29 LEONARD STREET · BIN 3338422
💬 Discuss this project
1973Year Built
21Stories
D4Building Class
R6Zoning
758,750 sfGross Floor Area
774Units
LL97 CoveredRent Stabilized77 Open Violations 68 unresolved · 9 paperwork only ▸FISP: UNSAFEFDNY Report ↗
Elevator cooperative · 259,200 sf lot · 2.93 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction82p · 2 filings · 20 docs
BulkheadUnder Construction1p · 1 filing · 20 docs
Floor 1Under Construction78p · 1 filing · 20 docs
CellarUnder Construction75p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
METRO MANAGEMENT DEVELOPMENT3209/08/2026
XINOS CONSTRUCTION507/08/2026
LINDSAY PARK HGS CORP2103/22/2026
LINDSAY PARK HOUSING3703/22/2026
LIMOSEY PARISS HGS CORP103/22/2026
ZENITH PROPERTIES403/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CTA ARCHITECTS P.C.408/17/2026
COLLADO ENGINEERING102/23/2026
QUEENS ENGINEERING512/04/2024
NY RESTORATION TECHNOLOGY CORP104/20/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
XINOS CONSTRUCTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
XINOS CONSTRUCTION CORPGeneral Contractor707/08/2026
SORTINO JOSEPHElectrical203/21/2026
CEESAY, BELALElectrical103/21/2026
RAPPO, FRANKElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CATALPA SPECIAL INSPECTIO2004408/17/2026
METRIC CONSULTING AND INS1803408/17/2026
QUEENS ENGINEERING PLLC8898512/04/2024
NY RESTORATION TECHNOLOGY6187104/20/2023
Building Lifecycle
All (132)Filed (11)Permit Issued (8)Facade (FISP) (23)Violation (60)Special Inspection (30)
08/17/2026
Filed — Alteration
GENERAL CONSTRUCTION OF FACADE REPAIR, INTERIOR REPAIR, AND ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
B00751177-P3
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, closed)
B
08/05/2026
Violation issued (HPD, open)
C
08/05/2026
Violation issued (HPD, open)
A
08/05/2026
Violation issued (HPD, open)
B
08/05/2026
Violation issued (HPD, open)
A
08/04/2026
Violation issued (HPD, open)
A
08/04/2026
Violation issued (HPD, open)
A
08/04/2026
Violation issued (HPD, open)
A
08/04/2026
Violation issued (HPD, open)
A
08/04/2026
Violation issued (HPD, open)
B
08/04/2026
Violation issued (HPD, open)
B
05/18/2026
Violation issued (HPD, closed)
B
05/18/2026
Violation issued (HPD, closed)
B
05/13/2026
Cycle 9 facade inspection completed
05/11/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, open)
C
05/11/2026
Violation issued (HPD, open)
B
05/11/2026
Violation issued (HPD, closed)
B
04/24/2026
Permit issued — General Construction
B00751177-I1-GC
03/24/2026
Violation issued (ECB, closed)
Construction
02/23/2026
Filed — Alteration
Mechanical plans filed herewith to show addition of VRF split system and associated ductwork/piping in lobby. Relocation of radiator and associated piping. No change to use, egress, or occupancy.
B01257529-I1
02/10/2026
Cycle 9 facade report submitted
02/10/2026
Cycle 9 facade report signed — UNSAFE
01/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ERIC BERLENT
01/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
SAMI HAJJAR P.E
01/23/2026
Special inspection requirement — Energy Code Compliance Inspections
ERIC BERLENT
01/23/2026
Special inspection requirement — Final
ERIC BERLENT
01/23/2026
Special inspection requirement — Masonry
SAMI HAJJAR P.E
01/23/2026
Special inspection requirement — Air barrier - visual inspection
ERIC BERLENT
01/23/2026
Special inspection requirement — Lighting controls
ERIC BERLENT
01/23/2026
Special inspection requirement — Fenestration areas
ERIC BERLENT
01/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
ERIC BERLENT
01/23/2026
Special inspection requirement — Tenant Protection Plan Compliance
ERIC BERLENT
01/23/2026
Special inspection requirement — Fenestration air leakage
ERIC BERLENT
01/23/2026
Special inspection requirement — Interior lighting power
ERIC BERLENT
01/23/2026
Special inspection requirement — Insulation placement and R values
ERIC BERLENT
01/21/2026
Cycle 9 facade inspection completed
12/18/2025
Cycle 9 facade report submitted
11/21/2025
Permit issued — Suspended Scaffold
B00974437-I1-SC
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
B
11/19/2025
Violation issued (HPD, closed)
B
11/10/2025
Violation issued (HPD, closed)
C
09/02/2025
Filed — Alteration
GENERAL CONSTRUCTION OF FACADE REPAIR, INTERIOR REPAIR, AND ROOF REPLACEMENT AS PER PLANS FILED HEREWITH. NO CHANGE TO USE,EGRESS, OR OCCUPANCY.
