← Back
Luxury hotel
29 RYERSON STREET
BROOKLYN · BIN 3054155
💬 Discuss this project
1951Year Built
12Stories
H1Building Class
M1-2Zoning
228,591 sfGross Floor Area
374Units
LL97 Covered6 Open Violations ▸FISP: SWARMPFDNY Report ↗
Luxury hotel · Owner of record: SELA RYERSON LLC · 35,483 sf lot · 6.44 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionGeneral
Roof53p · 2 filings · 20 docs
Bulkhead3p · 2 filings · 16 docs
Floor 1251p · 1 filing · 17 docs
Floor 1151p · 1 filing · 17 docs
Floor 1052p · 1 filing · 17 docs
Floor 951p · 1 filing · 17 docs
Floor 852p · 2 filings · 20 docs
Floor 752p · 2 filings · 20 docs
Floor 651p · 1 filing · 17 docs
Floor 552p · 2 filings · 20 docs
Floor 452p · 2 filings · 20 docs
Floor 352p · 2 filings · 20 docs
Floor 251p · 1 filing · 17 docs
Floor 159p · 4 filings · 20 docs
Cellar53p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SELA GROUP3108/31/2026
SKYLINE SCAFFOLDING GROUP1007/08/2026
TOPLINE NYC CONTRACTING407/08/2026
A & H INSTALLATION INC1303/22/2026
CONSTR903/22/2026
213 W 40TH ST MANAGEMENT903/22/2026
OMNIBUILD CONSTRUCTION IN403/22/2026
ATLAS BUILDERS3503/22/2026
SDF47 RYERSON STREET3703/22/2026
11-45 RYERSON HOLDINGS1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NOEL BUILDING CONSULTING INC1203/21/2026
ADVANCED BUILDERS SERVICES703/21/2026
YAGUDAYEV ARCHITECTURE STUDIO P C403/21/2026
Rigid Structural Design, LLC503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
213 W 40TH ST MANAGEMENTGeneral Contractor807/08/2026
SKYLINE SCAFFOLDING GROUPGeneral Contractor807/08/2026
ATLAS BUILDERS LLCGeneral Contractor507/08/2026
PHOENIX PLMBG & MECH CORPFire Protection407/08/2026
A & H INSTALLATION INCGeneral Contractor403/21/2026
YAGUDAYEV ARCHITECTURE STUDIOGeneral Contractor303/22/2026
PRIME PIPING & HEATING INFire Protection207/08/2026
AAA TOTAL PLUMBING INCFire Protection207/08/2026
TOPLINE NYC CONTRACTINGGeneral Contractor207/08/2026
YURY YAGUDAYEVElectrical103/21/2026
CITY WIDE ELECL CONTS INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AUTOMATED DESIGN CONSULTA895105/06/2026
MT GROUP798411/20/2023
JIAN ENGINEERING PLLC7397509/13/2023
SHAHRISH SHUVO ENGINEERIN8524109/13/2023
Building Lifecycle
All (184)Filed (29)Permit Issued (26)Signed Off (9)Facade (FISP) (13)Violation (60)Inspection (10)Objection (8)Special Inspection (29)
08/11/2026
Filed — No Work
B01443679-I1
06/08/2026
Signed off — Alteration
Install plumbing systems per plans filed herewith and in conjunction with A1#321197272
B00338846-S2
05/28/2026
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/13/2026
Permit issued — Boiler Equipment
B00338846-S2-BE
05/06/2026
Filed — Alteration
Install plumbing systems per plans filed herewith and in conjunction with A1#321197272
B00338846-S2
05/06/2026
Special inspection requirement — Fuel-Oil Storage and Fuel-Oil Piping Systems
Gregory Mortman
11/03/2025
Permit issued — Boiler Equipment
B00338846-S1-BE
07/07/2025
Signed off — Alteration
Install emergency generator.
B00338582-I1
06/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00889906-I1
06/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B00833837-I1
06/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
B00726445-I1
05/15/2025
Signed off — Alteration
Install emergency generator.
