← Back
BuildNYC
Two stories - detached, small or mid-size
2893 ZULETTE AVENUE
BRONX · BIN 2074503
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R4AZoning
1,080 sfGross Floor Area
1Units
0 Active Violations
Two stories - detached, small or mid-size · 2,375 sf lot · 0.45 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 25p · 2 filings · 20 docs
Floor 15p · 2 filings · 20 docs
Cellar6p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Sotir Associates401/24/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Urena Construction & DesignGeneral Contractor107/08/2026
Infiniti Esc PlumbingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Engineering Consulting SE2050201/24/2024
Building Lifecycle
04/12/2024
Signed off — Alteration
PROPOSED INTERIOR RENOVATIONS OF EXISTING ONE FAMILY HOUSE TO REPAIR FIRE DAMAGE. PLUMBING FIXTURES REPLACEMENT FILED UNDER PL APP #X00882263.
X00882215-I1
02/15/2024
Signed off — Alteration
REPLACE PLUMBING FIXTURES; IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC #X00882215.
X00882263-I1
02/05/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/31/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/24/2024
Filed — Alteration
REPLACE PLUMBING FIXTURES; IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC #X00882215.
X00882263-P1
22 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offInfiniti Esc Plumbing09/13/2023
DOB NOWGeneral ConstructionSigned-offUrena Construction & Design07/17/2023
1 project · most recent 03/04/2024
General Wiring
FiledStatusContractorScope
03/04/2024Permit IssuedE.T. Electrical ContractingGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
02/05/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/10/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/10/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/24/2024Fire-Resistant Penetrations and JointsPAUL MARINOspecial
01/24/2024Structural Stability – Alterations of existing buildingsPAUL MARINOspecial
01/24/2024FinalHany Demetryprogress
01/24/2024Energy Code Compliance InspectionsPAUL MARINOprogress
01/24/2024Lighting in dwelling unitsPAUL MARINOenergy_progress
01/24/2024Energy Code Compliance InspectionsPAUL MARINOprogress
01/22/2024Energy Code Compliance InspectionsPAUL MARINOprogress
22 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account