B00751177-P2
08/26/2025
Special inspection requirement — Shutoff dampers
08/26/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Latest 60 of 132 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP04/24/2026
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP11/21/2025
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP07/23/2025
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP12/12/2024
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP07/16/2024
DOB NOWSuspended ScaffoldPermit IssuedXINOS CONSTRUCTION CORP12/11/2023
DOB NOWGeneral ConstructionPermit IssuedXINOS CONSTRUCTION CORP05/25/2023
DOB NOWSupported ScaffoldPermit IssuedXINOS CONSTRUCTION CORP04/20/2023
BISEQISSUEDSPRING SCAFFOLDING LLC05/08/2025
BISEQISSUEDSPRING SCAFFOLDING LLC05/22/2024
BISEQISSUEDSPRING SCAFFOLDING LLC05/16/2023
BISEQISSUEDSPRING SCAFFOLDING LLC05/16/2022
BISEQISSUEDSPRING SCAFFOLDING LLC05/16/2022
BISEQISSUEDSPRING SCAFFOLDING LLC04/13/2021
BISEQISSUEDSPRING SCAFFOLDING LLC04/15/2020
BISEQISSUEDSPRING SCAFFOLDING LLC04/24/2019
BISEQISSUEDSPRING SCAFFOLDING LLC05/08/2018
BISEQISSUEDSPRING SCAFFOLDING LLC04/27/2017
BISOTISSUED410 LEX INC06/07/2016
BISEQISSUED410 LEX INC06/07/2016
BISEQISSUEDSPRING SCAFFOLDING LLC03/23/2016
BISEQISSUEDSPRING SCAFFOLDING LLC04/14/2015
BISEQISSUED410 LEX INC09/22/2014
BISOTISSUED410 LEX INC09/22/2014
BISOTISSUED410 LEX INC09/22/2014
BISPLISSUEDG.BASSOLINO PLUMBING LTD01/09/2013
BISPLISSUEDG.BASSOLINO PLUMBING LTD10/12/2011
BISFBISSUEDG BASSOLINO PLB LTD10/12/2011
BISOTISSUEDALL BORO PLUMBING-HEATING02/19/2009
BISOTISSUEDALL BORO PLBG/HTG & COOLING04/16/2008
BISFSISSUEDCAM ENERGY HTG AND MECH01/22/2008
BISOTISSUEDALL BORO PLBG/HTG & COOLING01/16/2008
BISOTISSUEDECHOSTAR CONSTRUCTION INC.09/10/2003
BISFBISSUEDSIBRIZZI FUEL OIL ENTERPRISES12/02/1993
1 project · most recent 02/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/23/2026——Heating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MLZ-KX18NL 16,400 BTU · Vrf Indoor ×2
MSZ-GX12NL 14,000 BTU · Vrf Indoor ×1
MXZ-SM36NAM2 36,000 BTU · Vrf Outdoor ×1
MXZ-SM48NL 48,000 BTU · Vrf Outdoor ×1
PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1
6 projects · most recent 01/08/2026
General Wiring
FiledStatusContractorScope
01/08/2026Permit IssuedTOP SHELF ELECTRIC CORP—
08/30/2023CompleteLIPPOLIS ELECTRIC, INC.General Wiring
01/27/2023Permit IssuedSCIENTIFIC ELEC. CO. INCGeneral Wiring
05/18/2021Permit IssuedREGIONAL ELEC'L VOICE &General Wiring
11/11/2019CompleteJAM ELECTRICAL CORP—
11/11/2019CompleteJAM ELECTRICAL CORP—
1 project · most recent 04/20/2023
Scaffold
FiledStatusContractorScope
04/20/2023Permit IssuedXINOS CONSTRUCTION CORPScaffold
1 project · most recent 12/04/2024
Suspended Scaffold (SC)
FiledStatusContractorScope
12/04/2024Permit IssuedXINOS CONSTRUCTION CORPSuspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 39
DateRequirementInspectorRole
01/23/2026Fire-Resistant Penetrations and JointsERIC BERLENTspecial
01/23/2026Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
01/23/2026Energy Code Compliance InspectionsERIC BERLENTprogress
01/23/2026FinalERIC BERLENTprogress
01/23/2026MasonrySAMI HAJJAR P.Especial
01/23/2026Air barrier - visual inspectionERIC BERLENTenergy_progress
01/23/2026Lighting controlsERIC BERLENTenergy_progress
01/23/2026Fenestration areasERIC BERLENTenergy_progress
01/23/2026Fenestration and door U-factor and product ratingsERIC BERLENTenergy_progress
01/23/2026Tenant Protection Plan ComplianceERIC BERLENTspecial
01/23/2026Fenestration air leakageERIC BERLENTenergy_progress
01/23/2026Interior lighting powerERIC BERLENTenergy_progress
01/23/2026Insulation placement and R valuesERIC BERLENTenergy_progress
08/26/2025Shutoff dampers—energy_progress
08/26/2025Fire-Resistant Penetrations and Joints—special
08/25/2025Structural Stability – Alterations of existing buildingsSAMI HAJJAR P.Especial
08/25/2025Energy Code Compliance InspectionsERIC BERLENTprogress
08/25/2025FinalERIC BERLENTprogress
08/25/2025Fenestration areasERIC BERLENTenergy_progress
08/25/2025Insulation placement and R valuesERIC BERLENTenergy_progress
08/25/2025Interior lighting powerERIC BERLENTenergy_progress
08/25/2025Air barrier - visual inspectionERIC BERLENTenergy_progress
08/25/2025Fenestration and door U-factor and product ratingsERIC BERLENTenergy_progress
08/25/2025Lighting controlsERIC BERLENTenergy_progress
08/25/2025Fenestration air leakageERIC BERLENTenergy_progress
Latest 25 of 39.
