← Back
Condo, residential unit in elevator building
Ariana Condominium
29 TIFFANY PLACE · BIN 3345585
💬 Discuss this project
1930Year Built
8Stories
R4Building Class
R7AZoning
83,275 sfGross Floor Area
104Units
LL97 CoveredRent Stabilized15 Open Violations 11 unresolved · 4 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: THE ARIANA CONDOMINIUM · 27,454 sf lot · 3.03 FAR built · Flood zone X500
Locations of Work
ArchitectureMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 15 docs
Floor 31p · 1 filing · 4 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
PLATINUM SERVICES NY607/08/2026
CEPRINE CONSTRUCTION607/08/2026
THE 200 WEST 79TH STREET CONDOMINIU503/22/2026
ARIANA CONDOMINIUM8903/22/2026
TIFFANY MEMS LTD PRTN103/22/2026
UP GRADE CONTRACTING CO,I103/22/2026
TUDOR REALTY SERVICE1603/22/2026
PRAT ENTERPRISES403/21/2026
ARIANA CONDO - TUDOR REALITY SER703/21/2026
ARIANA CONDOMINIUM C O TRS303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
J CALLAHAN CONSULTING203/21/2026
EUROCELT EXPEDITING, INC203/21/2026
HLZAE203/21/2026
GREEN STUDIO203/21/2026
OUTSOURCE CONSULTANTS, INC.103/21/2026
Rigid Structural Design, LLC103/21/2026
RIGGING CONSULTANTS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CEPRINE CONSTRUCTION INCGeneral Contractor407/08/2026
PLATINUM SERVICES NY LLCGeneral Contractor407/08/2026
ALBAN BELLIElectrical303/21/2026
THE ORGANIC GARDENER NYC*General Contractor303/21/2026
HYSA ELECTRICIANS CORP 005307General Contractor203/22/2026
BENT MECHANICAL CORPPlumbing203/22/2026
CASTCAPA CONSTRUCTION LLCGeneral Contractor207/08/2026
FALCO ELEC'L SERVICES INCElectrical103/22/2026
ANTONIO CERIELLO ELEC INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HOWARD L ZIMMERMAN ARCHIT1712208/29/2024
OUTSOURCE SPECIAL INSPECT2827103/17/2023
Building Lifecycle
All (135)Filed (10)Permit Issued (10)Signed Off (5)Facade (FISP) (18)Violation (60)Objection (18)Special Inspection (14)
08/06/2026
Permit issued — Suspended Scaffold
B01434865-I1-SC
08/05/2026
Objection resolved — Addressed
07/31/2026
Objection raised — Other
07/27/2026
Filed — Alteration
FISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS SEE ATTACHED PLANS Designated Primary Site supervisor: Nicholas Kagios, Special Rigger # 7720
B01434865-I1
06/24/2026
Signed off — Alteration
Rigging for Industrial Rope Access
B01398294-I1
06/16/2026
Permit issued — Suspended Scaffold
B01398294-I1-SC
05/13/2026
Filed — Alteration
Rigging for Industrial Rope Access
B01398294-I1
08/04/2025
Signed off — Alteration
FACADE REPAIRS, BRICK MASONRY REPAIRS, WINDOW SILL REPAIRS,/REPLACEMENT, COPING STONE REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00933796-I1
07/03/2025
Violation issued (ECB, closed)
Elevators
03/26/2025
Cycle 9 facade report submitted
03/26/2025
Cycle 9 facade report signed — SAFE
03/14/2025
Cycle 9 facade inspection completed
03/03/2025
Signed off — Alteration
B00807107-I1
02/07/2025
Permit issued — General Construction
B00933796-I1-GC
12/16/2024
Cycle 9 facade report submitted
12/16/2024
Cycle 9 facade report signed — UNSAFE
12/10/2024
Cycle 9 facade inspection completed
09/10/2024
Violation issued (FDNY_NOV, closed)
09/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Zimmerman
09/10/2024
Special inspection requirement — Tenant Protection Plan Compliance
Howard Zimmerman
09/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
09/10/2024
Special inspection requirement — Masonry
Howard Zimmerman
09/10/2024
Special inspection requirement — Final
Howard Zimmerman
09/10/2024
Special inspection requirement — Fenestration air leakage
Howard Zimmerman
09/04/2024
Objection raised — Admin
09/04/2024
Objection resolved — Addressed
08/29/2024
Filed — Alteration
FACADE REPAIRS, BRICK MASONRY REPAIRS, WINDOW SILL REPAIRS,/REPLACEMENT, COPING STONE REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00933796-P1
08/26/2024
