← Back
Multi-story retail building (2+)
Cooper Union Building
29 3 AVENUE · BIN 1006737
💬 Discuss this project
1920Year Built
15Stories
K2Building Class
C6-1Zoning
18,164 sfGross Floor Area
6Units
Rent Stabilized
Multi-story retail building (2+) · 8,775 sf lot · 2.07 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
Roof9p · 4 filings · 20 docs
Floor 174p · 3 filings · 20 docs
Floor 16
Floor 15
Floor 14
Floor 13
Floor 12
Floor 11
Floor 10
Floor 9
Floor 8
Floor 7
Floor 6
Floor 5
Floor 4
Floor 3
Floor 2Under Construction20p · 4 filings · 20 docs
Floor 14p · 2 filings · 20 docs
Cellar4p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ABLE ARCHITECTS LLC508/24/2026
AZA ENGINEERING LLC1006/09/2025
METHOD DESIGN ARCHITECTURE AND URBA105/19/2025
OLD STRUCTURES ENGINEERING107/23/2024
Building Lifecycle
All (11)Permit Issued (11)
07/24/2026
Permit issued — General Construction
M01178499-I1-GC
07/02/2026
Permit issued — Sprinklers
M01178499-S1-EW-SP
04/15/2026
Permit issued — Plumbing
M01178499-S3-PL
02/11/2026
Permit issued — General Construction
M01178499-I1-GC
05/09/2025
Permit issued — Boiler Equipment
M00760623-I1-BE
03/14/2025
Permit issued — Mechanical Systems
M00758048-I1-MS
03/19/2024
Permit issued — Mechanical Systems
M00758048-I1-MS
09/13/2023
Permit issued — Plumbing
M00758069-I1-PL
09/08/2023
Permit issued — Boiler Equipment
M00760623-I1-BE
05/10/2023
Permit issued — Mechanical Systems
M00758048-I1-MS
11/14/2022
Permit issued — Mechanical Systems
M00758048-I1-MS
Nothing on file for this building.
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/04/2026Pass-Final SP - Up to 3 Requested FloorsPassView ↗
08/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
08/26/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/05/2025Pass-Final Boiler Equipment InspectionPassView ↗
10/16/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/07/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
07/17/2026Sprinkler SystemsJINN HWANGspecial
07/17/2026Tenant Protection Plan Compliance—special
11/21/2025Fire-Resistant Penetrations and JointsJINN HWANGspecial
09/13/2025FinalJINN HWANGprogress
09/13/2025Mechanical SystemsJINN HWANGspecial
05/30/2025HVAC-R and service water heating equipmentArtem Zolotarevenergy_progress
05/30/2025Maintenance informationArtem Zolotarevenergy_progress
05/30/2025HVAC-R and service water piping design and insulationArtem Zolotarevenergy_progress
05/30/2025Heating SystemsArtem Zolotarevspecial
05/30/2025HVAC-R and service water heating system controlsArtem Zolotarevenergy_progress
05/14/2025Maintenance informationArtem Zolotarevenergy_progress
05/14/2025HVAC-R and service water piping design and insulationArtem Zolotarevenergy_progress
05/14/2025HVAC-R and service water heating equipmentArtem Zolotarevenergy_progress
05/14/2025HVAC-R and service water heating system controlsArtem Zolotarevenergy_progress
05/14/2025Heating SystemsArtem Zolotarevspecial
09/20/2024Heating SystemsArtem Zolotarevspecial
09/20/2024Mechanical SystemsArtem Zolotarevspecial
09/20/2024Energy Code Compliance InspectionsArtem Zolotarevprogress
09/20/2024FinalArtem Zolotarevprogress
09/20/2024Maintenance informationArtem Zolotarevenergy_progress
09/20/2024HVAC-R and service water heating equipmentArtem Zolotarevenergy_progress
09/20/2024HVAC-R and service water piping design and insulationArtem Zolotarevenergy_progress
09/20/2024HVAC-R and service water heating system controlsArtem Zolotarevenergy_progress
09/09/2024HVAC-R and service water piping design and insulationArtem Zolotarevenergy_progress
09/09/2024Heating SystemsArtem Zolotarevspecial
Latest 25 of 51.
Nothing on file for this building.