▾Documents — 182 on file (BIS + DOB NOW)
▸Plans & Drawings13
▸DOB NOWPlans/Sketch13
08/29/2026B00751177-I1Request digital key ↗
08/29/2026B00751177-P3Request digital key ↗
08/27/2026B00862579-I1Request digital key ↗
Showing 3 of 13 on file for this type
▸Applications & Permits32
▸BISWORK PERMIT APPLICATION23
05/12/2025340248191Open ↗
05/28/2024340248191Open ↗
05/17/2023340248191Open ↗
Showing 3 of 23 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION8
05/17/2022322059464Open ↗
04/16/2019322059464Open ↗
11/21/2018322059464Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
04/01/2019322059464Open ↗
▸Seals & Professional Certifications57
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026B00751177-P2Open ↗
09/01/2026B00751177-P2Open ↗
09/01/2026B00751177-P2Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/27/2026B00862579-I1Open ↗
08/24/2026B00974437-P4Open ↗
08/24/2026B00974437-I1Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION10
11/21/2018322059464Open ↗
11/21/2018322059464Open ↗
08/08/2017320369873Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026B00751177-P2Open ↗
09/01/2026B00751177-P2Open ↗
09/01/2026B00751177-P2Open ↗
Showing 3 of 10 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
10/14/2011320369873Open ↗
05/10/2011320306575Open ↗
11/27/2007310047071Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM3
10/14/2011320369873Open ↗
05/10/2011320306575Open ↗
11/26/2007310047071Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
04/14/2015340248191Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
04/14/2015340248191Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
04/14/2015340248191Open ↗
▸BISPC FULL REPORT1
11/26/2007310047071Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE3
02/11/2013320369873Open ↗
12/09/2011320369873Open ↗
12/09/2011320369873Open ↗
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT2
10/14/2011320369873Open ↗
11/26/2007310047071Open ↗
▸BISSCHEDULE B - PLUMBING1
10/14/2011320369873Open ↗
▸Safety & Tenant Protection3
▸BISTenant Protection Plan and Notes2
01/08/2019322059464Open ↗
11/21/2018322059464Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
08/01/2017320369873Open ↗
▸Environmental & Asbestos6
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
05/10/2011320306575Open ↗
11/26/2007310047071Open ↗
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)2
08/11/2014321159081Open ↗
08/11/2014321159090Open ↗
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/14/2015340248191Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/14/2011320369873Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
11/21/2018322059464Open ↗
11/21/2018322059464Open ↗
▸BISTR8: Energy Code Progress Inspections2
08/11/2014321159090Open ↗
08/11/2014321159081Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
04/14/2015340248191Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: SOIL INSPECTION1
11/21/2018322059464Open ↗
▸BISNOTIF.-PROPOSED STEAM/HOT WATER INSPECTION1
02/11/2013320369873Open ↗
▸Approvals, Objections & Sign-offs27
▸BISLETTERS - SUPPORTING DOCUMENTATION12
05/12/2025340248191Open ↗
05/12/2025340248191Open ↗
05/28/2024340248191Open ↗
Showing 3 of 12 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
08/11/2014321159090Open ↗
08/11/2014321159081Open ↗
10/14/2011320369873Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter5
08/19/2026B00751177-P3Open ↗
08/13/2026B00751177-P2Open ↗
08/13/2026B00751177-I1Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
08/08/2017320369873Open ↗
08/01/2017320369873Open ↗
10/14/2011320306575Open ↗
▸BISSHED LETTER1
04/11/2016340248191Open ↗
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00751177-I1Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
11/21/2018322059464Open ↗
08/01/2017320369873Open ↗
08/11/2014321159090Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms14
▸BISBOROUGH INTAKE FORM5
05/12/2025340248191Open ↗
06/09/2022340248191Open ↗
06/09/2022340248191Open ↗
Showing 3 of 5 on file for this type
▸BISADDITIONAL INFORMATION4
06/09/2022340248191Open ↗
06/09/2022340248191Open ↗
04/15/2021340248191Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET4
11/21/2018322059464Open ↗
08/11/2014321159090Open ↗
10/14/2011320369873Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
04/14/2015340248191Open ↗
▸Other Documents10
▸DOB NOWCalculations5
08/13/2026B00974437-P1Open ↗
08/13/2026B00974437-P2Open ↗
08/13/2026B00974437-P3Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWManufacturer's Specifications5
08/13/2026B00974437-P2Open ↗
08/13/2026B00974437-I1Open ↗
08/13/2026B00974437-P3Open ↗
Showing 3 of 5 on file for this type