← Back
Large suburban residence
29-56 214 PLACE
QUEENS · BIN 4134735
💬 Discuss this project
1940Year Built
2Stories
A3Building Class
R1-2Zoning
4,167 sfGross Floor Area
1Units
Large suburban residence · 10,956 sf lot · 0.38 FAR built · Flood zone X
Locations of Work
StructuralMechanical
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/15/2021$1.7M—Private party → Private party$415/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AMERILAND BROOK LLC710/18/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TT&T CONSTRUCTION INCGeneral Contractor803/21/2026
WATSON'S PLBG, HTG, & BDGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AMERILAND BROOK LLC1506510/18/2023
Building Lifecycle
All (64)Filed (7)Permit Issued (5)Signed Off (4)Inspection (8)Objection (10)Special Inspection (30)
01/08/2024
Signed off — Alteration CO
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRESS
Q00730486-I1
12/27/2023
Signed off — Alteration
Q00769468-I1
12/27/2023
Signed off — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00730486
Q00759434-I1
12/07/2023
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/29/2023
Signed off — Alteration CO
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRESS
Q00730486-S1
11/29/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/20/2023
Permit issued — Curb Cut
Q00769468-I1-CC
10/23/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
10/23/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
10/23/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
10/23/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
10/23/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
10/18/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00730486
Q00759434-P2
10/12/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/11/2023
Filed — Alteration
FILE PL WORKTYPE IN CONJUNCTION WITH JOB#Q00730486
Q00759434-P1
10/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
10/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIAOHONG ZHAO
10/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
10/10/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
10/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/21/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/18/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
TONY ONYEAGORO
08/18/2023
Special inspection requirement — Energy Code Compliance Inspections
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Fire-Resistance Rated Construction
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Structural Wood Frame
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Chimneys and vents
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Heating Systems
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Insulation placement and R values
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Duct leakage testing, insulation and design
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Maintenance information
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Ventilation and air distribution system
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Interior lighting power
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — HVAC-R and service water heating system controls
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Air barrier — testing
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — HVAC-R and service water heating equipment
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Final
XIAOHONG ZHAO
08/18/2023
Special inspection requirement — Concrete - Cast-In-Place
XIAOHONG ZHAO
08/15/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
08/15/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/10/2023
Objection resolved — Addressed
08/08/2023
Objection raised — Admin
08/08/2023
Objection raised — Fire_Protection
08/08/2023
Objection raised — Other
08/08/2023
Objection raised — Inspections
08/08/2023
Objection raised — Zoning
08/04/2023
Filed — Alteration CO
INSTALL 8' CONSTRUCTION FENCE AT ABOVE ADDRESS
Q00730486-P1
07/12/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/09/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
01/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/09/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/09/2022
Permit issued — Foundation
Q00730486-I1-GC-CX
10/28/2022
Permit issued — Plumbing
Q00759434-I1-PL
10/11/2022
Permit issued — Construction Fence
Q00730486-S1-FN
10/11/2022
Permit issued — Mechanical Systems
Q00730486-I1-GC-CX
Latest 60 of 64 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offTT&T CONSTRUCTION INC11/20/2023
DOB NOWFoundationPermit IssuedTT&T CONSTRUCTION INC11/09/2022
DOB NOWPlumbingSigned-offWATSON'S PLBG, HTG, & BDG10/28/2022
DOB NOWConstruction FenceSigned-offTT&T CONSTRUCTION INC10/11/2022
DOB NOWMechanical SystemsPermit IssuedTT&T CONSTRUCTION INC10/11/2022
BISOTISSUEDEMPOWER CES LLC03/22/2023
1 project · most recent 08/04/2023
Associated Ducts and Piping Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
08/04/2023Permit IssuedTT&T CONSTRUCTION INCAssociated Ducts and Piping, Heating Systems
Heating
Williamson GWA-140 140,000 BTU · Boiler ×1
Ducts & Piping
