Elevator apt, fireproof with stores
29-26 40 AVENUE
QUEENS · BIN 4004870
💬 Discuss this project
2024Year Built
12Stories
D6Building Class
M1-3/R7XZoning
165,002 sfGross Floor Area
110Units
1 Open Violation 0 unresolved · 1 paperwork only ▸
Elevator apt, fireproof with stores · Owner of record: LIC 40TH AVENUE OWNER LLC · 25,910 sf lot · 6.37 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction39p · 1 filing · 20 docs
Floor 12Under Construction37p · 1 filing · 20 docs
Floor 11Under Construction36p · 1 filing · 20 docs
Floor 10Under Construction36p · 1 filing · 20 docs
Floor 9Under Construction36p · 1 filing · 20 docs
Floor 8Under Construction36p · 1 filing · 20 docs
Floor 7Under Construction42p · 1 filing · 20 docs
Floor 6Under Construction41p · 1 filing · 20 docs
Floor 5Under Construction41p · 1 filing · 20 docs
Floor 4Under Construction41p · 1 filing · 20 docs
Floor 3Under Construction42p · 1 filing · 20 docs
Floor 2Under Construction43p · 1 filing · 20 docs
Floor 1Under Construction45p · 1 filing · 20 docs
CellarUnder Construction44p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SBGC10009/01/2026
SKYLINE SCAFFOLDING GROUP1007/08/2026
ALBA SERVICES INC1103/22/2026
LIC 40TH ENTERPRISE1103/22/2026
TRI BOROUGH SCAFFOLDING103/22/2026
1 OAK CONTRACTING103/22/2026
LIC 40TH AVENUE OWNER603/21/2026
KAL REALTY903/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/28/2015$11.0M—— → —— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A1 EXPEDITING SERVICE803/21/2026
WILLIAM VITACCO ASSOCIATES4603/21/2026
AVALON DESIGNS203/21/2026
KD DESIGNS103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SBGC LLCGeneral Contractor1807/08/2026
LIC 40TH ENTERPRISE LLCGeneral Contractor1407/08/2026
PRIME PIPING & HEATING INPlumbing707/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor507/08/2026
ALBA SERVICES INCGeneral Contractor403/21/2026
TRI BOROUGH SCAFFOLDINGGeneral Contractor303/21/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
SOLAS ELECTRICAL CORPElectrical103/22/2026
M.R. ELEC'L SERVICE LLCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
DELTA TESTING LABS6871906/23/2026
ATLAS ATC ENGINEERING INC8011303/24/2026
ATLANTIC ENGINEERINGLABOR1381102/06/2024
Building Lifecycle
All (227)Filed (34)Permit Issued (32)Signed Off (4)Violation (56)Inspection (28)Objection (40)Special Inspection (30)Tax Incentive (3)
06/13/2031
421-a(16) construction completed
07/23/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/01/2026
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
07/01/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/29/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/25/2026
Special inspection requirement — Shutoff dampers
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Lighting controls
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Interior lighting power
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Metering
RICHARD GREENWALD
06/25/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Final
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Mechanical Systems
RICHARD GREENWALD
06/25/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Electrical motors and elevators
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Maintenance information
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Lighting in dwelling units
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Exterior lighting power
RICHARD GREENWALD
06/25/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
06/25/2026
Special inspection requirement — Duct leakage testing, insulation and design
RICHARD GREENWALD
06/23/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A6
06/17/2026
Violation issued (ECB, closed)
Construction
06/17/2026
Violation issued (ECB, closed)
Construction
