← Back
BuildNYC
Miscellaneous warehouse
29-05 120TH STREET
QUEENS · College Point · BIN 4100713
💬 Discuss this project
1957Year Built
1Stories
E9Building Class
M2-1Zoning
28,320 sfGross Floor Area
1Units
LL97 Covered0 Active Violations
Miscellaneous warehouse · Owner of record: Jia Wing Realty · 38,877 sf lot · 0.73 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofW&w Realty Management LLCUnder Construction6p · 2 filings · 20 docs
Floor 1W&w Realty Management LLC22p · 2 filings · 20 docs
Filed — no permit issuedFence installation2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Jia Wing Realty303/22/2026
Bao Jia Holding203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/28/2020$11.3M—— → —$401/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Square Arch103/10/2026
LCW Engineering703/28/2025
Tan Architect104/19/2023
Michael Kang Architect101/11/2021
Z&T Engineering1—
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Amergy Solar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
A.A. Mechanical Solspecialty_contractor603/21/2026
Amergy SolarGeneral Contractor207/08/2026
MPS Plumbing & HeatingFire Protection107/08/2026
MPS Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Sq. Arch4802203/10/2026
LCW Engineering1103503/28/2025
Z & T Engineering5911—
Building Lifecycle
All (77)Filed (10)Permit Issued (6)Signed Off (4)Violation (5)Inspection (8)Objection (19)Special Inspection (25)
05/14/2026
Permit issued — Solar
Q01301567-I1-SL
03/12/2026
Permit issued — Solar
Q01301567-I1-SL
03/10/2026
Filed — Alteration
Installation of Solar panels on existing roof structure, No change in use, egress or occupancy.
Q01301567-I1
03/09/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Kaijin Liang
10/12/2025
Special inspection requirement — Air barrier - visual inspection
Kaijin Liang
10/12/2025
Special inspection requirement — Final
Kaijin Liang
10/12/2025
Special inspection requirement — Energy Code Compliance Inspections
Kaijin Liang
10/12/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Kaijin Liang
05/12/2025
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S3
04/25/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/23/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/11/2025
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-I1
04/11/2025
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S1
04/10/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/08/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/01/2025
Special inspection requirement — Sprinkler Systems
luis wong
03/28/2025
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-P2
03/28/2025
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-P3
03/28/2025
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-P1
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
luis wong
03/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
luis wong
03/26/2025
Special inspection requirement — Energy Code Compliance Inspections
luis wong
03/26/2025
Special inspection requirement — Final
03/26/2025
Special inspection requirement — Interior lighting power
luis wong
03/26/2025
Special inspection requirement — Lighting controls
luis wong
03/26/2025
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
03/26/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
03/24/2025
Signed off — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S2
02/26/2025
Permit issued — Mechanical Systems
Q01046036-S2-MS
02/25/2025
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S2
02/25/2025
Special inspection requirement — Energy Code Compliance Inspections
luis wong
02/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
luis wong
02/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
luis wong
11/13/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/28/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/28/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/17/2024
Permit issued — Sprinklers
Q01046036-S3-EW-SP
09/10/2024
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S3
07/29/2024
Permit issued — Plumbing
Q01046036-S1-PL
06/26/2024
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-S1
05/21/2024
Permit issued — General Construction
Q01046036-I1-GC
05/16/2024
Filed — Alteration
Subsequent filing for plumbing installation as per the plans filed herewith. No change to the use, egress or occupancy.
Q01046036-I1
05/03/2024
Special inspection requirement — Mechanical Systems
luis wong
05/03/2024
Special inspection requirement — Final
luis wong
05/11/2023
Special inspection requirement — Energy Code Compliance Inspections
05/11/2023
Special inspection requirement — Fire-Resistance Rated Construction
04/24/2023
Objection raised — Structural
04/24/2023
Objection resolved — Resolved
04/24/2023
Objection raised — Structural
04/24/2023
Objection raised — Scope
04/24/2023
Objection resolved — Resolved
04/24/2023
Objection raised — Structural
04/24/2023
Objection resolved — Resolved
04/24/2023
Objection raised — Zoning
04/24/2023
Objection resolved — Resolved
04/24/2023
Objection raised — Accessibility
04/24/2023
Objection raised — Fire_Protection
04/24/2023
Objection resolved — Resolved
04/24/2023
Objection raised — Energy
Latest 60 of 77 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedAmergy Solar05/14/2026
DOB NOWSolarPermit IssuedAmergy Solar03/12/2026
DOB NOWMechanical SystemsSigned-offA.A. Mechanical Sol02/26/2025
DOB NOWSprinklersSigned-offMPS Plumbing & Heating09/17/2024
DOB NOWPlumbingSigned-offMPS Plumbing & Heating07/29/2024
DOB NOWGeneral ConstructionSigned-offA.A. Mechanical Sol05/21/2024
BISOTISSUEDSheng Sheng Construction03/10/2021
BISMHISSUEDNew Tech Mechan Systems I05/08/2017
BISOTISSUEDG. Perotto Associates, LLLP01/27/2003
2 projects · most recent 07/07/2026
General Wiring
FiledStatusContractorScope
07/07/2026CompleteI.P. Electric—
08/06/2024Permit IssuedUnited Electrical Cont'gGeneral Wiring
1 project
FiledStatusContractorScope
———2 scope_items
1 project · most recent 03/10/2026