Delta Breeze SLIM50 50 CFM · Exhaust Fan ×5
Air King EB30BL 130 CFM · Kitchen Exhaust ×1
2 projects · most recent 12/04/2023
General Wiring
FiledStatusContractorScope
12/04/2023CompleteAL-LECTRIC ELECT'L CONTRGGeneral Wiring
04/23/2023CompleteISLAND ELECTRIC CORP—
1 project · most recent 08/04/2023
Wood
FiledStatusContractorScope
08/04/2023Permit IssuedTT&T CONSTRUCTION INCWood
1 project · most recent 08/04/2023
Fence
FiledStatusContractorScope
08/04/2023Permit IssuedTT&T CONSTRUCTION INCFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
12/07/2023Pass-Final Curb Cut Non-Directive 14PassView ↗
11/29/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
07/12/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/09/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
01/09/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 68
DateRequirementInspectorRole
10/23/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
10/23/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
10/23/2023Maintenance informationXIAOHONG ZHAOenergy_progress
10/23/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
10/23/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
10/10/2023Maintenance informationXIAOHONG ZHAOenergy_progress
10/10/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
10/10/2023HVAC-R and service water piping design and insulationXIAOHONG ZHAOenergy_progress
10/10/2023HVAC-R and service water heating equipmentXIAOHONG ZHAOenergy_progress
10/10/2023Fire-Resistant Penetrations and JointsXIAOHONG ZHAOspecial
08/18/2023Excavations - Sheeting, Shoring, and BracingXIAOHONG ZHAOspecial
08/18/2023Structural Wood FrameXIAOHONG ZHAOprogress
08/18/2023Energy Code Compliance InspectionsXIAOHONG ZHAOprogress
08/18/2023Fire-Resistance Rated ConstructionXIAOHONG ZHAOprogress
08/18/2023FinalXIAOHONG ZHAOprogress
08/18/2023Footing and FoundationXIAOHONG ZHAOprogress
08/18/2023Heating SystemsXIAOHONG ZHAOspecial
08/18/2023Fenestration areasXIAOHONG ZHAOenergy_progress
08/18/2023Air barrier - visual inspectionXIAOHONG ZHAOenergy_progress
08/18/2023Duct leakage testing, insulation and designXIAOHONG ZHAOenergy_progress
08/18/2023Insulation placement and R valuesXIAOHONG ZHAOenergy_progress
08/18/2023Maintenance informationXIAOHONG ZHAOenergy_progress
08/18/2023Ventilation and air distribution systemXIAOHONG ZHAOenergy_progress
08/18/2023Interior lighting powerXIAOHONG ZHAOenergy_progress
08/18/2023HVAC-R and service water heating system controlsXIAOHONG ZHAOenergy_progress
Latest 25 of 68.
▾Documents — 68 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/26/2026Q00769468-I1Request digital key ↗
08/26/2026Q00759434-P2Request digital key ↗
08/26/2026Q00759434-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/10/2023440772647Open ↗
▸BISWORK PERMIT APPLICATION1
03/22/2023440772647Open ↗
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/25/2026Q00730486-I1Open ↗
▸Seals & Professional Certifications20
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/26/2026Q00769468-I1Open ↗
08/26/2026Q00759434-P1Open ↗
08/26/2026Q00759434-P2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
08/29/2026Q00759434-I1Open ↗
08/24/2026Q00730486-P1Open ↗
08/24/2026Q00730486-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
08/29/2026Q00759434-I1Open ↗
08/24/2026Q00730486-P1Open ↗
08/24/2026Q00730486-P1Open ↗
Showing 3 of 6 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/10/2023440772647Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸BISTPP1: TENANT PROTECTION PLAN1
03/10/2023440772647Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
03/10/2023440772647Open ↗
▸Energy Compliance8
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
05/23/2023440772647Open ↗
03/10/2023440772647Open ↗
03/10/2023440772647Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/25/2026Q00730486-I1Open ↗
08/13/2026Q00759434-I1Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/23/2023440772647Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
03/10/2023440772647Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (FINAL)1
05/26/2023440772647Open ↗
▸Inspections & Test Reports6
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/23/2023440772647Open ↗
03/10/2023440772647Open ↗
03/10/2023440772647Open ↗
▸DOB NOWSOIL REPORT2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/25/2026Q00730486-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST2
05/30/2023440772647Open ↗
05/24/2023440772647Open ↗
▸BISFINAL ELECTRICAL SIGNOFF1
05/24/2023440772647Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT1
03/10/2023440772647Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
05/23/2023440772647Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/10/2023440772647Open ↗
▸BISADDITIONAL INFORMATION1
03/17/2023440772647Open ↗
▸Other Documents11
▸DOB NOWProperty Ownership Certification2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸DOB NOWPlot Diagram2
08/25/2026Q00730486-I1Open ↗
08/14/2026Q00730486-P1Open ↗
▸BISTax Abatement Miscellaneous1
05/30/2023440772647Open ↗
▸DOB NOWFinal Survey1
08/25/2026Q00730486-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/25/2026Q00730486-I1Open ↗