← Back
Two stories - detached, small or mid-size
29-39 214 PLACE
QUEENS · Bayside · BIN 4134758
💬 Discuss this project
1970Year Built
2Stories
A1Building Class
R1-2Zoning
3,434 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.57 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/01/2014$1.2M—Private party → Private party$364/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GREEN RIVER ENVIRONMENTAL ENGINEERI111/29/2024
A & T ENGINEERING, P.C.303/31/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S Y CONSULTING VIOLATIONS603/21/2026
NY State Solar LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSS LLCGeneral Contractor107/08/2026
STONE REMODELING, INCGeneral Contractor107/08/2026
CROWN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GREEN RIVER ENVIRONMENTAL7841111/29/2024
A & T DESIGN GROUP LLC1088303/31/2022
Building Lifecycle
All (28)Filed (4)Permit Issued (3)Signed Off (3)Inspection (3)Objection (4)Special Inspection (11)
04/15/2025
Signed off — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01149105-I1
12/03/2024
Permit issued — Solar
Q01149105-I1-SL
11/29/2024
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS
Q01149105-I1
11/29/2024
Special inspection requirement — Air barrier - visual inspection
ROBERT MASONE
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
11/29/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
11/29/2024
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
11/29/2024
Special inspection requirement — Final
ROBERT MASONE
04/28/2023
Signed off — Alteration
propose perforated pipe and retaining wall to resolve storm retention issue. no change of use, occupancy or egress
Q00646713-I1
04/27/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/16/2022
Signed off — Alteration
propose perforated pipe and retaining wall to resolve storm retention issue. no change of use, occupancy or egress
Q00646713-S1
04/26/2022
Inspection — Certified Storm Drainage-ST-Fixtures-Finish
Certified
View inspection ↗
04/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/21/2022
Permit issued — Plumbing
Q00646713-S1-PL
04/05/2022
Permit issued — Earth Work
Q00646713-I1-GC-CX
03/31/2022
Filed — Alteration
propose perforated pipe and retaining wall to resolve storm retention issue. no change of use, occupancy or egress
Q00646713-S1
03/31/2022
Special inspection requirement — Footing and Foundation
ROBERT LIN
03/31/2022
Special inspection requirement — Subgrade Inspections
ROBERT LIN
03/31/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
03/31/2022
Special inspection requirement — Concrete - Cast-In-Place
ROBERT LIN
03/31/2022
Special inspection requirement — Final
ROBERT LIN
03/29/2022
Filed — Alteration
propose perforated pipe and retaining wall to resolve storm retention issue. no change of use, occupancy or egress
Q00646713-P1
03/28/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
ROBERT LIN
01/02/2022
Objection raised — Inspections
01/02/2022
Objection resolved — Addressed
01/02/2022
Objection raised — Scope
01/02/2022
Objection resolved — Addressed
12/23/2021
Filed — Alteration
propose perforated pipe and retaining wall to resolve storm retention issue. no change of use, occupancy or egress
Q00646713-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYSS LLC12/03/2024
DOB NOWPlumbingSigned-offCROWN PLUMBING INC04/21/2022
DOB NOWEarth WorkSigned-offSTONE REMODELING, INC04/05/2022
1 project · most recent 10/29/2024
FiledStatusContractorScope
10/29/2024CompleteNY SOLAR ELECTRICAL LLC—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/27/2023Pass-Final General Construction Non-Directive 14PassView ↗
04/26/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
04/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 11
DateRequirementInspectorRole
11/29/2024Air barrier - visual inspectionROBERT MASONEenergy_progress
11/29/2024Fire-Resistant Penetrations and JointsROBERT MASONEspecial
11/29/2024Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
11/29/2024Energy Code Compliance InspectionsROBERT MASONEprogress
11/29/2024FinalROBERT MASONEprogress
03/31/2022Footing and FoundationROBERT LINprogress
03/31/2022Subgrade InspectionsROBERT LINspecial
03/31/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
03/31/2022Concrete - Cast-In-PlaceROBERT LINspecial
03/31/2022FinalROBERT LINprogress
03/28/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationROBERT LINspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/26/2026Q00646713-P1Request digital key ↗
08/26/2026Q00646713-S1Request digital key ↗
08/21/2026Q01149105-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/13/2026Q00646713-P1Open ↗
08/13/2026Q00646713-S1Open ↗
08/13/2026Q00646713-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/27/2026Q01149105-I1Open ↗
08/27/2026Q01149105-I1Open ↗
08/25/2026Q00646713-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026Q00646713-S1Open ↗
08/27/2026Q01149105-I1Open ↗
08/25/2026Q00646713-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01149105-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWSOIL REPORT2
08/13/2026Q00646713-P1Open ↗
08/13/2026Q00646713-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01149105-I1Open ↗
▸Other Documents1
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00646713-I1Open ↗