Special inspection requirement — Tenant Protection Plan Compliance
07/23/2024
Signed off — Alteration
Installation of a temporary vertical netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00901758-I1
06/24/2024
Special inspection requirement — Fenestration air leakage
Howard Zimmerman
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Howard Zimmerman
06/24/2024
Special inspection requirement — Masonry
Howard Zimmerman
06/24/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Howard Zimmerman
06/24/2024
Special inspection requirement — Final
Howard Zimmerman
05/16/2024
Violation issued (FDNY_NOV, closed)
04/09/2024
Permit issued — Suspended Scaffold
B01025021-I1-SC
04/04/2024
Filed — Alteration
Permit Renewal for Facade Restoration via Suspended Scaffolding
B01025021-I1
02/01/2024
Permit issued — General Construction
B00933796-I1-GC
12/15/2023
Permit issued — Sidewalk Shed
B00807107-I1-SH
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/02/2023
Objection resolved — Addressed
11/01/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/25/2023
Objection raised — Admin
10/24/2023
Objection resolved — Addressed
10/24/2023
Objection resolved — Addressed
10/24/2023
Objection resolved — Addressed
10/13/2023
Objection raised — Scope
10/13/2023
Objection raised — Inspections
10/13/2023
Objection raised — Zoning
10/13/2023
Objection raised — Other
10/13/2023
Objection raised — Other
10/13/2023
Objection raised — Energy
10/06/2023
Filed — Alteration
FACADE REPAIRS, BRICK MASONRY REPAIRS, WINDOW SILL REPAIRS,/REPLACEMENT, COPING STONE REPLACEMENT. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00933796-I1
07/11/2023
Filed — Alteration
Installation of a temporary vertical netting per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
B00901758-I1
04/18/2023
Permit issued — General Construction
B00832701-I1-GC
03/17/2023
Filed — Alteration
B00832701-I1
03/09/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/09/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedKLG CONTRACTING INC08/06/2026
DOB NOWSuspended ScaffoldPermit IssuedCERINA GENERAL CONTR. INC06/16/2026
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION02/07/2025
DOB NOWSuspended ScaffoldPermit IssuedSPD CONSTRUCTION CORP04/09/2024
DOB NOWGeneral ConstructionSigned-offCASTCAPA CONSTRUCTION02/01/2024
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC12/15/2023
DOB NOWGeneral ConstructionPermit IssuedTHE ORGANIC GARDENER NYC*04/18/2023
DOB NOWSidewalk ShedSigned-offPLATINUM SERVICES NY LLC01/07/2023
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC09/25/2018
DOB NOWSidewalk ShedSigned-offCEPRINE CONSTRUCTION INC04/24/2018
BISSPISSUEDARIANA CONTRACTING INC08/10/2020
BISPLISSUEDABR PLBG&HTG CONTR INC08/06/2020
BISPLISSUEDAPOLLO PLBG & HTG INC01/14/2020
BISOTISSUEDCARICIC CONSTRUCTION INC09/16/2019
BISPLISSUEDDPH PLUMBING & HTG CORP09/10/2019
BISOTISSUEDRISE CONSTRUCTION SOLUTIO05/06/2019
BISPLISSUEDMAXWELL PLUMB MECH. CORP01/23/2019
BISPLISSUEDORBIT PLBG & HTG INC11/28/2018
BISOTISSUEDL.A.G CPONSTRUCTION INC10/25/2018
BISOTISSUEDWOODBURY CONSTRUCTION SER09/25/2018
BISSPISSUEDABR PLBG & HTG CONTR. INC09/05/2018
BISOTISSUEDMAIDA CONSTRUCTION INC04/17/2018
BISOTISSUEDCPM BUILDERS INC08/09/2017
BISSPISSUEDKG SPRINKLER CORP06/21/2017
BISPLISSUEDHENRY MYERS P & H, INC06/21/2017
BISPLISSUEDARK-POL PLUMBING CORP05/12/2017
BISMHISSUEDCPM BUILDERS INC10/21/2016
BISSPISSUEDCN PLUMBING INC10/18/2016
BISOTISSUEDRODON HOME IMPROVEMENT IN07/06/2016
BISMHISSUEDCREATIVE RENOVATIONS LLC06/24/2016
BISOTISSUEDCREATIVE RENOVATIONS LLC06/24/2016
BISSPISSUEDTMS PLUMBING & HTG CORP04/06/2016
BISPLISSUEDABR PLBG&HTG CONTR INC04/06/2016
BISPLISSUEDBT'S PLUMBING AND HEATING04/01/2016
BISOTISSUEDKBRNY, INC04/01/2016
BISMHISSUEDDMV MECHANICAL03/31/2016
BISPLISSUEDARK-POL PLUMBING CORP03/24/2016
BISOTISSUEDRODON HOME IMPROVEMENT IN03/17/2016
BISSPISSUEDKG SPRINKLER CORP03/14/2016
