← Back
Single or multiple dwelling with stores or offices
29 EAST 198 STREET
BRONX · Bedford Park · BIN 2092516
💬 Discuss this project
1909Year Built
3Stories
S9Building Class
R8Zoning
7,125 sfGross Floor Area
9Units
Rent Stabilized4 Open Violations 3 unresolved · 1 paperwork only ▸
Single or multiple dwelling with stores or offices · Owner of record: METRO PARK HDFC · 2,567 sf lot · 2.78 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 19p · 2 filings · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO PARK HDFC203/21/2026
WALTON HEIGHTS HDFC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VICTOR HUGO MARTINEZ, PE202/03/2022
JADE HACK112/11/2021
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FUSED ELECTRIC CONTNG CORElectrical103/22/2026
SINCHRONY ELECTRIC INCElectrical103/22/2026
BOB CONSTRUCTION INCGeneral Contractor107/08/2026
NEW GS GENERAL CONTRACTORGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW IMAGE GEN. CONTRACTOR5266302/03/2022
Building Lifecycle
All (32)Filed (3)Permit Issued (3)Signed Off (3)Violation (17)Special Inspection (6)
06/05/2025
Violation issued (HPD, closed)
A
12/10/2024
Violation issued (HPD, open)
C
11/25/2024
Violation issued (HPD, closed)
I
04/17/2023
Signed off — Alteration
PROPOSED CONSTRUCTION OF A CONCRETE H. C. RAMP, LOCATED AT THE GROUND FLOOR, FOR THE COMMERCIAL ENTRANCE DOOR OF THIS BUILDING. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
X00584506-S1
07/22/2022
Violation issued (HPD, closed)
C
07/22/2022
Violation issued (HPD, closed)
B
07/22/2022
Violation issued (HPD, closed)
B
07/22/2022
Violation issued (HPD, closed)
B
07/22/2022
Violation issued (HPD, closed)
B
05/26/2022
Signed off — Alteration
X00640877-I1
03/18/2022
Permit issued — General Construction
X00584506-S1-GC
02/04/2022
Signed off — Alteration
PROPOSED CONSTRUCTION OF A CONCRETE H. C. RAMP, LOCATED AT THE GROUND FLOOR, FOR THE COMMERCIAL ENTRANCE DOOR OF THIS BUILDING. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
X00584506-I1
02/03/2022
Filed — Alteration
PROPOSED CONSTRUCTION OF A CONCRETE H. C. RAMP, LOCATED AT THE GROUND FLOOR, FOR THE COMMERCIAL ENTRANCE DOOR OF THIS BUILDING. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
X00584506-S1
01/30/2022
Special inspection requirement — Concrete - Cast-In-Place
VICTOR MARTINEZ
01/30/2022
Special inspection requirement — Final
VICTOR MARTINEZ
12/18/2021
Permit issued — General Construction
X00640877-I1-GC
12/11/2021
Filed — Alteration
X00640877-I1
12/02/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
VICTOR MARTINEZ
12/02/2021
Special inspection requirement — Final
JADE HACK
12/02/2021
Special inspection requirement — Interior lighting power
VICTOR MARTINEZ
12/02/2021
Special inspection requirement — Lighting controls
VICTOR MARTINEZ
11/04/2021
Permit issued — Structural
X00584506-I1-GC-CX
09/14/2021
Filed — Alteration
PROPOSED CONSTRUCTION OF A CONCRETE H. C. RAMP, LOCATED AT THE GROUND FLOOR, FOR THE COMMERCIAL ENTRANCE DOOR OF THIS BUILDING. NO CHANGE IN USE, EGRESS, OCCUPANCY OR BULK.
X00584506-I1
03/28/2018
Violation issued (ECB, open)
Boilers
08/22/2017
Violation issued (HPD, closed)
B
12/31/2009
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/06/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/09/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/29/1993
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/17/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offNEW GS GENERAL CONTRACTOR03/18/2022
DOB NOWGeneral ConstructionSigned-offBOB CONSTRUCTION12/18/2021
DOB NOWStructuralSigned-offVICTOR HUGO MARTINEZ, PE11/04/2021
2 projects · most recent 04/09/2022
General Wiring
FiledStatusContractorScope
04/09/2022CompleteFUSED ELECTRIC CONTNG CORGeneral Wiring
02/07/2021Permit IssuedSINCHRONY ELECTRIC INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
01/30/2022Concrete - Cast-In-PlaceVICTOR MARTINEZspecial
01/30/2022FinalVICTOR MARTINEZprogress
12/02/2021Fire-Resistant Penetrations and JointsVICTOR MARTINEZspecial
12/02/2021FinalJADE HACKprogress
12/02/2021Interior lighting powerVICTOR MARTINEZenergy_progress
12/02/2021Lighting controlsVICTOR MARTINEZenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/25/2026X00584506-S1Request digital key ↗
08/25/2026X00584506-I1Request digital key ↗
08/25/2026X00640877-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature3
08/26/2026X00584506-S1Open ↗
08/24/2026X00640877-I1Open ↗
08/24/2026X00640877-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/25/2026X00640877-I1Open ↗
08/13/2026X00584506-I1Open ↗
08/13/2026X00584506-S1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/26/2026X00584506-S1Open ↗
08/24/2026X00640877-I1Open ↗
▸Environmental & Asbestos3
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/25/2026X00640877-I1Open ↗
08/13/2026X00584506-S1Open ↗
08/13/2026X00584506-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026X00584506-I1Open ↗
08/13/2026X00640877-I1Open ↗