B00338582-S2
05/02/2025
Signed off — Alteration
FILING FOR STRUCTURAL WORK INSTALLATION OF STRUCTURE FOR MARQUEE. INCONJUNCTION WITH ALT1 # 321197272
B00896214-I1
03/12/2025
Permit issued — Mechanical Systems
B00338582-S2-MS
11/14/2024
Filed — No Work
B01138609-I1
10/11/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
08/05/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
05/15/2024
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08001401-I1
05/15/2024
Signed off — Alteration
Installation of a temporary needle beam per plan submitted. Work shall comply with 2014 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B08019516-I1
04/17/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/12/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/03/2024
Violation issued (ECB, closed)
Construction
03/05/2024
Cycle 9 facade report signed — SWARMP
02/01/2024
Violation issued (ECB, closed)
Local Law
01/10/2024
Special inspection requirement — Final
JIAN DENG
01/09/2024
Filed — Alteration
HEREBY SUBMITTING GENERAL CONSTRUCTION PLANS FOR TEMPORARY MIGRANT FACILITY (HERRC SITE) IN CONJUNCTION WITH ALT1 APPLICANT #321197272. APPLICATION FILED AS PER BROOKLYN BOROUGH COMMISSIONER REDA SHEHATA
B00939738-P2
01/08/2024
Special inspection requirement — Final
JIAN DENG
12/14/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
12/12/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/08/2023
Permit issued — Mechanical Systems
B00338582-I1-MS
12/08/2023
Cycle 9 facade report submitted
12/01/2023
Filed — Alteration
HEREBY SUBMITTING GENERAL CONSTRUCTION PLANS FOR TEMPORARY MIGRANT FACILITY (HERRC SITE) IN CONJUNCTION WITH ALT1 APPLICANT #321197272. APPLICATION FILED AS PER BROOKLYN BOROUGH COMMISSIONER REDA SHEHATA
B00939738-P1
11/22/2023
Special inspection requirement — Sprinkler Systems
JIAN DENG
11/22/2023
Special inspection requirement — Standpipe Systems
JIAN DENG
11/20/2023
Filed — Alteration
B00338554-P2
11/20/2023
Filed — Alteration
Install plumbing systems per plans filed herewith and in conjunction with A1#321197272
B00338846-P3
11/20/2023
Special inspection requirement — Final
JIAN DENG
11/14/2023
Special inspection requirement — Sprinkler Systems
JIAN DENG
11/14/2023
Special inspection requirement — Standpipe Systems
JIAN DENG
11/13/2023
Special inspection requirement — Energy Code Compliance Inspections
Marisa Harte
11/13/2023
Special inspection requirement — HVAC and service water heating equipment
JIAN DENG
11/13/2023
Special inspection requirement — HVAC and service water heating system controls
JIAN DENG
11/13/2023
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Marisa Harte
11/12/2023
Cycle 9 facade inspection completed
11/09/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/09/2023
Inspection — Certified StandPipe-SD-Piping-Hydrostatic Test
Certified
View inspection ↗
10/30/2023
Filed — Alteration
Install plumbing systems per plans filed herewith and in conjunction with A1#321197272
B00338846-P2
10/25/2023
Permit issued — Standpipe
B00338554-I1-EW-SD
10/25/2023
Permit issued — Sprinklers
B00338554-I1-EW-SP
10/25/2023
Objection raised — Structural
10/25/2023
Objection resolved — Addressed
10/24/2023
Filed — No Work
B00952132-I1
10/13/2023
Permit issued — General Construction
B00939738-I1-GC
10/09/2023
Filed — Alteration
HEREBY SUBMITTING GENERAL CONSTRUCTION PLANS FOR TEMPORARY MIGRANT FACILITY (HERRC SITE) IN CONJUNCTION WITH ALT1 APPLICANT #321197272. APPLICATION FILED AS PER BROOKLYN BOROUGH COMMISSIONER REDA SHEHATA
B00939738-I1
10/04/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/17/2023
Violation issued (ECB, closed)
Construction
09/13/2023
Filed — Alteration
Install emergency generator.
