← Back
Two stories - detached, small or mid-size
29-50 214 PLACE
QUEENS · BIN 4134734
💬 Discuss this project
1940Year Built
2Stories
A1Building Class
R1-2Zoning
1,080 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,121 sf lot · 0.18 FAR built · Flood zone X
Locations of Work
Architecture
Cellar1p · 1 filing · 19 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/23/2021$1.7M—Private party → Private party$1,593/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTS RULE PC408/19/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LC EXPEDITING SERVICES803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZOEM BUILDERS INCGeneral Contractor407/08/2026
YOST&CAMPBELL OFROCKLANDPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHTECTS' RULE, P.C.3465201/17/2024
Building Lifecycle
All (20)Filed (4)Permit Issued (3)Signed Off (3)Inspection (3)Special Inspection (7)
09/17/2024
Signed off — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-S1
08/29/2024
Signed off — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-S2
08/19/2024
Filed — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-P2
04/30/2024
Signed off — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-I1
03/21/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/07/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
02/26/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
01/26/2024
Permit issued — Plumbing
Q00981681-S1-PL
01/22/2024
Permit issued — General Construction
Q00981681-I1-GC
01/22/2024
Permit issued — Mechanical Systems
Q00981681-S2-MS
01/17/2024
Filed — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-S1
01/17/2024
Filed — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-S2
01/17/2024
Filed — Alteration
REPLACEMENT OF FURNACE IN CELLAR (NO NEW GAS PIPING) WITH MINOR PARTITION WORK. NO CHANGE OF USE, EGRESS, OR OCCUPANCY.
Q00981681-I1
01/12/2024
Special inspection requirement — Final
Paul Athineos
01/12/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Paul Athineos
01/12/2024
Special inspection requirement — HVAC-R and service water heating equipment
Paul Athineos
01/12/2024
Special inspection requirement — Mechanical Systems
Paul Athineos
01/12/2024
Special inspection requirement — HVAC-R and service water heating system controls
Paul Athineos
01/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Paul Athineos
01/11/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Athineos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offYOST&CAMPBELL OF ROCKLAND01/26/2024
DOB NOWGeneral ConstructionSigned-offZOEM BUILDERS INC01/22/2024
DOB NOWMechanical SystemsSigned-offZOEM BUILDERS INC01/22/2024
2 projects · most recent 01/31/2024
General Wiring
FiledStatusContractorScope
01/31/2024CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
08/15/2023CompleteYORK ELEC'L CONTR'S INC.—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/21/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/07/2024Pass-Final General Construction Non-Directive 14PassView ↗
02/26/2024Fail-Final General Construction Non-Directive 14FailView ↗
▾Special Inspection Requirements (DOB NOW) — 7
DateRequirementInspectorRole
01/12/2024FinalPaul Athineosprogress
01/12/2024HVAC-R and service water piping design and insulationPaul Athineosenergy_progress
01/12/2024HVAC-R and service water heating equipmentPaul Athineosenergy_progress
01/12/2024Mechanical SystemsPaul Athineosspecial
01/12/2024HVAC-R and service water heating system controlsPaul Athineosenergy_progress
01/11/2024Structural Stability – Alterations of existing buildingsPaul Athineosspecial
01/11/2024Fire-Resistant Penetrations and JointsPaul Athineosspecial
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/23/2026Q00981681-S1Request digital key ↗
08/23/2026Q00981681-I1Request digital key ↗
08/23/2026Q00981681-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications11
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/23/2026Q00981681-P2Open ↗
08/23/2026Q00981681-S1Open ↗
08/23/2026Q00981681-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/22/2026Q00981681-S2Open ↗
08/22/2026Q00981681-S2Open ↗
08/22/2026Q00981681-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026Q00981681-I1Open ↗
09/02/2026Q00981681-I1Open ↗
08/22/2026Q00981681-S2Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/23/2026Q00981681-S1Open ↗
08/23/2026Q00981681-S2Open ↗
08/23/2026Q00981681-I1Open ↗
Showing 3 of 4 on file for this type