← Back
BuildNYC
Two stories - detached, small or mid-size
29 EMERSON COURT
STATEN ISLAND · BIN 5021715
💬 Discuss this project
1965Year Built
2Stories
A1Building Class
R1-1Zoning
1,536 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 4,815 sf lot · 0.32 FAR built · Flood zone X
Locations of Work
StructuralElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar electrical generating system installation6p · 1 filing · 6 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NKM Engineering106/05/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Infinity Solar SystemsGeneral Contractor107/30/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244106/05/2026
Building Lifecycle
09/30/2026
Permit expired, never signed off — Solar
The city's record still shows this permit as issued, with no sign-off on its filing
S01384453-I1-SL
07/29/2026
Permit issued — Solar
S01384453-I1-SL
06/05/2026
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
S01384453-I1
04/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
04/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedInfinity Solar Systems07/29/2026
2 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026CompleteHarrington Electric Contracting—
04/09/2026CancelledHarrington Electric ContractingGeneral Wiring
1 project · most recent 06/05/2026
FiledStatusContractorScope
06/05/2026Permit IssuedInfinity Solar Systems—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/08/2026Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
04/08/2026Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
04/08/2026Energy Code Compliance InspectionsNARESH MAHANGUprogress
04/08/2026FinalNARESH MAHANGUprogress
04/08/2026Air barrier - visual inspectionNARESH MAHANGUenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account