BISPLISSUEDHENRY MYERS P & H, INC03/14/2016
+ 20 more permits on file
12 projects · most recent 04/28/2026
General Wiring
FiledStatusContractorScope
04/28/2026CompleteLENS ELECTRIC, INC—
01/28/2026CompleteANI ELECTRIC CORP—
05/19/2025CompleteHYSA ELECTRICIANS CORPGeneral Wiring
10/26/2023Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
07/20/2023CompleteSALVATORE CAMPISI & SONSGeneral Wiring
01/04/2023Permit IssuedILLUMINOUS ELECTRIC CORP.General Wiring
05/09/2022CompleteFALCO ELEC'L SERVICES INC—
12/15/2021Permit IssuedANTONIO CERIELLO ELEC INCGeneral Wiring
01/06/2021CompleteBIG CITY ELECTRICAL CONT—
06/22/2020Permit IssuedAERO ELECTRIC CORPGeneral Wiring
05/22/2019CompleteCRESCO ELECTRICAL CORP—
04/23/2018Permit IssuedMAXIMUM ELECTRIC CORP.—
2 projects · most recent 07/27/2026
Suspended Scaffold (SC)
FiledStatusContractorScope
07/27/2026Permit IssuedKLG CONTRACTING INC—
04/04/2024Permit Issued—Suspended Scaffold (SC)
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/10/2024Fire-Resistant Penetrations and JointsHoward Zimmermanspecial
09/10/2024Tenant Protection Plan ComplianceHoward Zimmermanspecial
09/10/2024Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
09/10/2024MasonryHoward Zimmermanspecial
09/10/2024FinalHoward Zimmermanprogress
09/10/2024Fenestration air leakageHoward Zimmermanenergy_progress
08/26/2024Tenant Protection Plan Compliance—special
06/24/2024Fenestration air leakageHoward Zimmermanenergy_progress
06/24/2024Fire-Resistant Penetrations and JointsHoward Zimmermanspecial
06/24/2024MasonryHoward Zimmermanspecial
06/24/2024Structural Stability – Alterations of existing buildingsHoward Zimmermanspecial
06/24/2024FinalHoward Zimmermanprogress
02/22/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
02/21/2023FinalJONAR MADRIAGAprogress
▾Documents — 655 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
09/03/2026B00037623-I1Request digital key ↗
08/28/2026B00807107-I1Request digital key ↗
08/27/2026B00832701-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
09/02/2026B00339223-I1Request digital key ↗
▸Applications & Permits128
▸BISWORK PERMIT APPLICATION66
09/03/2020301105435Open ↗
08/10/2020321967537Open ↗
01/16/2020321967537Open ↗
Showing 3 of 66 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION56
06/05/2020340533195Open ↗
04/07/2020340723667Open ↗
12/11/2019301105435Open ↗
Showing 3 of 56 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications118
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION77
02/01/2020321361101Open ↗
09/28/2019301481331Open ↗
09/20/2019321956790Open ↗
Showing 3 of 77 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
09/03/2026B00037623-I1Open ↗
08/28/2026B00807107-I1Open ↗
08/27/2026B00832701-I1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST7
04/02/2019321803303Open ↗
Showing 1 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE5
04/07/2020340723667Open ↗
07/19/2018340616854Open ↗
08/15/2017340533220Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/25/2026B00933796-I1Open ↗
08/25/2026B00933796-I1Open ↗
08/24/2026B00933796-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/25/2026B00933796-I1Open ↗
08/25/2026B00933796-I1Open ↗
08/24/2026B00933796-P1Open ↗
Showing 3 of 4 on file for this type
▸BISProfessional and Owner Certification (POC3)3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
04/02/2019321803303Open ↗
08/19/2018340624989Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/19/2018340624989Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/19/2018340624989Open ↗
▸Trade Schedules & Equipment61
▸BISSELF-CERT PLUMBING NOTICE27
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 27 on file for this type
▸BISSCHEDULE B - PLUMBING21
06/05/2020340533195Open ↗
08/19/2018340624989Open ↗
07/19/2018340616854Open ↗
Showing 3 of 21 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE7