06/08/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A9
06/04/2026
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
06/04/2026
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
06/01/2026
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
06/01/2026
Special inspection requirement — Emergency and Standby Power Systems (Generator)
05/20/2026
Violation issued (ECB, closed)
Unknown
05/20/2026
Violation issued (ECB, closed)
Unknown
05/20/2026
Violation issued (ECB, closed)
Unknown
05/12/2026
Permit issued — Sprinklers
Q00682330-Z5-EW-SD
04/24/2026
Inspection — Pass-Final PL - Underground
Pass
View inspection ↗
04/03/2026
Violation issued (ECB, open)
Construction
04/03/2026
Violation issued (ECB, closed)
Construction
03/31/2026
Permit issued — Sprinklers
Q00682330-Z5-EW-SP
03/31/2026
Permit issued — Plumbing
Q00682330-Z4-PL
03/25/2026
Special inspection requirement — Deep Foundation Elements
RONALD GRAPIN
03/25/2026
Special inspection requirement — Concrete - Cast-In-Place
RONALD GRAPIN
03/25/2026
Special inspection requirement — Footing and Foundation
RONALD GRAPIN
03/25/2026
Special inspection requirement — Final
RONALD GRAPIN
03/24/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A8
03/20/2026
Permit issued — Mechanical Systems
Q00682330-Z3-MS
03/17/2026
Permit issued — Support of Excavation
Q00682330-Z2-SE
03/16/2026
Permit issued — Construction Fence
Q00798527-I1-FN
03/09/2026
Special inspection requirement — Maintenance information
RICHARD GREENWALD
03/09/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
RICHARD GREENWALD
03/09/2026
Special inspection requirement — HVAC-R and service water heating system controls
RICHARD GREENWALD
03/09/2026
Special inspection requirement — HVAC-R and service water heating equipment
RICHARD GREENWALD
03/09/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
RICHARD GREENWALD
03/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
RICHARD GREENWALD
03/03/2026
Special inspection requirement — Sprinkler Systems
RICHARD GREENWALD
03/03/2026
Special inspection requirement — Standpipe Systems
RICHARD GREENWALD
02/26/2026
Special inspection requirement — Final
RONALD GRAPIN
02/23/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A5
02/23/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A3
02/23/2026
Filed — New Building
Install new curb cut for New building
Q00682330-A4
02/05/2026
Objection resolved — Addressed
01/07/2026
Signed off — Alteration
EQUIPMENT USE: DUAL 7000 # CAPACITY PERSONNEL/MATERIAL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q01124838-I1
Latest 60 of 227 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN05/12/2026
DOB NOWSprinklersPermit IssuedPRIME PIPING & HEATING IN03/31/2026
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN03/31/2026
DOB NOWMechanical SystemsPermit IssuedLIC 40TH ENTERPRISE03/20/2026
DOB NOWSupport of ExcavationPermit IssuedLIC 40TH ENTERPRISE03/17/2026
DOB NOWConstruction FencePermit IssuedLIC 40TH ENTERPRISE03/16/2026
DOB NOWGeneral ConstructionPermit IssuedLIC 40TH ENTERPRISE12/16/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/15/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP04/29/2025
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN03/05/2025
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN03/05/2025
DOB NOWStandpipePermit IssuedPRIME PIPING & HEATING IN03/05/2025
DOB NOWMechanical SystemsPermit IssuedLIC 40TH ENTERPRISE02/25/2025
DOB NOWConstruction FencePermit IssuedLIC 40TH ENTERPRISE01/27/2025
DOB NOWStructuralSigned-offLIC 40TH ENTERPRISE01/21/2025
DOB NOWFoundationSigned-offLIC 40TH ENTERPRISE01/21/2025
DOB NOWGeneral ConstructionPermit IssuedLIC 40TH ENTERPRISE01/21/2025
DOB NOWSupport of ExcavationPermit IssuedLIC 40TH ENTERPRISE01/17/2025
