← Back
Large suburban residence
29-20 BUTLER STREET
QUEENS · East Elmhurst · BIN 4041575
💬 Discuss this project
1920Year Built
2.5Stories
A3Building Class
R3XZoning
2,996 sfGross Floor Area
1Units
2 Open Violations ▸
Large suburban residence · 6,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Attic6p · 2 filings · 19 docs
Floor 29p · 2 filings · 19 docs
Floor 16p · 2 filings · 19 docs
Cellar10p · 2 filings · 19 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCALHEK501/12/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A&A BUILDING CONSULTANTS INC.1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
VAGGELAS CONSTRUCTION GR*General Contractor603/21/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
CITY BUILDING CONSULTANTSGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCALHEK PC3340401/12/2023
AA BUILDING & INSPECTION1519205/27/2021
Building Lifecycle
All (34)Filed (5)Permit Issued (5)Signed Off (2)Violation (10)Inspection (6)Objection (2)Special Inspection (4)
11/25/2025
Violation issued (HPD, open)
I
12/04/2024
Violation issued (HPD, open)
I
02/02/2023
Signed off — Alteration
propose 2 pc bathroom in cellar ,washing machine, dryer, slop sink, 1 boiler, 1 hot water heater. Cap and remove bathroom in attic, cap and remove shower in cellar.
Q00515267-I1
01/18/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
01/12/2023
Filed — Alteration
propose 2 pc bathroom in cellar ,washing machine, dryer, slop sink, 1 boiler, 1 hot water heater. Cap and remove bathroom in attic, cap and remove shower in cellar.
Q00515267-P3
01/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
01/03/2023
Filed — Alteration
propose 2 pc bathroom in cellar ,washing machine, dryer, slop sink, 1 boiler, 1 hot water heater. Cap and remove bathroom in attic, cap and remove shower in cellar.
Q00515267-P2
01/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
12/21/2022
Permit issued — Plumbing
Q00515267-I1-PL
12/20/2022
Signed off — Alteration
Application file for renovation of existing 1 family dwelling
Q00515247-I1
12/16/2022
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/12/2022
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/16/2022
Filed — Alteration
propose 2 pc bathroom in cellar ,washing machine, dryer, slop sink, 1 boiler, 1 hot water heater. Cap and remove bathroom in attic, cap and remove shower in cellar.
Q00515267-P1
11/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
RAYMOND CALAMARI
05/05/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
05/02/2022
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
12/01/2021
Permit issued — General Construction
Q00515247-I1-GC
11/30/2021
Permit issued — Plumbing
Q00515267-I1-PL
10/06/2021
Permit issued — General Construction
Q00515247-I1-GC
09/21/2021
Permit issued — General Construction
Q00515247-I1-GC
06/24/2021
Objection raised — Other
06/24/2021
Objection resolved — Addressed
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/23/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/27/2021
Filed — Alteration
propose 2 pc bathroom in cellar ,washing machine, dryer, slop sink, 1 boiler, 1 hot water heater. Cap and remove bathroom in attic, cap and remove shower in cellar.
Q00515267-I1
05/27/2021
Filed — Alteration
Application file for renovation of existing 1 family dwelling
Q00515247-I1
04/02/2021
Violation issued (ECB, closed)
Construction
04/02/2021
Violation issued (ECB, closed)
Construction
04/02/2021
Violation issued (ECB, closed)
Construction
04/02/2021
Violation issued (ECB, closed)
Construction
04/02/2021
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP12/21/2022
DOB NOWGeneral ConstructionSigned-offCITY BUILDING CONSULTANTS12/01/2021
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP11/30/2021
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*10/06/2021
DOB NOWGeneral ConstructionSigned-offVAGGELAS CONSTRUCTION GR*09/21/2021
2 projects · most recent 07/12/2022
FiledStatusContractorScope
07/12/2022Permit IssuedISTRA ELEC'L CONTRS CORP2 meters
05/24/2022Permit IssuedISTRA ELEC'L CONTRS CORP1 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
12/16/2022Pass-Final General Construction Non-Directive 14PassView ↗
12/12/2022Fail-Final General Construction Non-Directive 14FailView ↗
05/05/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/05/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
05/02/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
01/18/2023Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
01/12/2023Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
01/03/2023Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
11/16/2022Fire-Resistant Penetrations and JointsRAYMOND CALAMARIspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/25/2026Q00515267-I1Request digital key ↗
08/25/2026Q00515267-P3Request digital key ↗
08/25/2026Q00515267-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/27/2026Q00515247-I1Open ↗
08/25/2026Q00515267-P3Open ↗
08/25/2026Q00515267-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/25/2026Q00515267-P3Open ↗
08/26/2026Q00515267-P1Open ↗
08/25/2026Q00515267-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/25/2026Q00515267-P3Open ↗
08/25/2026Q00515267-P2Open ↗
08/25/2026Q00515267-P1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026Q00515247-I1Open ↗