01244136-I1Open ↗