← Back
STATEN ISLAND
29 HICKORY AVENUE
STATEN ISLAND · BIN 5176736
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureMechanical
Floor 29p · 1 filing · 20 docs
Floor 18p · 1 filing · 20 docs
Basement9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MMV1804/09/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SCAGLIONE ARCHITECTS405/07/2025
C&P DESIGN CONSULTANTS110/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
C P DESIGN CONSULTANTS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
DAE DEVELOPMENT CORPGeneral Contractor404/09/2026
M. EARLY PLBG & HTG CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324305/07/2025
C&P DESIGN CONSULTANT8472110/23/2024
A TECH ENGINEERING NYC, P6738110/03/2024
Building Lifecycle
All (52)Filed (5)Permit Issued (4)Signed Off (3)Inspection (8)Objection (2)Special Inspection (30)
04/13/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Signed off — Alteration
Application filed to install twenty three (23) plumbing fixtures, two (2) nongas water heaters and private storm water disposal system in conjunction with new building Application # S01101045-i1
S01113656-I1
06/24/2025
Signed off — Alteration
S01113644-I1
06/13/2025
Signed off — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01101045-S1
06/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/12/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/20/2025
Objection resolved — Addressed
05/12/2025
Objection raised — Scope
05/07/2025
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01101045-P1
02/20/2025
Special inspection requirement — Metering
Richard Dailey
02/20/2025
Special inspection requirement — Concrete - Cast-In-Place
Richard Dailey
02/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Richard Dailey
02/20/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Richard Dailey
02/20/2025
Special inspection requirement — Subgrade Inspections
Richard Dailey
02/20/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
02/20/2025
Special inspection requirement — Wood – Prefabricated I-Joists
Richard Dailey
02/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Richard Dailey
02/20/2025
Special inspection requirement — Final
Richard Dailey
02/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Richard Dailey
02/20/2025
Special inspection requirement — Footing and Foundation
Richard Dailey
02/20/2025
Special inspection requirement — Structural Wood Frame
Richard Dailey
02/20/2025
Special inspection requirement — Fenestration air leakage
Richard Dailey
02/20/2025
Special inspection requirement — Lighting in dwelling units
Richard Dailey
02/20/2025
Special inspection requirement — Fenestration areas
Richard Dailey
02/20/2025
Special inspection requirement — Insulation placement and R values
Richard Dailey
02/20/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Richard Dailey
02/20/2025
Special inspection requirement — Air barrier — testing
Richard Dailey
02/20/2025
Special inspection requirement — Permanent certificate
Richard Dailey
02/20/2025
Special inspection requirement — Air barrier - visual inspection
Richard Dailey
01/13/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
11/13/2024
Permit issued — Curb Cut
S01113644-I1-CC
11/12/2024
Permit issued — Mechanical Systems
S01101045-S1-MS
11/01/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
10/29/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/24/2024
Filed — Alteration
S01113644-I1
10/23/2024
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01101045-S1
10/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/23/2024
Special inspection requirement — Energy Code Compliance Inspections
Stanislav Pilipenko
10/23/2024
Special inspection requirement — Permanent certificate
Stanislav Pilipenko
10/23/2024
Special inspection requirement — Duct leakage testing, insulation and design
Stanislav Pilipenko
10/23/2024
Special inspection requirement — HVAC-R and service water heating system controls
Stanislav Pilipenko
10/23/2024
Special inspection requirement — Maintenance information
Stanislav Pilipenko
10/23/2024
Special inspection requirement — Ventilation and air distribution system
Stanislav Pilipenko
10/23/2024
Special inspection requirement — HVAC-R and service water heating equipment
Stanislav Pilipenko
10/23/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Stanislav Pilipenko
10/22/2024
Special inspection requirement — Mechanical Systems
Stanislav Pilipenko
10/21/2024
Permit issued — Plumbing
S01113656-I1-PL
10/18/2024
Permit issued — General Construction
S01101045-I1-GC-CX
10/04/2024
Filed — New Building
1) INSTALLATION OF SPLIT SYSTEM HEAT PUMP FOR HEATING AND COOLING OF EACH RESIDENCE.2) INSTALLATION OF EXHAUST AND ERV SYSTEMS FOR VENTILATION OF EACH RESIDENCE.
