← Back
BuildNYC
Two stories - detached, small or mid-size
289 HART AVENUE
STATEN ISLAND · BIN 5007508
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R2Zoning
1,546 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,160 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 2One story addition5p · 1 filing · 10 docs
Floor 1Curb cut filing12p · 3 filings · 18 docs
Site & exteriorInstallation of construction fence8p · 3 filings · 12 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Steven R. Savino Architect803/31/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ServidioScaffold307/08/2026
Paul Toth Excavationspecialty_contractor203/21/2026
ServidioGeneral Contractor207/08/2026
Able Plumbing Co RichmondPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Steven R. Savino Architects1216209/16/2024
Building Lifecycle
12/18/2025
Signed off — Alteration
CONSTRUCTION OF A HORIZONTAL 1- STORY ADDITION AND NEW COVERED DECK LOCATED TO THE REAR OF THE HOUSE. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S00904469-I1
10/27/2025
Signed off — Alteration
RELOCATE 1- KITCHEN SINK, RELOCATE 1- STOVE AND INSTALL 1- NEW LAV AND 1- NEW TOILET ON THE FIRST FLOOR, REMOVE OIL BOILER AND TANK AND INSTALL A NEW GAS BOILER IN THE CELLAR SPACE.
S00904453-I1
05/27/2025
Signed off — Alteration
FILING FOR A CURB CUT NO. FOR AN EXISTING CURB CUT.
S00904438-I1
05/21/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/15/2025
Permit issued — Curb Cut
S00904438-I1-CC
29 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offHugh Chrysler Engineering Co05/15/2025
DOB NOWConstruction FenceSigned-offHugh Chrysler Engineering Co04/07/2025
DOB NOWFull DemolitionSigned-offPaul Toth Excavation11/13/2024
DOB NOWPlumbingSigned-offAble Plumbing Co Richmond09/27/2024
DOB NOWConstruction FenceSigned-offHugh Chrysler Engineering Co07/30/2024
DOB NOWGeneral ConstructionSigned-offHugh Chrysler Engineering Co07/30/2024
1 project · most recent 03/11/2025
General Wiring
FiledStatusContractorScope
03/11/2025CompleteRidge ElectricGeneral Wiring
1 project · most recent 09/16/2024
Fence
FiledStatusContractorScope
09/16/2024Signed-offPaul Toth ExcavationFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/21/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/21/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/02/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/02/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/20/2024Demolitionanthony santorospecial
06/20/2024Structural Stability – Alterations of existing BuildingsSteven Savinospecial
35 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account