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/23/2024
DOB NOWStructuralSigned-offSBGC LLC09/11/2024
DOB NOWSupport of ExcavationPermit IssuedSBGC LLC08/30/2024
DOB NOWFoundationSigned-offSBGC LLC08/21/2024
DOB NOWStructuralSigned-offSBGC LLC07/22/2024
DOB NOWGeneral ConstructionPermit IssuedSBGC LLC07/16/2024
DOB NOWGeneral ConstructionPermit IssuedSBGC LLC06/25/2024
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC05/22/2024
DOB NOWPlumbingPermit IssuedPRIME PIPING & HEATING IN03/07/2024
DOB NOWConstruction FencePermit IssuedSBGC LLC02/06/2024
DOB NOWConstruction FencePermit IssuedALBA SERVICES INC01/31/2023
DOB NOWSidewalk ShedSigned-offTRI BOROUGH SCAFFOLDING12/27/2022
DOB NOWConstruction FenceSigned-offALBA SERVICES INC12/09/2022
DOB NOWFoundationPermit IssuedSBGC LLC05/13/2022
BIS—ISSUEDALBA SERVICES INC05/19/2023
BISEQISSUEDALBA SERVICES INC02/02/2023
BIS—ISSUEDALBA SERVICES INC02/02/2023
BISOTISSUEDMC SUPERSTRUCTURE INC05/27/2014
BISMHISSUEDDLM CONTRACTORS INC09/13/2012
BISOTISSUEDJJSL DEVELOPMENT INC02/17/2012
BISBLISSUEDLEONARD SIBRIZZI01/13/2006
BISFSISSUEDK.B. INSTALLATIONS02/24/2000
+ 2 more permits on file
1 project · most recent 06/23/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026Permit IssuedLIC 40TH ENTERPRISE LLCAir Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Daikin FTK24NMVJU 15,800 BTU · Split System ×1
RK24NMVJU 21,200 BTU · Condensing Unit ×1
RK24BXVJU 21,200 BTU · Condensing Unit ×2
Heat / Cool
Daikin RXTQ36TAVJ9 36,000 BTU · Vrf Outdoor ×190
REYQ168XATJU 147,594 BTU · Vrf Outdoor ×3
REYQ168XBTJA 147,594 BTU · Vrf Outdoor ×2
REYQ96XBTJA 166,280 BTU · Vrf Outdoor ×2
REQX96XBTJA 166,280 BTU · Vrf Outdoor ×1
Mitsubishi Electric PEFY-P24NMAU-E4 23,989 BTU · Vrf Indoor ×9
PEFY-P48NMAU-E4 48,011 BTU · Vrf Indoor ×7
PKFY-P18NLMU-E 18,000 BTU · Vrf Indoor ×3
Aaon RN-15 3,650,000 BTU · Rooftop Unit ×2
Ventilation
Greenheck AX-54-190-0410-M50 12,000 CFM · Exhaust Fan ×2
1 project · most recent 06/23/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
06/23/2026Permit IssuedA M B MECHANICAL INCGas, Storm, Water/Sanitary
8 projects · most recent 11/12/2025
General Wiring
FiledStatusContractorScope
11/12/2025Permit IssuedDENALI ELECTRIC CORP—
11/12/2025Permit IssuedDENALI ELECTRIC CORP—
02/10/2025Permit IssuedM.R. ELEC'L SERVICE LLCGeneral Wiring
10/15/2024Permit IssuedM.R. ELEC'L SERVICE LLC1 meters, 1 new_meters
08/08/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
08/08/2024Permit IssuedSTAR ELEC'L CONTRACTORS C—
08/01/2024Permit IssuedTOP SHELF ELECTRIC CORP—
12/29/2022CompleteSOLAS ELECTRICAL CORP—
1 project · most recent 06/23/2026
Concrete
FiledStatusContractorScope
06/23/2026Permit IssuedA M B MECHANICAL INCConcrete
1 project · most recent 01/23/2023
Fence
FiledStatusContractorScope
01/23/2023Permit IssuedLIC 40TH ENTERPRISE LLCFence
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
07/23/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/01/2026Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
07/01/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/29/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/04/2026Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
06/04/2026Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
06/01/2026Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
04/24/2026Pass-Final PL - UndergroundPassView ↗
08/26/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/16/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/18/2025Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
01/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
11/05/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
11/05/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
09/27/2024Pass-Final PL - UndergroundPassView ↗