B00338582-S2
09/13/2023
Filed — Alteration
Install plumbing systems per plans filed herewith and in conjunction with A1#321197272
B00338846-S1
09/12/2023
Special inspection requirement — Mechanical Systems
JIAN DENG
Latest 60 of 184 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFRANK MOORE05/13/2026
DOB NOWBoiler EquipmentPermit IssuedFRANK MOORE11/03/2025
DOB NOWMechanical SystemsSigned-off213 W 40TH ST MANAGEMENT03/12/2025
DOB NOWMechanical SystemsSigned-off213 W 40TH ST MANAGEMENT12/08/2023
DOB NOWStandpipePermit IssuedA M B MECHANICAL INC10/25/2023
DOB NOWSprinklersPermit IssuedA M B MECHANICAL INC10/25/2023
DOB NOWGeneral ConstructionSigned-off213 W 40TH ST MANAGEMENT10/13/2023
DOB NOWStructuralSigned-off213 W 40TH ST MANAGEMENT08/07/2023
DOB NOWSprinklersPermit IssuedAAA TOTAL PLUMBING INC06/21/2023
DOB NOWStandpipePermit IssuedAAA TOTAL PLUMBING INC06/21/2023
DOB NOWSupported ScaffoldSigned-offA H INSTALLATION06/14/2023
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP05/12/2023
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP05/12/2023
DOB NOWSprinklersPermit IssuedGW MECHANICAL CORP05/11/2023
DOB NOWStandpipePermit IssuedGW MECHANICAL CORP05/11/2023
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/10/2023
DOB NOWSupported ScaffoldSigned-offA H INSTALLATION03/28/2023
DOB NOWMechanical SystemsSigned-off213 W 40TH ST MANAGEMENT02/24/2023
DOB NOWStandpipePermit IssuedGW MECHANICAL CORP01/10/2023
DOB NOWSprinklersPermit IssuedGW MECHANICAL CORP01/05/2023
DOB NOWMechanical SystemsSigned-offATLAS BUILDERS LLC11/03/2022
DOB NOWSupported ScaffoldSigned-offSKYLINE SCAFFOLDING GROUP10/14/2022
DOB NOWProtection and Mechanical MethodsSigned-offSKYLINE SCAFFOLDING GROUP10/12/2022
DOB NOWSidewalk ShedSigned-offTOPLINE NYC CONTRACTING05/09/2022
DOB NOWMechanical SystemsSigned-offATLAS BUILDERS LLC10/25/2021
DOB NOWMechanical SystemsSigned-offATLAS BUILDERS LLC08/26/2021
BISEQISSUED213 W 40TH ST MANAGEMENT12/11/2023
BIS—ISSUED213 W 40TH ST MANAGEMENT12/11/2023
BISSDISSUEDPRIME PIPING & HEATING IN11/02/2023
BISOTISSUED213 W 40TH ST MANAGEMENT09/06/2023
BIS—ISSUED213 W 40TH ST MANAGEMENT12/08/2022
BIS—ISSUED213 W 40TH ST MANAGEMENT12/08/2022
BISEQISSUED213 W 40TH ST MANAGEMENT12/08/2022
BISSDISSUEDPHOENIX PLMBG & MECH CORP11/10/2022
BIS—ISSUEDATLAS BUILDERS LLC10/14/2022
BIS—ISSUEDATLAS BUILDERS LLC09/21/2022
BIS—ISSUEDATLAS BUILDERS LLC03/11/2022
BISEQISSUEDATLAS BUILDERS LLC03/09/2022
BISEQISSUEDATLAS BUILDERS LLC12/14/2021
BIS—ISSUEDATLAS BUILDERS LLC11/30/2021
+ 36 more permits on file
1 project · most recent 05/06/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
05/06/2026——Gas, Storm, Water/Sanitary
5 projects · most recent 08/08/2024
General Wiring
FiledStatusContractorScope
08/08/2024CompleteCITY WIDE ELECL CONTS INCGeneral Wiring
06/02/2022CompleteCITY WIDE ELECL CONTS INC2 meters, 2 new_meters
05/09/2022CompleteRICHARD NEU—
08/16/2021CompleteSTAR ELEC'L CONTRACTORS C—
03/18/2020CompleteCITY WIDE ELECL CONTS INC—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
05/28/2026Pass-Final Boiler Equipment InspectionPassView ↗
10/11/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
08/05/2024Pass-Final General Construction Non-Directive 14PassView ↗
04/17/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/12/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
04/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/12/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/09/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/09/2023Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 29
DateRequirementInspectorRole
05/06/2026Fuel-Oil Storage and Fuel-Oil Piping SystemsGregory Mortmanspecial
01/10/2024FinalJIAN DENGprogress
01/08/2024FinalJIAN DENGprogress
11/22/2023Sprinkler SystemsJIAN DENGspecial
11/22/2023Standpipe SystemsJIAN DENGspecial
