← Back
BuildNYC
Two family frame
29 BELFIELD AVENUE
STATEN ISLAND · BIN 5175051
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3XZoning
2,548 sfGross Floor Area
2Units
Two family frame · 4,000 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 215p · 1 filing · 20 docs
Floor 1Curb cut installation17p · 3 filings · 20 docs
Cellar15p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Belfield303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scaglione Architects411/04/2021
William Montague Engineering106/18/2020
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Miranco ContractingGeneral Contractor303/21/2026
Anthony ScaglioneElectrical103/21/2026
New Age Electrical ContractingElectrical103/21/2026
NY Code ConsultingElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738311/04/2021
Building Lifecycle
11/23/2021
Signed off — Alteration
Install new ten (10) foot curb cut.
S00432733-I1
11/22/2021
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/19/2021
Signed off — Alteration
Install all plumbing fixtures for new two (2) family home.
S00432739-I1
11/17/2021
Signed off — Alteration
S00359781-I1
11/17/2021
Permit issued — Curb Cut
S00432733-I1-CC
28 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMiranco Contracting11/17/2021
BIS—ISSUEDMiranco Contracting03/25/2021
1 project · most recent 07/06/2021
General Wiring
FiledStatusContractorScope
07/06/2021CompleteRidge ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/22/2021Pass-Final Curb Cut Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
11/08/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
11/08/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/08/2021Maintenance informationWILLIAM MONTAGUEenergy_progress
11/08/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
11/08/2021HVAC and service water heating equipment WILLIAM MONTAGUEenergy_progress
11/08/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
11/03/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/03/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
11/03/2021Maintenance informationWILLIAM MONTAGUEenergy_progress
11/03/2021HVAC and service water heating equipment WILLIAM MONTAGUEenergy_progress
11/03/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
11/03/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
09/23/2021Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
09/23/2021Subsurface Investigations (Borings/Test Pits)anthony santorospecial
09/23/2021HVAC insulation and sealing WILLIAM MONTAGUEenergy_progress
09/23/2021Maintenance informationWILLIAM MONTAGUEenergy_progress
09/23/2021HVAC and service water heating system controls WILLIAM MONTAGUEenergy_progress
09/23/2021HVAC and service water heating equipment WILLIAM MONTAGUEenergy_progress
87 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account