FiledStatusContractorScope
03/10/2026Permit IssuedAmergy Solar1,014 panels, 598.2 kw, 26,108 roof_area_sqft
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/25/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/23/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/10/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/08/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/28/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/28/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
10/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
03/09/2026Structural Stability – Alterations of existing buildingsKaijin Liangspecial
10/12/2025Air barrier - visual inspectionKaijin Liangenergy_progress
10/12/2025FinalKaijin Liangprogress
10/12/2025Energy Code Compliance InspectionsKaijin Liangprogress
10/12/2025Fire-Resistant Penetrations and JointsKaijin Liangspecial
04/01/2025Sprinkler Systemsluis wongspecial
03/26/2025Energy Code Compliance Inspectionsluis wongprogress
03/26/2025Fire-Resistant Penetrations and Jointsluis wongspecial
03/26/2025Energy Code Compliance Inspectionsluis wongprogress
03/26/2025Final—progress
03/26/2025Interior lighting powerluis wongenergy_progress
03/26/2025Lighting controlsluis wongenergy_progress
03/26/2025HVAC-R and service water heating equipmentluis wongenergy_progress
03/26/2025HVAC-R and service water piping design and insulationluis wongenergy_progress
02/25/2025Energy Code Compliance Inspectionsluis wongprogress
02/25/2025HVAC-R and service water piping design and insulationluis wongenergy_progress
02/25/2025HVAC-R and service water heating equipmentluis wongenergy_progress
05/03/2024Mechanical Systemsluis wongspecial
05/03/2024Finalluis wongprogress
05/11/2023Energy Code Compliance Inspections—progress
05/11/2023Fire-Resistance Rated Construction—progress
03/28/2023Footing and FoundationFei Zengprogress
03/28/2023Fire-Resistant Penetrations and Joints—special
03/28/2023Concrete - Cast-In-PlaceFei Zengspecial
03/28/2023FinalFei Zengprogress
▾Documents — 136 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch10
08/20/2026Q01046036-S1Request digital key ↗
08/20/2026Q01046036-P1Request digital key ↗
08/20/2026Q01046036-I1Request digital key ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlans/Sketch - Construction Fence1
08/27/2026Q00446736-I1Request digital key ↗
▸Applications & Permits13
▸BISPLAN / WORK APPROVAL APPLICATION11
01/27/2021440660367Open ↗
01/05/2021440660367Open ↗
05/12/2017421461279Open ↗
Showing 3 of 11 on file for this type
▸BISWORK PERMIT APPLICATION2
03/10/2021440660367Open ↗
05/12/2017421461279Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISZONING DIAGRAM2
05/04/2011420103364Open ↗
12/09/2010420103364Open ↗
▸BISTAX LOT- TENTATIVE LOT NUMBER ISSUED1
05/05/2011420103364Open ↗
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q00851376-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWProgress Inspector Seal & Signature14
09/01/2026Q01046036-P2Open ↗
09/01/2026Q01046036-P2Open ↗
09/01/2026Q01046036-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/20/2026Q01046036-P3Open ↗
08/20/2026Q01046036-P2Open ↗
08/20/2026Q01046036-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
07/25/2017421461279Open ↗
05/12/2017421461279Open ↗
03/25/2014420959699Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026Q01301567-I1Open ↗
09/01/2026Q01301567-I1Open ↗
08/31/2026Q01046036-P1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
03/09/2011420330127Open ↗
03/09/2011420330127Open ↗
03/09/2011420330127Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
05/18/2017421461279Open ↗
03/09/2011420330127Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/12/2017421461279Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
01/05/2021440660367Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING1
03/09/2011420330127Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
03/25/2014420959699Open ↗
▸Safety & Tenant Protection1
▸BISSTREET TREE CHECKLIST1
12/21/2010420103364Open ↗
▸Environmental & Asbestos17
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/20/2026Q01046036-P2Open ↗
08/20/2026Q01046036-P1Open ↗
08/20/2026Q01046036-S3Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
01/05/2021440660367Open ↗
05/12/2017421461279Open ↗
03/25/2014420959699Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
05/02/2011420103364Open ↗
03/09/2011420330127Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
03/09/2011420328023Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/12/2017421461279Open ↗
03/25/2014420959699Open ↗
03/25/2014420959699Open ↗
Showing 3 of 4 on file for this type
▸BISTR8: Energy Code Progress Inspections2
05/23/2014420959699Open ↗
05/23/2014420959699Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/25/2017421461279Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
04/14/2021440660367Open ↗
03/08/2021440660367Open ↗
01/07/2021440660367Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS5
05/12/2017421461279Open ↗
03/25/2014420959699Open ↗
03/09/2011420330127Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY - USE3
12/21/2010420103364Open ↗
12/06/2010420103364Open ↗
11/10/2010420103364Open ↗
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
04/14/2021440660367Open ↗
07/25/2017421461279Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/09/2011420328023Open ↗
▸Cost, Insurance & Ownership10
▸BISCOST AFFIDAVIT9
04/08/2021440660367Open ↗
01/05/2021440660367Open ↗
07/25/2017421461279Open ↗
Showing 3 of 9 on file for this type
▸BISCOST AFFIDAVIT ESTIMATE: (PW3)1
01/29/2021440660367Open ↗
▸Filing & Intake Forms8
▸BISEFILING COVER SHEET6
05/12/2017421461279Open ↗
03/25/2014420959699Open ↗
03/25/2014420959699Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
01/07/2021440660367Open ↗
▸BISADDITIONAL INFORMATION1
02/04/2021440660367Open ↗
▸Other Documents2
▸DOB NOWPlot Diagram1
08/13/2026Q00851376-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q00851376-I1Open ↗