07/22/2024Pass-Final PL - UndergroundPassView ↗
07/08/2024Pass-Final PL - UndergroundPassView ↗
01/31/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/31/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/05/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/20/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 101
DateRequirementInspectorRole
06/25/2026FinalRICHARD GREENWALDprogress
06/25/2026Fire-Resistant Penetrations and JointsRICHARD GREENWALDspecial
06/25/2026Maintenance informationRICHARD GREENWALDenergy_progress
06/25/2026Lighting controlsRICHARD GREENWALDenergy_progress
06/25/2026Shutoff dampersRICHARD GREENWALDenergy_progress
06/25/2026Duct leakage testing, insulation and designRICHARD GREENWALDenergy_progress
06/25/2026Emergency and Standby Power Systems (Generator)RICHARD GREENWALDspecial
06/25/2026Mechanical SystemsRICHARD GREENWALDspecial
06/25/2026MeteringRICHARD GREENWALDenergy_progress
06/25/2026Exterior lighting powerRICHARD GREENWALDenergy_progress
06/25/2026Lighting in dwelling unitsRICHARD GREENWALDenergy_progress
06/25/2026Electrical motors and elevatorsRICHARD GREENWALDenergy_progress
06/25/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
06/25/2026Interior lighting powerRICHARD GREENWALDenergy_progress
06/25/2026HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
06/25/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
06/01/2026Emergency and Standby Power Systems (Generator)—special
03/25/2026Concrete - Cast-In-PlaceRONALD GRAPINspecial
03/25/2026FinalRONALD GRAPINprogress
03/25/2026Deep Foundation ElementsRONALD GRAPINspecial
03/25/2026Footing and FoundationRONALD GRAPINprogress
03/09/2026HVAC-R and service water heating equipmentRICHARD GREENWALDenergy_progress
03/09/2026HVAC-R and service water heating system controlsRICHARD GREENWALDenergy_progress
03/09/2026HVAC-R and service water piping design and insulationRICHARD GREENWALDenergy_progress
03/09/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRICHARD GREENWALDspecial
Latest 25 of 101.
▾Documents — 290 on file (BIS + DOB NOW)
▸Plans & Drawings36
▸DOB NOWPlans/Sketch36
08/25/2026Q08051731-I1Request digital key ↗
08/25/2026Q00798527-I1Request digital key ↗
08/24/2026Q08055687-P1Request digital key ↗
Showing 3 of 36 on file for this type
▸Applications & Permits15
▸BISPLAN / WORK APPROVAL APPLICATION7
07/02/2024440715718Open ↗
12/20/2022421810240Open ↗
09/20/2022421810240Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION6
08/10/2023421810240Open ↗
03/30/2023421810240Open ↗
03/30/2023421810240Open ↗
Showing 3 of 6 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
07/23/2024440715718Open ↗
05/24/2022440715718Open ↗
▸Zoning, Tax Lot & Property Records13
▸DOB NOWZD1: DOB Zoning Diagram6
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWZoning Exhibit form (1-5)6
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-A9Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026Q00682330-I1Open ↗
▸Seals & Professional Certifications122
▸DOB NOWProgress Inspector Seal & Signature51
09/27/2026Q00682330-Z3Open ↗
09/27/2026Q00682330-Z3Open ↗
09/27/2026Q00682330-Z3Open ↗
Showing 3 of 51 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature33
08/25/2026Q00798527-I1Open ↗
08/24/2026Q08055687-P1Open ↗
08/24/2026Q08055687-I1Open ↗
Showing 3 of 33 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature26
09/27/2026Q00682330-Z3Open ↗
09/27/2026Q00682330-Z3Open ↗
09/02/2026Q00682330-A5Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
06/10/2014420946418Open ↗
02/18/2014420946418Open ↗
09/24/2012420595797Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
02/18/2014420946418Open ↗
02/17/2011420323698Open ↗
▸BISProfessional and Owner Certification (POC3)1
02/17/2011420323698Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
