← Back
Three families
2894 BAILEY AVENUE
BRONX · BIN 2015894
💬 Discuss this project
1901Year Built
3Stories
C0Building Class
R6Zoning
2,472 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Three families · 4,103 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
KRIS KOZLOWSKI ARCHITECT208/10/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARTWIN CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AJC PLUMBING & HTG CORPPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
KRIS KOZLOWSKI ARCHITECT3955208/10/2022
Building Lifecycle
All (12)Filed (2)Permit Issued (3)Signed Off (1)Violation (3)Inspection (3)
04/29/2026
Violation issued (HPD, closed)
A
01/08/2024
Signed off — Alteration
INSTALLATIONS OF NEW BOILERS WITH INDIRECT HOT WATER TANKS. NO CHANGE TO USE, OCCUPANCY AND EGRESS.
X00517220-I1
10/26/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/10/2023
Permit issued — Plumbing
X00517220-I1-PL
02/08/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
11/03/2022
Violation issued (HPD, closed)
I
10/06/2022
Permit issued — Plumbing
X00517220-I1-PL
08/10/2022
Filed — Alteration
INSTALLATIONS OF NEW BOILERS WITH INDIRECT HOT WATER TANKS. NO CHANGE TO USE, OCCUPANCY AND EGRESS.
X00517220-P1
06/29/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/06/2021
Permit issued — Plumbing
X00517220-I1-PL
05/06/2021
Filed — Alteration
INSTALLATIONS OF NEW BOILERS WITH INDIRECT HOT WATER TANKS. NO CHANGE TO USE, OCCUPANCY AND EGRESS.
X00517220-I1
04/02/2021
Violation issued (HPD, closed)
A
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP10/10/2023
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP10/06/2022
DOB NOWPlumbingSigned-offAJC PLUMBING & HTG CORP10/06/2021
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/26/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
02/08/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/29/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Documents — 6 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026X00517220-I1Request digital key ↗
08/15/2026X00517220-P1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/25/2026X00517220-P1Open ↗
08/25/2026X00517220-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/25/2026X00517220-I1Open ↗
08/15/2026X00517220-P1Open ↗