06/25/2019321967537Open ↗
04/02/2019321803303Open ↗
Showing 2 of 7 on file for this type
▸BISSPRINKLER INSP REPORT : FP-855
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISSPRINKLER SYSTEMS1
04/24/2024321967537Open ↗
▸Safety & Tenant Protection10
▸BISTenant Protection Plan and Notes9
04/07/2020340723667Open ↗
06/25/2019321967537Open ↗
04/18/2019321956790Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026B00339223-I1Open ↗
▸Environmental & Asbestos41
▸BISASBESTOS: CERTIFICATION (DEP ACP5)20
04/07/2020340723667Open ↗
06/25/2019321967537Open ↗
04/18/2019321956790Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'11
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 11 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026B00832701-I1Open ↗
08/13/2026B00339223-I1Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/24/2026B00933796-I1Open ↗
▸Energy Compliance63
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS37
02/01/2020321361101Open ↗
10/04/2019321956790Open ↗
10/04/2019321956790Open ↗
Showing 3 of 37 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS14
02/01/2020321361101Open ↗
10/04/2019321956790Open ↗
01/24/2019340616854Open ↗
Showing 3 of 14 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY5
08/04/2020340533195Open ↗
05/08/2020340723667Open ↗
07/19/2018340616854Open ↗
Showing 3 of 5 on file for this type
▸BISTR8: Energy Code Progress Inspections3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISTECHNICAL REPORT: ENERGY3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/04/2020340533195Open ↗
▸Inspections & Test Reports14
▸BISTECHNICAL REPORT: RESPONSIBILITY12
12/22/2020301105435Open ↗
08/04/2020340533195Open ↗
08/04/2020340533195Open ↗
Showing 3 of 12 on file for this type
▸BISINSPECTION REPORT - SUPPORTING DOCUMENTATION1
01/24/2019340616854Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Approvals, Objections & Sign-offs68
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST36
12/22/2020301105435Open ↗
08/04/2020340533195Open ↗
02/01/2020321361101Open ↗
Showing 3 of 36 on file for this type
▸BISADMINISTRATIVE OBJECTIONS21
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 21 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION8
07/29/2020301105435Open ↗
07/29/2020301105435Open ↗
07/29/2020301105435Open ↗
Showing 3 of 8 on file for this type
▸BISSUPERSEDING LETTER1
11/27/2018340533195Open ↗
▸BISSHED LETTER1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWDEP Variance (V5) letter1
08/13/2026B00933796-I1Open ↗
▸Cost, Insurance & Ownership66
▸BISCOST AFFIDAVIT63
12/17/2020301105435Open ↗
04/07/2020340723667Open ↗
07/25/2019301481331Open ↗
Showing 3 of 63 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
01/27/2022321967537Open ↗
08/04/2020340533195Open ↗
▸BISAcord 25 (Acord Certificate of Liability Insurance)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Filing & Intake Forms69
▸BISEFILING COVER SHEET30
06/25/2019321967537Open ↗
06/25/2019321967537Open ↗
04/18/2019321956790Open ↗
Showing 3 of 30 on file for this type
▸BISADDITIONAL INFORMATION19
06/19/2020340533195Open ↗
05/08/2020340723667Open ↗
03/12/2020301105435Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM14
02/01/2020321361101Open ↗
10/04/2019321956790Open ↗
09/28/2019301481331Open ↗
Showing 3 of 14 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
04/07/2020340723667Open ↗
08/19/2018340624989Open ↗
07/19/2018340616854Open ↗
Showing 3 of 6 on file for this type
▸Other Documents7
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
02/23/2017321301532Open ↗
Showing 1 of 2 on file for this type
▸DOB NOWIRA Certification2
08/17/2026B01398294-I1Open ↗
08/15/2026B01434865-I1Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
03/23/2017321420761Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01025021-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01025021-I1Open ↗