← Back
Two family converted from one family
29-02 164 STREET
QUEENS · Murray Hill-Broadway Flushing · BIN 4111050
💬 Discuss this project
1940Year Built
1Stories
B3Building Class
R3-2Zoning
1,963 sfGross Floor Area
2Units
Two family converted from one family · 2,153 sf lot · 0.91 FAR built · Flood zone X
Locations of Work
Plumbing
Floor 11p · 1 filing · 4 docs
Cellar1p · 1 filing · 4 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FLUSHING ENGINEERING SERVICE PC109/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
M2 DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
K & BH PLUMBING & HTG INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FLUSHING ENGINEERING SERV4373109/14/2022
Building Lifecycle
All (5)Filed (1)Permit Issued (1)Signed Off (1)Inspection (1)Special Inspection (1)
10/21/2022
Signed off — Alteration
TEST GAS LINE FROM GAS METERS TO GAS BOILER AND GAS HOT WATER HEATER , GAS DRYER IN THE BASEMENT , TO 1ST FL STOVE TO OBTAIN NEW GAS AUTHORIZATION(DUE TO GAS LEAKAGE) AS PER REQUESTED BY UTILITY COMPANY,NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q07995433-I1
09/30/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/22/2022
Permit issued — Plumbing
Q07995433-I1-PL
09/14/2022
Filed — Alteration
TEST GAS LINE FROM GAS METERS TO GAS BOILER AND GAS HOT WATER HEATER , GAS DRYER IN THE BASEMENT , TO 1ST FL STOVE TO OBTAIN NEW GAS AUTHORIZATION(DUE TO GAS LEAKAGE) AS PER REQUESTED BY UTILITY COMPANY,NO CHANGE IN USE, OCCUPANCY OR EGRESS.
Q07995433-I1
08/29/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
KY FU
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offK & BH PLUMBING & HTG INC09/22/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
09/30/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
08/29/2022Fire-Resistant Penetrations and JointsKY FUspecial
▾Documents — 4 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/25/2026Q07995433-I1Request digital key ↗
▸Seals & Professional Certifications2
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q07995433-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026Q07995433-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q07995433-I1Open ↗