02/18/2014420946418Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
05/24/2022440715718Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
05/24/2022440715718Open ↗
▸Trade Schedules & Equipment10
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-P9Open ↗
08/16/2026Q00682330-I1Open ↗
Showing 3 of 5 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
10/09/2012420595797Open ↗
10/09/2012420595797Open ↗
▸BISGAS CUT-OFF1
03/30/2023421810240Open ↗
▸BISSEWER CUT-OFF1
03/30/2023421810240Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/16/2026Q00682330-I1—
▸Safety & Tenant Protection14
▸DOB NOWStreet Tree Checklist6
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-A9Open ↗
Showing 3 of 6 on file for this type
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
08/10/2023421810240Open ↗
03/30/2023421810240Open ↗
▸BISSTREET TREES SITE PLAN1
07/22/2024440715718Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
07/22/2024440715718Open ↗
▸BISSTREET TREE CHECKLIST1
07/24/2012420595797Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
03/30/2023421810240Open ↗
▸DOB NOWStreet Trees Site Plan1
08/16/2026Q00682330-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/16/2026Q00682330-I1Open ↗
▸Environmental & Asbestos22
▸DOB NOWOER: Notice to Proceed16
08/16/2026Q00682330-S9Open ↗
08/16/2026Q00682330-S8Open ↗
08/16/2026Q00682330-S3Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
08/10/2023421810240Open ↗
03/30/2023421810240Open ↗
07/24/2012420595797Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
02/17/2011420323698Open ↗
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
07/22/2024440715718Open ↗
▸DOB NOWOER: Notice of Satisfaction1
08/16/2026Q00682330-S9Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
02/18/2014420946418Open ↗
09/27/2012420595797Open ↗
09/14/2012420595797Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
09/17/2012420595797Open ↗
09/14/2012420595797Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY1
05/24/2022440715718Open ↗
▸DOB NOWConcrete Testing Exception Report1
08/16/2026Q00682330-S3Open ↗
▸Approvals, Objections & Sign-offs16
▸BISLETTERS - SUPPORTING DOCUMENTATION7
08/10/2023421810240Open ↗
08/10/2023421810240Open ↗
03/30/2023421810240Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
07/09/2014420946418Open ↗
10/09/2012420595797Open ↗
08/28/2012420323698Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
02/18/2014420946418Open ↗
07/24/2012420595797Open ↗
02/17/2011420323698Open ↗
▸DOB NOWSupersede Letter2
08/16/2026Q00682330-S9Open ↗
08/16/2026Q00682330-A8Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
03/30/2023421810240Open ↗
▸Cost, Insurance & Ownership9
▸BISCOST AFFIDAVIT6
06/10/2014420946418Open ↗
02/18/2014420946418Open ↗
09/17/2012420595797Open ↗
Showing 3 of 6 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE2
08/10/2023421810240Open ↗
03/30/2023421810240Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
08/10/2023421810240Open ↗
▸Filing & Intake Forms10
▸BISEFILING COVER SHEET5
12/20/2022421810240Open ↗
09/20/2022421810240Open ↗
02/18/2014420946418Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION3
08/10/2023421810240Open ↗
08/10/2023421810240Open ↗
02/16/2012420323698Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
05/24/2022440715718Open ↗
▸BISSRO INTAKE FORM(SRO1)1
03/30/2023421810240Open ↗
▸Other Documents16
▸DOB NOWProperty Ownership Certification5
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-P9Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial4
08/16/2026Q00682330-I1Open ↗
08/16/2026Q00682330-A9Open ↗
08/16/2026Q00682330-P9Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/16/2026Q00682330-Z2Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/16/2026Q00682330-I1Open ↗