S01101045-I1
10/03/2024
Filed — Alteration
Application filed to install twenty three (23) plumbing fixtures, two (2) nongas water heaters and private storm water disposal system in conjunction with new building Application # S01101045-i1
S01113656-I1
12/22/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offDAE DEVELOPMENT CORP11/13/2024
DOB NOWMechanical SystemsSigned-offDAE DEVELOPMENT CORP11/12/2024
DOB NOWPlumbingSigned-offM. EARLY PLBG & HTG CORP10/21/2024
DOB NOWGeneral ConstructionPermit IssuedDAE DEVELOPMENT CORP10/18/2024
1 project · most recent 05/07/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/07/2025Signed-offDAE DEVELOPMENT CORPHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Tosot AHU: TU36-24AH2ADU - CU: TU36-24WADU 37,000 BTU · Heat Pump Outdoor ×1
AHU: TU60-24AH2ADU- CU: TU60-24WADU 55,000 BTU · Heat Pump Outdoor ×1
Ventilation
Fantech AEV80 110 CFM · Erv ×2
1 project · most recent 12/27/2024
General Wiring
FiledStatusContractorScope
12/27/2024CompleteMANGI ELECTRICAL CORPGeneral Wiring
1 project · most recent 05/07/2025
Wood
FiledStatusContractorScope
05/07/2025Signed-offDAE DEVELOPMENT CORPWood
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
04/13/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/12/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
01/13/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/01/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
10/29/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/22/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
02/20/2025MeteringRichard Daileyenergy_progress
02/20/2025Concrete - Cast-In-PlaceRichard Daileyspecial
02/20/2025Fire-Resistant Penetrations and JointsRichard Daileyspecial
02/20/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationRichard Daileyspecial
02/20/2025Subgrade InspectionsRichard Daileyspecial
02/20/2025Subsurface Investigations (Borings/Test Pits)anthony santorospecial
02/20/2025Wood – Prefabricated I-JoistsRichard Daileyspecial
02/20/2025Energy Code Compliance InspectionsRichard Daileyprogress
02/20/2025FinalRichard Daileyprogress
02/20/2025Fire-Resistance Rated ConstructionRichard Daileyprogress
02/20/2025Footing and FoundationRichard Daileyprogress
02/20/2025Structural Wood FrameRichard Daileyprogress
02/20/2025Fenestration air leakageRichard Daileyenergy_progress
02/20/2025Lighting in dwelling unitsRichard Daileyenergy_progress
02/20/2025Fenestration areasRichard Daileyenergy_progress
02/20/2025Insulation placement and R valuesRichard Daileyenergy_progress
02/20/2025Fenestration and door U-factor and product ratingsRichard Daileyenergy_progress
02/20/2025Air barrier — testing Richard Daileyenergy_progress
02/20/2025Permanent certificateRichard Daileyenergy_progress
02/20/2025Air barrier - visual inspectionRichard Daileyenergy_progress
10/23/2024Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/23/2024Energy Code Compliance InspectionsStanislav Pilipenkoprogress
10/23/2024Permanent certificateStanislav Pilipenkoenergy_progress
10/23/2024Duct leakage testing, insulation and designStanislav Pilipenkoenergy_progress
10/23/2024HVAC-R and service water heating system controlsStanislav Pilipenkoenergy_progress
Latest 25 of 39.
▾Documents — 59 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/20/2026S01113656-I1Request digital key ↗
08/20/2026S01113644-I1Request digital key ↗
08/19/2026S01101045-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits3
▸BISBPP-5 - Authorization to the Department of Transportation2
07/31/2024540264284Open ↗
07/23/2024540264284Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
07/31/2024540264284Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸Seals & Professional Certifications18
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026S01101045-P1Open ↗
09/01/2026S01101045-P1Open ↗
08/31/2026S01113656-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/20/2026S01113656-I1Open ↗
08/19/2026S01101045-I1Open ↗
08/13/2026S01113644-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026S01101045-P1Open ↗
09/01/2026S01101045-P1Open ↗
08/31/2026S01113656-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
07/12/2024540264284Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
07/12/2024540264284Open ↗
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S01101045-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S01101045-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S01101045-I1Open ↗
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
07/12/2024540264284Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
07/12/2024540264284Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S01101045-I1Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026S01101045-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
07/31/2024540264284Open ↗
07/23/2024540264284Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
07/31/2024540264284Open ↗
▸Other Documents11
▸DOB NOWSite Survey: Initial2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/19/2026S01101045-I1Open ↗
08/13/2026S01101045-P1Open ↗
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
07/17/2024540264284Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
07/17/2024540264284Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
07/17/2024540264284Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
07/12/2024540264284Open ↗
▸DOB NOWFinal Survey1
08/13/2026S01101045-I1Open ↗