11/20/2023FinalJIAN DENGprogress
11/14/2023Sprinkler SystemsJIAN DENGspecial
11/14/2023Standpipe SystemsJIAN DENGspecial
11/13/2023Energy Code Compliance InspectionsMarisa Harteprogress
11/13/2023HVAC and service water heating equipment JIAN DENGenergy_progress
11/13/2023HVAC and service water heating system controls JIAN DENGenergy_progress
11/13/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMarisa Hartespecial
09/12/2023Mechanical SystemsJIAN DENGspecial
09/12/2023FinalJIAN DENGprogress
09/12/2023Fuel-Oil Storage and Fuel-Oil Piping SystemsShahrish Shuvospecial
06/26/2023FinalJIAN DENGprogress
06/26/2023Structural Cold-Formed SteelJIAN DENGspecial
06/26/2023Structural Steel - DetailsJIAN DENGspecial
06/26/2023Structural Steel - High Strength BoltingJIAN DENGspecial
06/26/2023Structural Steel - WeldingJIAN DENGspecial
05/30/2023Sprinkler SystemsMarisa Hartespecial
05/30/2023Standpipe SystemsMarisa Hartespecial
03/30/2020Energy Code Compliance InspectionsJIAN DENGprogress
03/30/2020Shutoff dampersJIAN DENGenergy_progress
03/30/2020HVAC and service water heating system controls JIAN DENGenergy_progress
Latest 25 of 29.
▾Documents — 675 on file (BIS + DOB NOW)
▸Plans & Drawings32
▸DOB NOWPlans/Sketch17
09/02/2026B00338582-S2Request digital key ↗
08/28/2026B08001401-I1Request digital key ↗
08/28/2026B08001401-P1Request digital key ↗
Showing 3 of 17 on file for this type
▸DOB NOWPlans/Sketch - Plumbing4
08/17/2026B00338846-I1Request digital key ↗
08/17/2026B00338846-P1Request digital key ↗
08/17/2026B00338846-P2Request digital key ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlans/Sketch - Sprinkler3
08/26/2026B00338554-P1Request digital key ↗
08/26/2026B00338554-I1Request digital key ↗
08/15/2026B00338554-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Temporary Place of Assembly3
08/26/2026B00952132-I1Request digital key ↗
08/23/2026B01138609-I1Request digital key ↗
08/16/2026B01443679-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Standpipe3
08/26/2026B00338554-I1Request digital key ↗
08/26/2026B00338554-P1Request digital key ↗
08/15/2026B00338554-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Antenna1
09/02/2026B00351942-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/02/2026B00338582-I1Request digital key ↗
▸Applications & Permits157
▸BISPLAN / WORK APPROVAL APPLICATION93
02/27/2026321197272Open ↗
07/01/2025321197272Open ↗
06/26/2025321197272Open ↗
Showing 3 of 93 on file for this type
▸BISWORK PERMIT APPLICATION57
12/14/2023321197272Open ↗
12/14/2023321197272Open ↗
11/03/2023321192035Open ↗
Showing 3 of 57 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
12/29/2022340357802Open ↗
Showing 1 of 3 on file for this type
▸Zoning, Tax Lot & Property Records7
▸BISZONING DIAGRAM3
04/26/2022321197272Open ↗
Showing 1 of 3 on file for this type
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISVERIFY TAX LOT1
11/20/2023321197272Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
09/26/2023321197272Open ↗
▸Seals & Professional Certifications119
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION35
09/07/2023340894697Open ↗
08/16/2023340894697Open ↗
Showing 2 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature29
08/29/2026B00726445-I1Open ↗
08/28/2026B08001401-P1Open ↗
08/28/2026B08001401-I1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
08/30/2026B00338582-S2Open ↗
08/29/2026B00338846-S1Open ↗
08/29/2026B00338554-P1Open ↗
Showing 3 of 11 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature10
08/30/2026B00338582-S2Open ↗
08/28/2026B00338846-P3Open ↗
08/28/2026B00338846-P3Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY7
07/19/2023340894697Open ↗
Showing 1 of 7 on file for this type
▸BISAPPLICANT OWNER SIGNATURE7
07/19/2023340894697Open ↗
Showing 1 of 7 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Trade Schedules & Equipment10
