6 Open Violations 3 unresolved · 3 paperwork only▸
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
DOB05/15/2014VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
DOB03/17/1995VP-VIOLATION UNSERVED ECB-ACTIVE
ECB04/17/1995OCCUPIED PREMISES CONTRARY TO DEPARTMENT OF BUILDINGS RECORDS: CERTIFICATE OF OCCUPANCY# 173.718--FROM: 2ND FLOOR DWELLING TO SOCIALCLUB. DBL-ZEUS SOCIAL CLUB. REMEDY: DISCONTINUE ILLEGAL OCCUPANCY--Nothing owed — awaiting certificate of correction
ECB04/03/1995WORK WITHOUT A PERMIT.WORK NOTED:IN CELLAR OF PREMISES SHEETROCK WALLSALSO BEEN ERECTED CREATING 4 ROOMS.ALSO A 3 PIECE BATHROOM AND KITCHENSINK HAVE BEEN INSTALLED.REMEDY:OBTAIN A PRMIT IF FEASIBLE OR RESTORENothing owed — awaiting certificate of correction
ECB04/03/1995OCCUPANCY CONTRARY TO THAT ALLOWED BY BLDG DEPT.RECORDS FROM A LEGAL CELLAR TO AN ILLEGAL CLASS"B"APT(3 PIECE BATHROOM INSTALLED-NO GAS ST-OVE)REMEDY:REMEDY:DISCONTINUE ILLEGAL USE OR AMEND THE C OF O.Nothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 1.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.