← Back
Building

29 Lamont Court, Brooklyn

29 Lamont Court, Brooklyn: 28 open violations.

Building facts

Borough
Brooklyn
Year built
1940
Stories
2
Dwelling units
2
Building floor area (sq ft)
1,408
Zoning
R7-1
Building class
B1

Open violations

Latest 15 of 28 open violations.

IssuedSourceTypeDescription
2025-09-12ecbZoningVIOLATION FOR PLANTING REQUIREMENTS AT FRONT YARD. NOTED : AT TIME OF INSPECTION ,OBSERVED AT FRONT YARD THE ENTIRE PLANTING WAS REMOVED AND REPLACED WITH CONCRETE.; ZR-…
2025-09-12ecbConstructionFAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTED : AT TIME OF INSPECTION ,OBSERVED THE CURD WAS ILLEGALLY CUT TO PROVIDE ACCESS TO ILLEGAL PARKING AT FRONT Y…
2025-09-12ecbConstructionVIOLATION FOR PARKING REGULATION IN A RESIDENTIAL DISTRICT. NOTED : AT TIME OF INSPECTION ,OBSERVED A SILVER JEEP CHEROKEE WITH NYS LICENSE PLATES # LKF- 1193 IS ILLEGAL…
2024-07-02ecbConstructionFOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED AT EXPOSURE #1. SIDEWALK CURB MODIFIED BY CUTTING SO THAT PORTION OF CURB IS LOWERED TO ENABLE A VEHI…
2021-04-26hpdB§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON WEST WALL (APPROX 12 SQ FT), NORTH WALL (APPROX 4 SQ FT) AT SCUTTLE LADDER CLOSET…
2021-04-26hpdB§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ELECTRICAL OUTLET, SOUTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 2,…
2021-04-26hpdB§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 5th ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTME…
2021-04-26hpdB§ 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF INOPERATIVE HATCH DOOR TO ROOF AT SCUTTLE LADDER CLOSET, NORTH WALL IN THE 5th ROOM FROM EAST LOCATED AT APT 2, 2…
2021-04-26hpdB§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 2, 2nd STORY, 1st APARTME…
2021-04-26hpdB§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT…
2021-04-26hpdB§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... ON WINDOW SILL (APPROX 2 SQ FT), WEST WALL (APPROX 6 SQ FT), DOOR AT NORTH WALL (APP…
2021-04-26hpdB§ 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST
2021-04-26hpdB§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT ELECTRICAL OUTLET, EAST WALL IN THE 4th ROOM FROM EAST LOCATED AT APT 2, 2…
2021-04-26hpdA§ 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND ALL WALLS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STOR…
2021-04-26hpdB§ 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASHBASIN IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST

Source: NYC Department of Buildings filings, permits and violations. Sign in to BuildNYC for plans on file, inspections and the full building record.