▸BISSCHEDULE B - PLUMBING5
06/02/2023321192035Open ↗
06/01/2023321192035Open ↗
Showing 2 of 5 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST3
08/01/2023321197272Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISBPP: STREET TREES SITE PLAN1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos29
▸BISDEP ASBESTOS PROJECT COMPLETION FORM10
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)8
07/26/2023340894697Open ↗
07/19/2023340894697Open ↗
Showing 2 of 8 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form5
08/26/2026B00939738-I1Open ↗
08/13/2026B00338582-I1Open ↗
08/13/2026B00338846-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report3
08/13/2026B00338846-S1Open ↗
08/13/2026B00896214-I1Open ↗
08/13/2026B00338582-S2Open ↗
▸Energy Compliance19
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY11
02/13/2025321197272Open ↗
02/05/2024321197272Open ↗
02/05/2024321197272Open ↗
Showing 3 of 11 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISINSULATION PLACEMENT & R VALUES1
01/11/2024321197272Open ↗
▸BISELECTRIC MOTORS1
01/11/2024321197272Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00338582-I1Open ↗
▸Inspections & Test Reports52
▸BISTECHNICAL REPORT: RESPONSIBILITY36
06/24/2025321192035Open ↗
02/05/2024321197272Open ↗
02/05/2024321197272Open ↗
Showing 3 of 36 on file for this type
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISTECHNICAL REPORT: CONCRETE/TEST CYLINDER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISTECHNICAL REPORT: PHOTOLUMINESCENCE2
02/05/2024321197272Open ↗
02/05/2024321197272Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
01/11/2024321197272Open ↗
▸BISSPRAYED FIRE-RESISTANT MATERIALS1
01/11/2024321197272Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS1
01/11/2024321197272Open ↗
▸BISSTRUCTURAL STEEL - WELDING1
01/11/2024321197272Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
01/11/2024321197272Open ↗
▸Approvals, Objections & Sign-offs70
▸BISLETTERS - SUPPORTING DOCUMENTATION27
05/06/2025321197272Open ↗
11/22/2023321197272Open ↗
11/22/2023321197272Open ↗
Showing 3 of 27 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE25
02/27/2026321197272Open ↗
07/01/2025321197272Open ↗
06/23/2025321197272Open ↗
Showing 3 of 25 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSUPERSEDING LETTER4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISLANDMARKS APPROVAL2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISFINAL2
06/24/2025321192035Open ↗
10/05/2023340129532Open ↗
▸Cost, Insurance & Ownership31
▸BISCOST AFFIDAVIT20
07/26/2023340894697Open ↗
Showing 1 of 20 on file for this type
▸BISPROJECT-SPECIFIC GL INSURANCE7
12/14/2023321197272Open ↗
12/09/2022321197272Open ↗
03/16/2022321197272Open ↗
Showing 3 of 7 on file for this type
▸BISAcord 25 (Acord Certificate of Liability Insurance)4
12/14/2023321197272Open ↗
03/16/2022321197272Open ↗
Showing 2 of 4 on file for this type
▸Filing & Intake Forms77
▸BISADDITIONAL INFORMATION43
04/29/2025321197272Open ↗
02/27/2024321197272Open ↗
11/22/2023321197272Open ↗
Showing 3 of 43 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET17
07/19/2023340894697Open ↗
Showing 1 of 17 on file for this type
▸BISEFILING COVER SHEET13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISBOROUGH INTAKE FORM4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸Other Documents15
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸DOB NOWPro Cert Restriction Exception (LL158/17)3
08/13/2026B00939738-P2Open ↗
08/13/2026B00939738-I1Open ↗
08/13/2026B00939738-P1Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSTRUCTURAL COLD-FORMED STEEL1
01/11/2024321197272Open ↗
▸BISMAINTENANCE INFORMATION1
01/11/2024321197272Open ↗
▸BISTCO - Supporting Documents1
05/09/2025321197272Open ↗
▸BIS* LOADING DECK WEATHER SEALS1
01/11/2024321197272Open ↗